Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
080621_2715.jpg
080621 2715110 viewsTabba South, one of a batch of six flat waggons converted by Mt Newman Mining workshops by cutting down a pair of ore waggons to make one flat waggon, 6101 in service with the rail recovery and transport train as waggon #7.
130720_1555.jpg
130720 1555110 viewsFlash Butt yard, new heavyweight out of gauge flat waggon 6000, unsure of builder, could be Gemco Rail in Perth.
150619_9076.jpg
150619 9076110 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0706 loaded with fines for sheeting.
150619_9082.jpg
150619 9082110 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0710 loaded with fines for sheeting, mid-section detail.
160128_00339.jpg
160128 00339110 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0031, class leader of a second batch delivered in 2015 with safety slogan 'Safety - It's your life'.
160128_00340.jpg
160128 00340110 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0024, one of a batch of ten built in 2014.
170729_0172.jpg
170729 0172110 viewsFortescue River Bridge on the Robe River line at the 115.8 km, a loaded Deepdale train heading for Cape Lambert behind the standard motive power for this line, double General Electric built ES44ACi units, 9114 serial 62545 and sister unit 9101 serial 61939 run over the largest rail bridge in the Pilbara. 29th July 2017. GeoData.
170510_8294.jpg
170510 8294110 viewsRio Tinto compressor waggon set CB 09, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors and the receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 10th May 2017.
190107_0479.jpg
190107 0479110 viewsParkeston, Mineral Resources MRL class loco MRL 002 'Spirit of Yilgarn' with serial R-0113-03/14-505 a UGL Rail Broadmeadow NSW built GE model C44ACi in 2014 is pushed back along the loop to as the power consist of Pacific National NR 60 and NR 8 runs around the waggon rake.
190107_0576.jpg
190107 0576110 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00218 built by CSR Yangtze Co China serial 2014/382-218 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0578.jpg
190107 0578110 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00258 built by CSR Yangtze Co China serial 2014/382-258 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0588.jpg
190107 0588110 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00228 built by CSR Yangtze Co China serial 2014/382-228 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0627.jpg
190107 0627110 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00051 built by CSR Yangtze Co China serial 2014/382-51 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0632.jpg
190107 0632110 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00178 built by CSR Yangtze Co China serial 2014/382-178 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0635.jpg
190107 0635110 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00002 built by CSR Yangtze Co China serial 2014/382-2 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1639.jpg
190109 1639110 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00231 built by CSR Yangtze Co China serial 2014/382-231 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1668.jpg
190109 1668110 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00194 built by CSR Yangtze Co China serial 2014/382-194 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
243-16.jpg
243-16110 viewsNelson Point departure yard, BHP Billiton's CM40-8M unit 5634 'Boodarie' a Goninan WA GE rebuild unit serial 8151-07 / 91-120 in the new 'earth' or 'bubble' livery as it heads up an empty train waiting departure time. August 2003.
080120_1469.jpg
080120 1469110 viewsThomas Yard, new FMG ore waggon pair 1263 slave and 2264 control waggons, 22.6 tonnes tare with rotary coupler, and the master at 22.9 tonnes. View from the handbrake end coupled to a GE Dash 9-44CW unit 011. 20th January 2008.
080304_2200.jpg
080304 2200110 viewsThomas Yard, down the rail welding end, new FMG ore waggon pair 1547 slave and 2548 control, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
16895 files on 845 page(s) 502

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional