Most viewed |

030414 154420606 viewsPenong station shelter shed. , last train in March 1997.
|
|

160525 4862606 viewsWest Kalgoorlie, Aurizon intermodal train 2MP1, crew accommodation coach QCBY 10, started life as Victorian Railways Newport Workshops 1952 build as AS class no. 15, first class air conditioned corridor car, then AS 210, BS 210 and BS 10. Sold to West Coast Railway, then RTS / Gemco and finally to Aurizon.
|
|

160524 3699606 viewsKalgoorlie, SCT train 2PM9 operating from Perth to Melbourne, ARBY type ARBY 3094 refrigerated van, originally built by Comeng WA in 1977 as a VFX type covered van for Commonwealth Railways, recoded to ABFX, RBFX and finally converted from ABFY by Gemco WA in 2004/05 to ARBY.
|
|

240328 3100606 viewsHampton Ballast Siding, Watco's 5WS4 loaded acid transfer train lead by Rai First lease GL locomotive GL 103, a Goninan / GE rebuild CM30-Mmi model of an old ALCo 442 class locomotive with new serial number 84040-06 / 03-335. March 28, 2024.
|
|

211-06605 viewsWeipa, Lorim Point, view of the shiploading stockpile area with the calcification bunker just visible on the right of frame.
|
|

217-16605 viewsDry Creek Motive Power Centre, Australian National trio of standard gauge light engines wearing the AN livery with BL class BL 26 'Bob Hawke' Clyde Engineering EMD model JT26C-2SS serial 83-1010, 700 class 705 AE Goodwin ALCo model DL500G serial G6059-3 and CL class Bulldog CL 17 'William McMahon' Clyde Engineering EMD model AT26C serial 71-757.
|
|

030409 080717605 viewsWarramboo, empty grain prepares to get underway following a crew change. Rebuild unit DA 7 in Australian Southern orange and black livery leads a pair of AE Goodwin built ALCo model DL531 830 class units 872 and 871, the relieved crew get in their car with the SACBH concrete silo complex behind.
|
|

030414 154120605 viewsPenong, yard view looking east along the grain loop with concrete silo block 2 on the left and the crossover from the main to the loop coming in from the right. Station shelter is in the distance on the right.
|
|

160524 3689605 viewsKalgoorlie, SCT train 2PM9 operating from Perth to Melbourne, PBGY type covered van PBGY 0086 Multi-Freighter, one of eighty units built by Gemco WA.
|
|

103-08604 viewsSpringhurst station yard view, staff exchange platform, elevation from access stairs, platform on the left and silo complex on the right, between No.2 and 3 Roads.
|
|

107-16604 viewsEchuca station yard overview, train examiners siding and brake pit, former B type fixed wheel louvre van B 10 grounded, looking south, converted from an 1924 era I type open waggon I 15052, converted to HD in November 1958 and in June 1989 placed here.
|
|

160-19604 viewsShepparton, V/Line broad gauge VTQY type bogie fuel tank waggon VTQY 91 on the stabled down fuel train, note the disc and spoke wheel sets on the RHS bogie, this tank waggon was built by Victorian Railways Newport Workshops in April 1928, coded to TWF in 1961 then to VTQY in November 1981.
|
|

192-11604 viewsJunee, NSWSRA standard gauge locomotive depot roundhouse, a pair of ALCo RSD-20 or DL-541 models built by AE Goodwin for NSWGR as the 45 class are in the stages of being sealed up for long term storage, 4511 serial 84153 is already done while 4528 serial 84170 wait its turn.
|
|

194-30604 viewsYandi campsite for Henry Walker operated iron ore mine owned and managed by BHP, view of camp are from man cage on Kato 50 tonne hydraulic crane.
|
|

203-35604 viewsYampire Gorge, remains of asbestos mining, former roadway over grown with sign from the National Parks Board of WA.
|
|

204-02604 viewsYampire Gorge, remains of asbestos mining, view across creek to sealed up drive entry No. 7.
|
|

030407 082440604 viewsWudinna, detail view of HCN type bogie wheat waggon HCN 31, modified at Islington Workshops in 1978-80 which started life as a Tulloch built NHB type iron ore hopper for the CR on the North Australia Railway in 1968-69, showing a spoke wheel and disc wheel sets in the bogie. 7th April 2003.
|
|

030407 082655604 viewsWudinna, view looking south as the empty rake of bogie grain waggons is shunted into the siding for loading, showing HAN and HCN types of bogie grain hoppers. Concrete SACBH grain complex. 7th April 2003.
|
|

030409 080705604 viewsWarramboo, empty grain prepares to get underway following a crew change. Rebuild unit DA 7 in Australian Southern orange and black livery leads a pair of AE Goodwin built ALCo model DL531 830 class units 872 and 871, the long disused station building at left and the SACBH concrete silo complex behind.
|
|

030409 081007604 viewsWarramboo, cab side shot of 830 class unit 872 AE Goodwin ALCo model DL531 serial G3422-02 was delivered new to the Eyre Peninsula in March 1966.
|
|
| 19088 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
57 |  |
 |
 |
 |
 |
 |
 |
|