Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
050522_2727.jpg
050522 2727313 viewsGoldsworthy Junction, rail recovery and transport train flat waggon #17, 6016, built by Comeng WA in January 1971, also carries contract no. of 6506-016.
050410_0503.jpg
050410 0503313 viewsNelson Point yard hard stand area sees brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
050917_5516.jpg
050917 5516313 viewsCoon Siding, view of the tamper driving and operators cabin locations on Switch Tamper SW 02 is a Plasser Australia model Unimat S4 switch tamper. 17th September 2005.
060710_6232.jpg
060710 6232313 viewsAt the Broome Rd grade crossing Port Hedland, track machine BR 33 a Plasser Australia ballast regulator model SSP 302 serial M486. 10th July 2006.
110411_10034.jpg
110411 10034313 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0004 one of six such tank waggons built in 1970-71.
150314_7754.jpg
150314 7754313 viewsBing Siding, empty 116 kL CNR-QRRS of China built tank waggon 0022, one of a batch of ten built in 2014.
030403_162141.jpg
030403 162141313 viewsCrystal Brook, view from rear of CLF class leader CLF 1 'City of Whyalla' serial 93-AN-1, rebuilt by MKA to EMD model AT26C-2M from CL class unit CL 2 in 1993. 3rd April 2003.
030404_125126.jpg
030404 125126313 viewsPort Augusta Spencer Junction yard, a Perth bound intermodal awaits departure time on 13 Road behind National Rail NR class units built by Goninan as GE Cv40-9i models, NR 50 serial 7250-08 / 97-252. 4th April 2003.
060723_7685.jpg
060723 7685313 viewsOriginal Hamersley Iron compressor waggon set IC-6 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. Seen here on the causeway just outside 7 Mile. 23rd July 2006.
170728_09688.jpg
170728 09688313 viewsRio Tinto compressor waggon set CB 12, receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 28th July 2017.
190107_0525.jpg
190107 0525313 viewsBinduli, following a crew change Mineral Resources empty iron ore train 2034 with Mineral Resources MRL class loco MRL 003 'Southern Cross' with serial R-0113-03/14-506 a UGL Rail Broadmeadow NSW built GE model C44ACi model leads two Pacific National NR class units NR 43 and NR 78 with 53 pairs of MHPYs and 2 single MHLY bottom discharge hopper waggons for 1293 metres and 2258 tonnes.
190107_0552.jpg
190107 0552313 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00297 built by CSR Yangtze Co China serial 2014/382-297 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0600.jpg
190107 0600313 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00291 built by CSR Yangtze Co China serial 2014/382-291 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1671.jpg
190109 1671313 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00056 built by CSR Yangtze Co China serial 2014/382-56 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
080124_1624.jpg
080124 1624313 viewsChapman Siding, side view of control waggon 2256, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 24th January 2008.
110620_2277.jpg
110620 2277313 viewsChapman, FMG TK type fuel tank waggon TK 05 built by China Southern CSR at their Zhuzhou Rolling Stock Works plant in China in 2008 as part of an order for twelve tanks, is on the loaded fuel train to Cloud Break. 20th June 2011.
110620_2281.jpg
110620 2281313 viewsChapman, FMG TK type fuel tank waggon TK 01 built by China Southern CSR at their Zhuzhou Rolling Stock Works plant in China in 2008 as the first of an order for twelve tanks, is on the loaded fuel train to Cloud Break. 20th June 2011.
249-17.jpg
249-17313 viewsTable Hill on the Robe River railway line, looking in a northerly direction as the railway line snakes north and heads through Lockyer Gap towards Cape Lambert. Following a very wet 1999 cyclone season Lake Poongkaliyarra is very full. Approximate location.
210322_9574.jpg
210322 9574313 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is Chinese built ballast waggon BAH 121 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
253-01.jpg
253-01313 viewsDugite near the 64 km on the Dampier - Tom Price railway, a loaded Hamersley Iron train headed up by General Electric 9-44CW units 7078, from the original order, serial number 47757 and 7096, from the second order, serial number 52843 arrive taking the mainline to cross an empty which is in the passing track.
19085 files on 955 page(s) 553

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional