Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
161111_2475.jpg
161111 2475102 viewsBinduli, Kalgoorlie Freighter train 5025, diesel fuel tank waggon ATEY 4725, BP Oil service, ex Ampol, other codes include ex NSW NTAF, WTEF and WTEY.
161112_3037.jpg
161112 3037102 viewsWest Kalgoorlie, loaded Malcolm sulphur train 6029, CQZY type waggon CQZY 1655, built by CIMC at Dalian China for CFCLA and one of fifteen on lease to Aurizon with a pair of un-decaled hard-top 25U0 type containers BISU 100025 and BISU 100068.
161112_3461.jpg
161112 3461102 viewsBinduli, loaded Hampton acid train 7406 with AQHY 30034 with sulphuric acid tank CSA 0136, originally built by the WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH type to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana. CSA 0136 was built by Vcare Engineering, India for Access Petrotec & Mining Solutions.
161116_5564.jpg
161116 5564102 viewsBinduli, empty Shell fuel train 4443, tank waggon ATPF 575, built by WAGR Midland Workshops 1974 for Shell as type WJP 80.66 kL one compartment one dome.
040805_095709.jpg
040805 095709102 viewsNelson Point, CFCLA CHQY type ballast waggon CHQY 741.
040806_091122.jpg
040806 091122102 viewsGoldsworthy Junction, trailing view of the weighbridge test train with the four orange weighbridge test waggons and one of the two Comeng built ore waggons to provide braking, 5666 is the power.
040806_091154.jpg
040806 091154102 viewsGoldsworthy Junction, trailing view of the weighbridge test train with the four orange weighbridge test waggons and two Comeng built ore waggons to provide braking, 5666 is the power.
040806_092434.jpg
040806 092434102 viewsGoldsworthy Junction, weighbridge test waggon 507, originally built by Magor USA and ex Oroville Dam, converted by Mt Newman Mining into a 20 ton axle load test waggon coupled to 510.
050319_0149.jpg
050319 0149102 viewsNelson Point, dumper pilot SD40 3080 with compressor waggon set #1, made up of spacer/ballast waggon 681 and compressor waggon 671, both converted from original Magor built 91 ton ore waggons, painted white.
050410_0545.jpg
050410 0545102 viewsNelson Point, tanker filling area, fuel tank waggons 0018 a Comeng WA built 114 kilolitre tank waggon, one of a batch of three built in 1974-75 and 0015 a Comeng NSW built 112 kilolitre tank waggon, one of a batch of four built in 1972 and both wearing the newer corporate 'Earth' livery of BHP Billiton Iron Ore.
050412_0752.jpg
050412 0752102 viewsQuarry 8, Shaw Siding area. Side view of 1963 built Magor USA waggon 534, originally in ore service before conversion to a ballast waggon.
050518_2126.jpg
050518 2126102 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 756, shows ownership plaque.
050518_2157.jpg
050518 2157102 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 501, the first of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
050518_2158.jpg
050518 2158102 viewsBing Siding. Side view of 1963 built Magor USA waggon 501, the first of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
050518_2161.jpg
050518 2161102 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 502, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
051001_5628.jpg
051001 5628102 viewsFlash Butt yard, BHP flat waggon 6705 with EDI decal and ROA code of AQPY 2916, 55 tonne capacity, unsure of original owner, possible AN AOOX, then cut down to the Pilbara through CFCLA.
051001_5643.jpg
051001 5643102 viewsFlash Butt yard, side view of ballast plough converted from Magor USA built Oroville ore waggon 538, still visible is the ODCX 82160 number from original service building the Oroville Dam, through brake pipe is visible over the top of waggon.
051001_5650.jpg
051001 5650102 viewsFlash Butt yard, side view of ballast plough converted from Magor USA built Oroville ore waggon 538, shows bogies and hand brake detail.
051001_5725.jpg
051001 5725102 viewsBoodarie, the Steel Train or rail recovery and transport train, 1st lead off waggon 6011, built by Scotts of Ipswich 04-09-1970, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible. Then 6702 winch waggon and 665 the crib waggon.
051001_5738.jpg
051001 5738102 viewsBoodarie, the Steel Train or rail recovery and transport train, 1st lead off waggon 6011, built by Scotts of Ipswich 04-09-1970, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible.
16874 files on 844 page(s) 549

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional