Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
060811_8012.jpg
060811 801268 viewsGarden Siding, Speno rail grinder RG 2 coupled with RG 1 in the passing track. 11th August 2006.
080621_2724.jpg
080621 272468 viewsTabba South, view from rear of new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, the chutes can be seen standing up with the squeeze rollers behind the mesh.
080621_2725.jpg
080621 272568 viewsGillman Siding, new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, the chutes can be seen standing up with the squeeze rollers behind the mesh.
080621_2726.jpg
080621 272668 viewsGillman Siding, new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, the chutes can be seen standing up with the squeeze rollers behind the mesh with the original rear Lead-Off waggon 6203 and straddle crane.
081217_0452.jpg
081217 045268 viewsWoodstock Siding, rail recovery and transport train, waggon #29, 1st lead off waggon 6011, built by Scotts of Ipswich Qld on 04-09-1970, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible.
100717_0656.jpg
100717 065668 viewsFlash Butt yard, new rail stock carrier waggon 6020, built by Gemco Rail in late 2009-10 with Barber bogies.
110208_9446.jpg
110208 944668 viewsFlash Butt yard, new rail stock carrier waggons 6038 and 6031 loaded with strings of rail, built by Gemco Rail in late 2009-10.
030415_154909.jpg
030415 15490968 viewsTarcoola, at the 504.5 km, looking south east, roads are, Camp Train, No. 1 Loco, No. 2 Loco and No. 1 Water Road, mainline to the left. Water tank on stand. GeoData location. 15th April 2003.
171018_0954.jpg
171018 095468 viewsTad Yard, overview of Roy Hill's fuel tanks and waggon loading gantry with a fuel train being loaded headed up by ES44ACi unit RHA 1020 serial number 64301 built in Erie Pennsylvania, USA by GE. 17th October 2018.
242-29.jpg
242-2968 viewsPort Hedland, Don Rhodes Mining Museum, preserved Goldsworthy Mining B class unit #2 serial number A-105, these units of Bo-Bo design with a 6CSRKT 640 kW prime mover were built at the English Electric Rocklea Qld plant in 1965 and primarily used for the construction of the Mt Goldsworthy to Finucane Island railway. May 2002.
190107_0600.jpg
190107 060068 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00291 built by CSR Yangtze Co China serial 2014/382-291 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0621.jpg
190107 062168 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00188 built by CSR Yangtze Co China serial 2014/382-188 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0627.jpg
190107 062768 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00051 built by CSR Yangtze Co China serial 2014/382-51 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1579.jpg
190109 157968 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00214 built by CSR Yangtze Co China serial 2014/382-214 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1626.jpg
190109 162668 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00236 built by CSR Yangtze Co China serial 2014/382-236 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1641.jpg
190109 164168 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00335 built by CSR Yangtze Co China serial 2014/382-335 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
080116_1381.jpg
080116 138168 viewsChapman Siding looking north inside ore waggon 2396. The visible angle iron welded to the floor are covers for the water drain holes.
249-29.jpg
249-2968 viewsA loaded Hamersley Iron train runs across the plains north of Dugite Siding near the 70 km as it nears the destination of its cargo behind the standard pair of GE built Dash 9-44CW locomotives 7084 serial 47763 and 7079 serial 47758 both in the original Pepsi Can livery. Approximate location. 18th December 1999.
249-32.jpg
249-3268 viewsA loaded Hamersley Iron train runs across the plains north of Dugite Siding near the 70 km as it nears the destination of its cargo behind the standard pair of GE built Dash 9-44CW locomotives 7084 serial 47763 and 7079 serial 47758 both in the original Pepsi Can livery. Approximate location. 18th December 1999.
249-33.jpg
249-3368 viewsLoaded Hamersley Iron ore waggon pair National Steel USA built 5126 and Nippon Sharyo Japan built 770. Approximate location. 18th December 1999.
16167 files on 809 page(s) 496

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional