Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
060710_6232.jpg
060710 6232310 viewsAt the Broome Rd grade crossing Port Hedland, track machine BR 33 a Plasser Australia ballast regulator model SSP 302 serial M486. 10th July 2006.
040806_102936.jpg
040806 102936310 viewsFlash Butt yard, view of Rail Dynamics Laboratory test waggon 2703, modified by BHP from waggon number 2716 in 1975, originally a Comeng built waggon dating from 1971.
110411_10021.jpg
110411 10021310 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0016 from 1974-5, one of six such tank waggons.
110619_1881.jpg
110619 1881310 viewsSouth of Mooka Siding, the Steel Train or rail recovery and transport train, flat waggon #11, 6210, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
130720_1435.jpg
130720 1435310 viewsFlash Butt yard, CFCLA ballast waggon CHTY class CHTY 715, modified from a similar CHQY class with the end framing removed attached to an SD40R unit 3091.
130720_1563.jpg
130720 1563310 viewsFlash Butt yard, CFCLA ballast waggon CHTY class CHTY 717, modified from a similar CHQY class with the end framing removed.
150619_9082.jpg
150619 9082310 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0710 loaded with fines for sheeting, mid-section detail.
060715_6950.jpg
060715 6950310 viewsRio Tinto compressor waggon set CB 03, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers closet to camera. Note the waggons are cut down ore waggons. Seen here just outside of 7 Mile. 15th July 2006.
241-20.jpg
241-20310 viewsNelson Point, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation. Drivers side view of the radiator section. June 2002.
241-36.jpg
241-36310 viewsNelson Point, Car Dumper 2 holding roads with Yard Control tower and Ore Car Repair Shop in the background as two loaded ore rakes behind pairs of CM40-8M units on each wait their turn through the dumper to discharge as 5660 'Kure' serial 8412-05 / 94-151 and 5657 'Fukuyama' drag their loaded train towards the dumper to discharge . June 2002.
190107_0521.jpg
190107 0521310 viewsBinduli, following a crew change Mineral Resources empty iron ore train 2034 with Mineral Resources MRL class loco MRL 003 'Southern Cross' with serial R-0113-03/14-506 a UGL Rail Broadmeadow NSW built GE model C44ACi model leads two Pacific National NR class units NR 43 and NR 78 with 53 pairs of MHPYs and 2 single MHLY bottom discharge hopper waggons for 1293 metres and 2258 tonnes.
190107_0548.jpg
190107 0548310 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00097 built by CSR Yangtze Co China serial 2014/382-97 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0569.jpg
190107 0569310 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00087 built by CSR Yangtze Co China serial 2014/382-87 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0585.jpg
190107 0585310 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00240 built by CSR Yangtze Co China serial 2014/382-240 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0626.jpg
190107 0626310 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00052 built by CSR Yangtze Co China serial 2014/382-52 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1594.jpg
190109 1594310 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00176 built by CSR Yangtze Co China serial 2014/382-176 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1628.jpg
190109 1628310 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00166 built by CSR Yangtze Co China serial 2014/382-166 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1646.jpg
190109 1646310 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00076 built by CSR Yangtze Co China serial 2014/382-76 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1669.jpg
190109 1669310 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00238 built by CSR Yangtze Co China serial 2014/382-238 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
243-06.jpg
243-06310 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan trails CM40-8M unit 5634 both in the new 'earth' or 'bubble' livery as they head up an empty train waiting departure time. August 2003.
19085 files on 955 page(s) 561

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional