Most viewed |

040814 092238119 viewsNelson Point, CFCLA ballast waggon CHQY type 740 just being delivered to BHP Iron Ore as part of the Rail PACE project.
|
|

050412 0735119 viewsQuarry 8, Shaw Siding area. A dash 8 locomotive on the point of an empty ballast waggon rake awaiting loading, waggons are modified Magor USA built ore waggons from the Oroville Dam construction.
|
|

050518 2110119 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 750.
|
|

050518 2122119 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 746, rear view with shipping decal.
|
|

051001 5637119 viewsFlash Butt yard, CFCLA ballast waggon CHQY class CHQY 730 behind a Dash 8 locomotive 5649.
|
|

060414 3439119 viewsNelson Point yard, originally a Magor USA built ballast waggon for the Oroville Dam construction, 507 seen here modified as a weighbridge test waggon with an axle load of 20 ton.
|
|

060429 3725119 viewsFlash Butt yard, Pony waggon #1, modified from a Magor USA built Oroville ore waggon, with a Comeng built gantry carrier.
|
|

050412 0781119 viewsHesta Siding south, builders plate of BHP's EX 01 high rail excavator, built in France by Geismar as a KGT 4RS model with serial 4559. 12th April 2005.
|
|

060326 3202119 viewsBing Siding, south arrival with the mainline in the foreground as ballast regulator BR 31 a Plasser Australia SSP 110SW model serial 401 takes the passing track. 26th March 2006.
|
|

060429 3767119 viewsFlash Butt yard, a Knox Kershaw KBR 850 ballast regulator lettered for Railway Equipment Leasing And Maintenance RELAM Inc with a Barclay Mowlem id number BM57. 29th April 2006.
|
|

060710 6231119 viewsAt the Broome Rd grade crossing Port Hedland, track machine BR 33 a Plasser Australia ballast regulator model SSP 302 serial M486. 10th July 2006.
|
|

110411 09989119 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0005 one of six such tank waggons built in 1970-71.
|
|

110411 10022119 viewsNelson Point, fuel tank waggon 0020 82 kL capacity, built by Comeng for BP as RTC 2, last of two such tanks, used on Mt Newman line, unsure when converted to 0020.
|
|

030404 082825119 viewsPort Germein, Perth bound steel and intermodal hurries through on the main behind National Rail's Goninan built GE Cv40-9i model NR class units NR 30 serial 7250-06 / 97-236 and a sister unit. 4th April 2003.
|
|

030415 150535119 viewsFerguson, located at the 469 km on the Trans Australian Railway, station nameboard. GeoData location.
|
|

030415 155056119 viewsTarcoola, at the 504.5 km, looking east, end of the Camp Train and No. 1 Loco roads at the points, while No. 2 Loco and No. 1 Water Road curve in from the right, mainline to the left. GeoData location. 15th April 2003.
|
|

190107 0558119 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00141 built by CSR Yangtze Co China serial 2014/382-141 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0564119 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00296 built by CSR Yangtze Co China serial 2014/382-296 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0598119 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00010 built by CSR Yangtze Co China serial 2014/382-10 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1583119 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00275 built by CSR Yangtze Co China serial 2014/382-275 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
16908 files on 846 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
461 |  |
 |
 |
 |
 |
 |
 |
|