Most viewed |

161111 2529417 viewsBinduli, Kalgoorlie Freighter train 5025, waggon AQHY 30110 with sulphuric acid tank CSA 0118, originally built by the WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH type to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana.
|
|

161116 5549417 viewsBinduli, empty Shell fuel train 4443, NTBF type tank waggon NTBF 6120, built by Comeng NSW in 1975 as an SCA type bitumen tanker for Shell Bitumen NSW as SCA 271.
|
|

050518 2129417 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 750, shows bogie detail, AT & SF CS-3000 bogie casting with CFCLA id of CQFE 093
|
|

050407 0379417 viewsNelson Point yard hard stand area sees brand new having only been delivered, BHP track tamper support trailer for Tamper 3 which will arrive in a couple of days. Plasser Australia 09-3X model with serial M480. 7th April 2005.
|
|

050409 0393417 viewsShell Swagman Roadhouse, Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480. 9th April 2005.
|
|

060501 3926417 viewsAbydos Siding backtrack, Speno rail grinder RG 1, a RR24 model grinder with 24 grinding wheels, serial M20, generating set and second driving cab module, view of Matisa drive bogie plate. 1st May 2006.
|
|

060723 7824417 viewsOriginal Hamersley Iron compressor waggon sets IC-1 and IC-3 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile 23rd July 2006.
|
|

23761417 viewsBassendean, Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M and the ARHS former WAGR B class shunt engine. January 1993.
Jim Bisdee photo.
|
|

241-08417 viewsNelson Point, Goninan GE rebuild C36-7M unit 5506 serial 4839-01 / 87-071 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. Drivers cab side view. 5506 was rebuilt from NSW AE Goodwin built C636 ALCo number 5455 serial G6012-04 and was delivered in Mt Newman orange livery and originally named 'Mt Whaleback', after repainting into BHP blue was named 'Ethel Creek', then finally 'Mt Goldsworthy'. June 2002.
|
|

190107 0447417 viewsParkeston, Mineral Resources Ltd MHPY type iron ore waggon MHPY 00014 built by CSR Yangtze Co China in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0455417 viewsParkeston, Mineral Resources Ltd MHPY type iron ore waggon MHPY 00363 built by CSR Yangtze Co China in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0542417 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00121 built by CSR Yangtze Co China serial 2014/382-121 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0622417 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00148 built by CSR Yangtze Co China serial 2014/382-148 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1593417 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00175 built by CSR Yangtze Co China serial 2014/382-175 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1635417 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00149 built by CSR Yangtze Co China serial 2014/382-149 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

247-37417 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train passes under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8 locomotives led by 9425 with 9410, 9420 and last unit 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 riding on Dofasco bogies and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. Location is here.22nd May 2002.
|
|

250-14417 viewsPelican Siding on the Hamersley Iron Tom Price line about the 208 km with an empty train behind the standard pairing of two General Electric built 9-44CW units 7068 serial 47747 and 7067 serial 47746 stand on the loop or passing track for a meet with a loaded train. 1550 hrs 21st October 2000.
|
|

254-12417 viewsGreen Tank Pool, August 2001. Geodata location here.
|
|

210407 9913417 viewsParkeston, 2MP5 intermodal train, CQWY type well waggon CQWY 5034 well 1, the well waggon pairs were built by Bluebird Rail Operations SA in a batch of sixty pairs in 2008 for CFCLA.
|
|

210407 9915417 viewsParkeston, 2MP5 intermodal train, CQWY type well waggon CQWY 5035 well 1, the well waggon pairs were built by Bluebird Rail Operations SA in a batch of sixty pairs in 2008 for CFCLA.
|
|
| 19096 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
440 |  |
 |
 |
 |
 |
 |
 |
|