Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
100609_09943.jpg
100609 09943316 viewsMidland, AQHY 30064 with sulphuric acid tank CSA 0030, originally built by the WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana.
100609_10001.jpg
100609 10001316 viewsMidland, ATKY 516 fuel tank waggon built by Tulloch Ltd NSW in 1971 along with sister 515 for BP Oil as WJK type 93,000 litres three compartment and three domes, recoded to WJKY.
100611_0373.jpg
100611 0373316 viewsMidland, ATPY 585 fuel tank waggon built by WAGR Midland Workshops in 1976 with 586 for Mobil and coded WJP type, recoded to WJPY, sold to BP Oil in 1985, 80,000 litres one compartment one dome.
224-08.jpg
224-08316 viewsBing siding, 6073 'Fortescue' serial 51065 a General Electric AC6000 built by GE at Erie awaits the road to depart south, cab side shows new nameplate, steerable bogie and taper in cab side. GeoData.
224-19.jpg
224-19316 viewsBing siding, 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie awaits the road to depart south, cab side shows new nameplate, steerable bogie and taper in cab side. GeoData.
224-20.jpg
224-20316 viewsBing siding, the afternoon empty to Yandi was a staple of the AC6000 units when delivered, operating the train as a pair, 112 waggons, AC6000 and 112 waggons. 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie awaits the road to depart south with sister unit 6073. GeoData.
225-07.jpg
225-07316 viewsBing siding, the afternoon departure for Yandi mine heads south past the ballast consist, behind the standard double General Electric AC6000 units with GE Erie built 6075 serial 51067 second unit to lead sister unit 6074 with another AC6000 unit mid-train. This was before the units were named. GeoData.
226-13.jpg
226-13316 viewsShaw North, 216.5 km, arrival signal SWN 3 Shaw North 3 at the top of the steep 1.5 percent climb that south bound empties face. Dragging equipment detection bars visible, they are painted yellow and the interlocking room. GeoData.
226-16.jpg
226-16316 viewsShaw North, 216.5 km, departure signals SWN 4 for the mainline and SWN 6 for the loop for loaded trains that are about to descend the steep 1.5 percent decent to Garden Siding. Dragging equipment detection bars visible, they are painted yellow and the interlocking room with solar array mounted above the cutting. GeoData.
229-08.jpg
229-08316 viewsYandi Two balloon switch, empty BHP train heading for the loadout with mid-train remote unit Goninan rebuild CM40-8M GE units 5660 'Kure' serial 8412-05 / 94-151, cab side. GeoData.
238-19.jpg
238-19316 viewsNelson Point loco overhaul shop sees former Southern Pacific loco 3079 EMD model SD40, serial number 7861-52 with the long hood removed due to the 645 prime mover failing not long after arrival in Australia. 27th January 2004. Geodata .
239-13.jpg
239-13316 viewsOverview of the Yandi One sizing plant looking north from above the middling crushers along CV4 (middle belt) to the screen house which houses six Jaques 'banana screens'. The feed bin and associated feed conveyors, travelling left and right can be clearly seen. The 'new side' is on the left and the 'old side' on the right. The feed along CV10 to the stockpile is obscured by the 'old side' structure and Sub-Station 3 can just be made out. GeoData.
060110_2183.jpg
060110 2183316 viewsNear the 78 km, empty grain train with ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 and two 830 class AE Goodwin built ALCo model DL531 units 842 serial 84140 ex SAR broad gauge to Eyre Peninsula in October 1987, and 851 serial 84137 new to Eyre Peninsula in 1962. Approx. location of image.
160522_2307.jpg
160522 2307316 viewsParkeston, APNY 31155 one of twelve built by WAGR Midland Workshops in 1974 as WNA type pneumatic discharge nickel concentrate waggon, WAGR built and owned copies of the AE Goodwin built WN waggons for WMC.
160523_3330.jpg
160523 3330316 viewsWest Kalgoorlie, AQHY 30117 with CSA 0096, originally built by the WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth. CSA 0096 was built by Vcare Engineering, India for Access Petrotec & Mining Solutions in 2015.
160523_3600.jpg
160523 3600316 viewsWest Kalgoorlie, AQHY 30049 with sulphuric acid tank CSA 0104, originally built by WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH type to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana, part of loaded acid train 2406 arriving back in the yard. CSA 0104 was built by Vcare Engineering, India for Access Petrotec & Mining Solutions in 2015.
160525_4484.jpg
160525 4484316 viewsParkeston, 3PM7 priority service train, RRAY 7249 platform 3 of 5-pack articulated skel waggon set, one of 100 built by ABB Engineering NSW 1996-2000, 48' deck with a 48' Rail Containers sea2rail box SCFU 411218.
160525_4489.jpg
160525 4489316 viewsParkeston, 3PM7 priority service train, RRAY 7203 platform 3 of 5-pack articulated skel waggon set, one of 100 built by ABB Engineering NSW 1996-2000, 48' deck with a Pacific National 48' curtainsider PNXC 5655.
160525_4490.jpg
160525 4490316 viewsParkeston, 3PM7 priority service train, RRAY 7203 platform 2 of 5-pack articulated skel waggon set, one of 100 built by ABB Engineering NSW 1996-2000, 48' deck with a Rail Containers sea2rail 48' box SCFU 412538.
160525_4496.jpg
160525 4496316 viewsParkeston, 3PM7 priority service train, RRAY 7166 platform 5 of 5-pack articulated skel waggon set, one of 100 built by ABB Engineering NSW 1996-2000, 40' deck, SCF sea2rail 40' box SCFU 408196.
19085 files on 955 page(s) 538

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional