Most viewed |

150620 9328225 viewsQuarry 8 ballast loading area, CNR-QRRS of China built 99 tonne ballast waggon 0209 waits to be loaded.
|
|

170728 09688225 viewsRio Tinto compressor waggon set CB 12, receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 28th July 2017.
|
|

171121 0966225 viewsBarker Siding, Loram rail grinder MPC 2, control and grinder car. 21st November 2017.
|
|

241-04225 viewsNelson Point, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation. June 2002.
|
|

190107 0535225 viewsBinduli, Mineral Resources empty iron ore train 2034 with third unit Pacific National NR class loco NR 78 with serial 7250-02 / 97-280 a Goninan Bassendean WA built GE model Cv40-9i model locomotive with 4000 horsepower originally built for the National Rail Corporation.
|
|

190107 0547225 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00339 built by CSR Yangtze Co China serial 2014/382-339 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1599225 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00354 built by CSR Yangtze Co China serial 2014/382-354 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1658225 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00301 built by CSR Yangtze Co China serial 2014/382-301 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

243-09225 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan trails CM40-8M unit 5634 both in the new 'earth' or 'bubble' livery as they head up an empty train waiting departure time. August 2003.
|
|

243-15225 viewsNelson Point departure yard, BHP Billiton's CM40-8M unit 5634 'Boodarie' a Goninan WA GE rebuild unit serial 8151-07 / 91-120 in the new 'earth' or 'bubble' livery as it heads up an empty train waiting departure time. August 2003.
|
|

080124 1623225 viewsClose up view of the F type Interlock coupler and knuckle. 24th January 2008.
|
|

080304 2203225 viewsThomas Yard, down the rail welding end, side view of slave waggon 1515, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

246-33225 viewsCape Lambert, a Robe River loaded Deepdale train on the mainline with waggon 925 a Centurion Industries WA build. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. 22nd May 2002.
|
|

247-13225 viewsCape Lambert overview of the fuel point, with a brace of four CM40-8M rebuilds finishing up refuelling before departing with another empty train. The workshops are to the left of the picture. Where I'm standing to take the picture is now all stockpile. Approximate location of photo is here. 22nd May 2002.
|
|

248-17225 viewsSeven Mile yard, stored Robe River ALCo locomotives at the south end of the Hamersley Iron Seven Mile yard on roads N2 and N3. On road N2 is 9427 a Comeng WA C636R rebuild from ALCo Schenectady NY model C636 serial 3499-2 originally built in January 1968 for Pennsylvania Railroad as #6331, Penn Central 6331 and finally Conrail 6781. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in January 1987. This loco also went on to become DR 8403 for construction of FMG's railway in 2007-08. Approximate location. 24th April 2004.
|
|

249-07225 viewsYule River bridge looking north east upstream the third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

249-17225 viewsTable Hill on the Robe River railway line, looking in a northerly direction as the railway line snakes north and heads through Lockyer Gap towards Cape Lambert. Following a very wet 1999 cyclone season Lake Poongkaliyarra is very full. Approximate location.
|
|

252-04225 viewsCockatoo Siding 273 km on the Hamersley Iron line to Yandi, General Electric built 9-44CW unit 7088 with serial number 47767 from the original 1994 build idles away on the eastern end of the ballast train as it is loaded and slowly progresses into the back track siding Ballast plough BP 02 is behind the locomotive. Location is roughly here. 24th November 2001.
|
|

210322 9584225 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is CRRC Yangtze Rolling Stock Co of China built ballast plough waggon BP 04 on a loaded ballast rake, view of B end. Location is roughly here. 22nd March 2021.
|
|

255-07225 viewsSiding Three looking south along the Cape Lambert to Deepdale mainline at the south end signal for the mainline, passing track is on the right with points in the distance. May 2002.
|
|
16913 files on 846 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
564 |  |
 |
 |
 |
 |
 |
 |
|