Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
051101_6483.jpg
051101 6483337 viewsParkeston, AHBY 0059 one of sixty five AHBY type ballast hoppers built by EDI Rail at their Port Augusta Workshops for ARG in 2001-02 for the Darwin line, also the FMG construction in 2008, here in limestone quarry products service.
224-09.jpg
224-09337 viewsBing siding, 6073 'Fortescue' serial 51065 a General Electric AC6000 built by GE at Erie awaits the road to depart south, cab side shows new nameplate, steerable bogie and taper in cab side. GeoData.
229-13.jpg
229-13337 viewsYandi Two balloon switch, empty BHP train heading for the loadout with mid-train remote unit Goninan rebuild CM40-8M GE units 5660 'Kure' serial 8412-05 / 94-151. GeoData.
151111_9532.jpg
151111 9532337 viewsA loaded train behind General Electric ES44DCi units 8113 serial 59105 in the original silver livery and 8145 serial 58726 in the tiger strip Rio livery and Dash 9-44CW 9433 serial 54766 in ROBE Pilbara Iron livery runs along on the West Mainline bound for Cape Lambert viewed from Table Hill.
232-02.jpg
232-02337 viewsYandi Two entry portal for the loadout tunnel entry sign. February 1997. GeoData.
232-12.jpg
232-12337 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.
239-30.jpg
239-30337 viewsYandi Two, conveyor belt CV202 failure to the belt on the primary crushing circuit. Shows belt rolls bunched up near the gravity take-up tower. GeoData.
060110_2180.jpg
060110 2180337 viewsNear the 73 km and Cockaleechie Road grade crossing, empty grain train with ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 and two 830 class AE Goodwin built ALCo model DL531 units 842 serial 84140 ex SAR broad gauge to Eyre Peninsula in October 1987, and 851 serial 84137 new to Eyre Peninsula in 1962. Approx. location of image.
160523_3579.jpg
160523 3579337 viewsBinduli, nickel concentrate train 2438, WN type pneumatic discharge nickel concentrate waggon WN 529, one of thirty built by AE Goodwin NSW as WN type in 1970 for WMC.
160525_4432.jpg
160525 4432337 viewsParkeston, 3PM7 priority service train running downgrade through the gauge check with a near full moon watching on as Goninan built GE model Cv40-9i NR class units NR 64 serial 7250-11/96-266 and NR 11 serial 7250-02/97-213 lead the train.
160528_8417.jpg
160528 8417337 viewsBinduli, intermodal train 6PM6, RRZY type five unit bar coupled well container waggon set RRZY 7016 platform 3, originally built by Goninan in a batch of twenty six RQZY type for National Rail, recoded when repaired. FCL 48' container FSGU 488445 double stacked with Sadleirs 48' container RCS 4816.
160528_8452.jpg
160528 8452337 viewsBinduli, intermodal train 6PM6, platform 1 of 5-pack RRRY 7012 well waggon set, one of nineteen built in China at Zhuzhou Rolling Stock Works for Goninan in 2005, double stacked with a Intermodal Solutions 48' box RCS 4839 and RAND Refrigerated Logistics 46' 6" reefer RAND 400 on top.
160528_8459.jpg
160528 8459337 viewsBinduli, intermodal train 6PM6, RRAY 7194 platform 3 of 5-pack articulated skeletal waggon set, one of a hundred built by ABB Engineering NSW between 1996-2000, loaded with a Royal Wolf 40' curtainsider RWTU 903115[8].
160523_2981.jpg
160523 2981337 viewsParkeston, 7SP3 intermodal train, PQYY 7083, the PQYY type is a 5-pack articulated well waggon set built in September 1995 by AN Islington Workshops as one of a pair of RQYY for Boxcar/Cubico and recoded in the late '90s to PQYY.
160523_3018.jpg
160523 3018337 viewsParkeston, 7SP3 intermodal train, RRAY 7167 platform 4 of 5-pack articulated skeletal waggon set, one of 100 built by ABB Engineering NSW 1996-2000, with an ARLS 46' 6" RFRG type reefer ARLS 501 'from the Carrier' end.
160524_4036.jpg
160524 4036337 viewsBinduli, Melbourne bound steel train service 3PM4, NQTY 20314 with two butter box containers RH527 and RH378, originally built by EPT NSW in 1979-81 as an BDY type open waggon before being heavily modified by ANI Engineering in 1998, was also coded NOJY and NKJY prior to 1998.
160524_4236.jpg
160524 4236337 viewsWest Kalgoorlie, 1MP2 steel train motive power of Goninan built GE model Cv40-9i NR class units NR 66 serial 7250-12/96-268 and NR 32 serial 7250-06/97-234 shunt off waggons for Kalgoorlie.
160523_3041.jpg
160523 3041337 viewsParkeston, 7SP3 intermodal train, RLUY 18623 louvre van, one of fifty originally built by Comeng NSW as KLY in 1973, then recoded to NLKY, NLWY wearing Sadleirs green livery and signage.
160531_9953.jpg
160531 9953337 viewsWest Kalgoorlie, 3PM4 steel train, empty container waggon RQHY 7039, one of seventy eight built in 2005 by Qiqihar Rollingstock Works in China.
160609_0480.jpg
160609 0480337 viewsWoodbridge, 5PM5 intermodal train, platform 1 of 5-pack RRRY 7012 well waggon set, one of nineteen built in China at Zhuzhou Rolling Stock Works for Goninan in 2005, double stacked with two 40' boxes, a Railroad Transport container RTPH 4031 and a 4FG1 type MEHU 350033[1] without any logo.
19085 files on 955 page(s) 452

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional