Most viewed |

190109 1611119 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00312 built by CSR Yangtze Co China serial 2014/382-312 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1617119 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00027 built by CSR Yangtze Co China serial 2014/382-27 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1619119 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00210 built by CSR Yangtze Co China serial 2014/382-210 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1631119 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00136 built by CSR Yangtze Co China serial 2014/382-136 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1673119 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00180 built by CSR Yangtze Co China serial 2014/382-180 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

243-13119 viewsNelson Point departure yard, BHP Billiton's CM40-8M unit 5634 'Boodarie' a Goninan WA GE rebuild unit serial 8151-07 / 91-120 in the new 'earth' or 'bubble' livery as it heads up an empty train waiting departure time. August 2003.
|
|

080116 1369119 viewsChapman Siding, view from the hand brake end with F type Interlock coupling and hand brake wheel arrangement, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 16th January 2008.
|
|

200412 5921119 viewsBoodarie, part of a loaded FMG train, a mismatched waggon pair, both are CSR Yangtze Rolling Stock Co. of China builds, 6968 would be a 2013 built, but the 5967 should be a 2014 build and numbered in the 72xx-74xx series. 12th April 2020.
|
|

246-13119 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons. 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. 22nd May 2002.
|
|

210322 9566119 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is Chinese built ballast waggon BAH 124 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
|
|

210510 1119119 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTS type chute and straddle crane carrying rail waggon RTS 001 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

140601 4447119 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHEY type waggon CHEY 8039-1 part of a pair of 120 sets built by Bluebird Rail Operations SA in 2011-12. 1st June 2014.
|
|

130710 1056119 viewsParkeston, SCT train 3PG1, PBGY type covered van PBGY 0107 Multi-Freighter, one of eighty waggons from the second order built by Gemco WA for SCT.
|
|

110620 2020r119 viewsWalla Siding, empty BHP ore waggon 7000, a Goninan WA build of the Golynx design from April 2008. 20th of June 2011.
|
|

180-34118 viewsWodonga turntable radial roads finds V/Line broad gauge H class loco H 3 Clyde Engineering EMD model G18B serial 68-631 resting between jobs, cab front view.
|
|

138-21118 viewsDunolly yard overview looking north towards the station from south of the silo complex. V/Line Grain waggons waiting for loading.
|
|

148-25118 viewsWangaratta, Signal Bridge, Down Signal Posts 7, 8 and stripped 10 facing camera, Up Post 9 facing away. Signal Post 7 two arms and two discs, Top arm Home Signal 'A' to No.2 Road to Post 17, Bottom arm Calling-on Signal from 'A' to No. 2 Road towards Post 17. Left-hand Disc from 'A' to No. 4 or 5 Roads towards Post 19; or to No. 6 Road. Right-hand Disc from 'A' to No. 3 Road towards Post 17. Signal Post 8 two arms one disc, Top arm Home Signal from 'A' to No. 1 Road to Post 20, Bottom arm Calling-on Signal from 'A' to No. 2 Road towards Post 20. The Disc from 'A' to Carriage Dock. Stripped Disc Post 10 was from 'B' to No. 1 Road towards Post 20 and from 'B' to Carriage Dock.
|
|

151-21118 viewsTraralgon station platform, V/Line broad gauge light engine 2nd unit X class X 43 Clyde Engineering EMD model G26C serial 70-706 awaits departure time for Morwell with 9444 light engine, then loaded briquette train for Nth Geelong, in heavy fog.
|
|

156-23118 viewsNumurkah, station building, internal view of lever frame, signal levers and diagram on wall, taken through window.
|
|

185-32118 viewsNorth Geelong C Box, Separation Street grade crossing, a pair of V/Line G class units G 533 Clyde Engineering EMD model JT26C-2SS serial 88-1263 and a sister shunt back into North Geelong Yard light engine to form grain train 9125.
|
|
16908 files on 846 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
458 |  |
 |
 |
 |
 |
 |
 |
|