Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
060501_3906.jpg
060501 3906111 viewsAbydos Siding backtrack, Speno rail grinders RG 2 coupled to RG 1. 1st May 2006.
060501_3916.jpg
060501 3916111 viewsAbydos Siding backtrack, Speno rail grinder RG 1, a RR24 model grinder with 24 grinding wheels, serial M20. 1st May 2006.
060501_3923.jpg
060501 3923111 viewsAbydos Siding backtrack, Speno rail grinder RG 1, a RR24 model grinder with 24 grinding wheels, serial M20, third grinding module. 1st May 2006.
080621_2715.jpg
080621 2715111 viewsTabba South, one of a batch of six flat waggons converted by Mt Newman Mining workshops by cutting down a pair of ore waggons to make one flat waggon, 6101 in service with the rail recovery and transport train as waggon #7.
080621_2732.jpg
080621 2732111 viewsGillman Siding, new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, detail of B end with squeeze rollers and chutes raised.
080621_2733.jpg
080621 2733111 viewsGillman Siding, view from rear of rail recovery and transport train with new Lead-Off Lead-On waggon STTR class STTR 6214 on the end built by Gemco Rail WA.
081217_0455.jpg
081217 0455111 viewsWoodstock Siding, rail recovery and transport train flat waggon #1, rear lead off waggon 6203, built by Comeng WA in January 1977 under order number 07-M-282 RY. The straddle crane is a newish unit built by Vaia Car model no. TCR-V and the four wheels are chain driven, replacing the original Gemco hydraulic unit.
150619_9076.jpg
150619 9076111 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0706 loaded with fines for sheeting.
150619_9082.jpg
150619 9082111 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0710 loaded with fines for sheeting, mid-section detail.
170729_0172.jpg
170729 0172111 viewsFortescue River Bridge on the Robe River line at the 115.8 km, a loaded Deepdale train heading for Cape Lambert behind the standard motive power for this line, double General Electric built ES44ACi units, 9114 serial 62545 and sister unit 9101 serial 61939 run over the largest rail bridge in the Pilbara. 29th July 2017. GeoData.
170510_8284.jpg
170510 8284111 viewsRio Tinto compressor waggon set CB 09, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 10th May 2017.
190107_0530.jpg
190107 0530111 viewsBinduli, following a crew change Mineral Resources empty iron ore train 2034 with Mineral Resources MRL class loco MRL 003 'Southern Cross' with serial R-0113-03/14-506 a UGL Rail Broadmeadow NSW built GE model C44ACi model leads two Pacific National NR class units NR 43 and NR 78 with 53 pairs of MHPYs and 2 single MHLY bottom discharge hopper waggons for 1293 metres and 2258 tonnes.
190107_0623.jpg
190107 0623111 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00147 built by CSR Yangtze Co China serial 2014/382-147 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0642.jpg
190107 0642111 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00032 built by CSR Yangtze Co China serial 2014/382-32 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1627.jpg
190109 1627111 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00165 built by CSR Yangtze Co China serial 2014/382-165 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
243-06.jpg
243-06111 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan trails CM40-8M unit 5634 both in the new 'earth' or 'bubble' livery as they head up an empty train waiting departure time. August 2003.
243-15.jpg
243-15111 viewsNelson Point departure yard, BHP Billiton's CM40-8M unit 5634 'Boodarie' a Goninan WA GE rebuild unit serial 8151-07 / 91-120 in the new 'earth' or 'bubble' livery as it heads up an empty train waiting departure time. August 2003.
080304_2181.jpg
080304 2181111 viewsThomas Yard, down the rail welding end, side view of control waggon 2342, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
247-03.jpg
247-03111 viewsCape Lambert, Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here in the South Yard waiting to drag a loaded rake down to the car dumper. Approximate location of train is here. 22nd May 2002.
249-37.jpg
249-37111 viewsBurrup Peninsula gas plant, view of storage tanks, plant and visitors centre. Approximate location. 18th December 1999.
16908 files on 846 page(s) 501

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional