Most viewed |

161111 2426240 viewsKalgoorlie, Malcolm freighter train 5029, waggon AQNY 32177 one of sixty two waggons built by Goninan WA in 1998 as WQN type for Murrin Murrin container traffic with a Bis Industries roll-top 55UA type sulphur container SBIU 200622 and an undecorated Bis Industries hard-top 25U0 type sulphur container BISU 100072.
|
|

161112 2999240 viewsWest Kalgoorlie, loaded Malcolm sulphur train 6029, CQZY type waggon CQZY 1690, built by CIMC at Dalian China for CFCLA and one of fifteen on lease to Aurizon with original style sulphur container S7N G836 with sliding tarpaulin and Bis Industries hard-top type 25U0 container BISU 100105.
|
|

161112 3036240 viewsWest Kalgoorlie, loaded Malcolm sulphur train 6029, AQNY type waggon AQNY 32154 one of sixty two waggons built by Goninan WA in 1998 as WQN type for Murrin Murrin container traffic with a pair of original style sulphur containers with sliding tarpaulins, S38A G830 and S154K G937.
|
|

161116 5108240 viewsWest Kalgoorlie, Shell fuel train 3442, NTAY type tank waggon NTAY 6129, built by Industrial Engineering Qld in 1976 as an SCA type SCA 280 for Shell. Recoded to NTAF 280, then 6129, capacity of 61,300 litres, former owner lettering for Freight Australia visible, note normal E type coupler, ATPF has type F InterLock.
|
|

050801 4763240 viewsFlash Butt yard, rail recovery and transport train, flat waggon 6702, heavily cut down and modified Magor USA ore waggon by Mt Newman Mining workshops, converted to a 50 tonne waggon and designated the winch waggon with generator set to power the winch and the crib car.
|
|

050410 0518240 viewsNelson Point yard hard stand area front view of brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|

050412 0822240 viewsAbydos Siding backtrack, builders plate of BHP's ballast regulator BR 31 a Plasser Australia SSP 110SW model serial 401 built in 1993. 12th April 2005.
|
|

050625 3663240 viewsMooka North, BHP's new Tamper 3 track machine a Plasser Australia 09-3X model serial M480. 25th June 2005.
|
|

050917 5516240 viewsCoon Siding, view of the tamper driving and operators cabin locations on Switch Tamper SW 02 is a Plasser Australia model Unimat S4 switch tamper. 17th September 2005.
|
|

060811 7966240 viewsNorth of Gillam is track machine BR 33 a Plasser Australia ballast regulator model SSP 302 serial M486. 11th August 2006.
|
|

150619 9083240 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0710 loaded with fines for sheeting, B end and bogie detail.
|
|

241-34240 viewsNelson Point, Car Dumper 2 holding roads, a pair of CM40-8M units 5660 'Kure' serial 8412-05 / 94-151 and 5657 'Fukuyama' drag their loaded train towards the dumper to discharge passing a similar consist. June 2002.
|
|

190107 0448240 viewsParkeston, Mineral Resources Ltd MHPY type iron ore waggon MHPY 00013 built by CSR Yangtze Co China in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0561240 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00290 built by CSR Yangtze Co China serial 2014/382-290 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0590240 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00376 built by CSR Yangtze Co China serial 2014/382-376 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0597240 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00352 built by CSR Yangtze Co China serial 2014/382-352 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0611240 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00117 built by CSR Yangtze Co China serial 2014/382-117 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1556240 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL 005 'Carina Flyer' with serial number R-0113-05/14-508 and is a UGL Rail Broadmeadow NSW built GE C44ACi model locomotive, one of six such units built for Mineral Resources in 2014.
|
|

190109 1671240 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00056 built by CSR Yangtze Co China serial 2014/382-56 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

080124 1627240 viewsChapman Siding, new FMG ore waggon pair 1311 slave and 2312 control, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 24th January 2008.
|
|
16952 files on 848 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
498 |  |
 |
 |
 |
 |
 |
 |
|