Most viewed |

160526 5302263 viewsWest Kalgoorlie, SCT train 3MP9 operating from Melbourne to Perth, PBHY type covered van PBHY 0044 Greater Freighter, one of a second batch of thirty units built by Gemco WA without the Greater Freighter signage.
|
|

160530 9167263 viewsParkeston, SCT train 7GP1 which operates from Parkes NSW (Goobang Junction) to Perth departs the mainline behind SCT class SCT 013 serial 08-1737 an EDI Downer built EMD model GT46C-ACe.
|
|

160530 9211263 viewsParkeston, SCT train 7GP1 which operates from Parkes NSW (Goobang Junction) to Perth, PWWY type PWWY 0016 one of forty well waggons built by Bradken NSW for SCT, loaded with two 48' MFG1 type Rail Container boxes SCFU 412598 and SCFU 412544.
|
|

160530 9232263 viewsParkeston, SCT train 7GP1 which operates from Parkes NSW (Goobang Junction) to Perth, PBGY type covered van PBGY 0116 Multi-Freighter, one of eighty units built by Gemco WA, with Independent Brake signage.
|
|

161111 2476263 viewsBinduli, Kalgoorlie Freighter train 5025, diesel fuel tank waggon ATPY 587 built by Westrail Midland Workshops in 1978 for Mobil, later sold to BP, as type WJP then recoded to WJPY, 80.66 kL one compartment one dome, original code and fleet no. visible, with a capacity now of 80000 litres.
|
|

161111 2477263 viewsBinduli, Kalgoorlie Freighter train 5025, NTAY type fuel tank waggon NTAY 5452, orignally built by Indeng Qld for Mobil as part of a batch of seven NTAF tanks in 1981 as NTAF 452. Refurbished by Gemco WA for BP Oil, capacity of 61000 litres.
|
|

161111 2500263 viewsBinduli, Kalgoorlie Freighter train 5025, waggon AQRY 1015
|
|

161111 2530263 viewsBinduli, Kalgoorlie Freighter train 5025, waggon AQHY 30034 with sulphuric acid tank CSA 0136, originally built by the WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH type to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana.
|
|

161111 2536263 viewsBinduli, Kalgoorlie Freighter train 5025, waggon AQHY 30064 with sulphuric acid tank CSA 0119, originally built by the WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH type to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana.
|
|

161112 3031263 viewsWest Kalgoorlie, loaded Malcolm sulphur train 6029, AQNY type waggon AQNY 32175 one of sixty two waggons built by Goninan WA in 1998 as WQN type for Murrin Murrin container traffic with a Bis Industries roll-top type UA55 container SBIU 200626 and an un-decaled hard-top type 25U0 container BISU 100057.
|
|

161116 5111263 viewsWest Kalgoorlie, Shell fuel train 3442, tank waggon ATBY 14592, built by Westrail Midland Workshops 1981 for Bain Leasing as type JPB, 82 kL, on narrow gauge as JPBA, then SG WJPB, note vacuum brake pipe and type F InterLock coupler, 6130 has conventional style coupler.
|
|

040912 142144263 viewsNelson Point, Silver Star observation coach, 'Sundowner', 3/4 view of rear end, shows lighting arrangement, end of train markers. Originally built by E. G. Budd in 1939 numbered 301 as the Silver Star as a diner-parlour-observation coach on the Chicago, Burlington and Quincy Railroad's General Pershing Zephyr train from the 1930s and 1940s. Donated to Mt Newman Mining Co. by AMAX an original joint venture partner to commemorate the projects first 100 million tonnes of iron ore railed between Mount Whaleback mine and the Port Hedland port.
|
|

030403 154946263 viewsGladstone, former South Australian Railways AE Goodwin built DL500G ALCo designated the 700 class, class leader 701 serial G6042-2, B end cab side shot, leads a grain train being loaded on the 3rd April 2003.
|
|

030403 162352263 viewsCrystal Brook, view from rear of CLF class leader CLF 1 'City of Whyalla' serial 93-AN-1, rebuilt by MKA to EMD model AT26C-2M from CL class unit CL 2 in 1993. 3rd April 2003.
|
|

030404 103000263 viewsPort Augusta, Goninan built GE model Cv40-9i NR class unit NR 30 serial 7250-05 / 97-232 was painted in a Bessie Liddle of Alice Springs designed aboriginal livery titled 'Warmi' or the snake, John Moriarty of Balarinji Design did the artwork.
|
|

170728 10007263 viewsBenson Falls, 91 km curve, an empty train blasts up the steep grade behind a General Electric built Dash 9-44CW unit 7072 serial 47751 leads two General Electric built ES44DCi units 8140 and 8158, 7072 is from the original delivery of Dash 9-44CW units in 1994 and is showing its age. 28th July 2017. GeoData.
|
|

23879263 viewsBassendean, Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M. July 1993.
Jim Bisdee photo.
|
|

242-15263 viewsNelson Point, Loco Overhaul Shop, General Electric built AC6000 locomotive 6076 'Mt Goldsworthy' serial 51068 with engine and alternator removed. May 2002.
|
|

190107 0546263 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00340 built by CSR Yangtze Co China serial 2014/382-340 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0573263 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00262 built by CSR Yangtze Co China serial 2014/382-262 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
16952 files on 848 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
380 |  |
 |
 |
 |
 |
 |
 |
|