Most viewed |

161111 2492389 viewsBinduli, Kalgoorlie Freighter train 5025, waggon AQRY 1000 platform A, with two 20' 22G1 type boxes, MOL MOAU 581721[8] and Cronos CXDU 158371[0]. The AQRY are a bar-coupled pair and were used for rail transport as the AFRF type on the Darwin line and are originally former ANR-CR waggons.
|
|

161111 2535389 viewsBinduli, Kalgoorlie Freighter train 5025, waggon AQHY 30020 with sulphuric acid tank CSA 0115, originally built by the WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH type to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana.
|
|

050518 2178389 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 520, the last of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

060501 3873389 viewsTabba Siding, originally built by Difco USA for Goldsworthy Mining Ltd in 1967 as a batch of five, prefixed with 870 in BHP service, 8703 side dump waggon loaded with ballast.
|
|

060713 6545389 viewsBoodarie Yard, modified original Magor USA built Oroville waggon 576, cut down and covered and in use as indexing waggons on the front of each rake for Finucane Island car dumpers, note the original ODCX marking visible.
|
|

110606 1749389 viewsFlash Butt, CNR-QRRS of China built 99 tonne ballast waggon 0209 waits to be loaded.
|
|

030403 165451389 viewsRed Hill, a Clyde Engineering built EMD JT46C model AN class unit AN 6 serial 93-1302 on an Adelaide and then Melbourne bound service depart following a crib break for the driver. 3rd April 2003.
|
|

030403 165644389 viewsRed Hill, double deck car carrying waggons transition from the loop back onto the mainline. 3rd April 2003.
|
|

170730 0435389 viewsBoodarie, a loaded FMG iron ore train rounds the large curve at the 5 km as it approaches the car dumper balloon loops behind Progress Rail Muncie USA built SD70ACe/LCi unit 719 serial 20118693-011 and sister 704 with the first four waggons showing panel repairs and re-lining recently undertaken. 30th July 2017. GeoData.
|
|

030416 095258389 viewsWirrida Siding, looking south towards Tarcoola with the goods siding and points rejoining the loop, notice the points are on timber sleepers while the loop and mainlines are on concrete, train control 'pillbox' in the distance. Located at the 641 km from the 0 datum at Coonamia and 137 km north of Tarcoola between Carnes and Manguri on the Tarcoola - Alice Springs line. GeoData location. 16th April 2003.
|
|

171121 0964389 viewsBarker Siding, Loram rail grinder MPC 2, control and grinder car. 21st November 2017.
|
|

171121 0969389 viewsBarker Siding, Loram rail grinder MPC 2, driving and generator end of a converted 85 foot waggon. 21st November 2017.
|
|

241-34389 viewsNelson Point, Car Dumper 2 holding roads, a pair of CM40-8M units 5660 'Kure' serial 8412-05 / 94-151 and 5657 'Fukuyama' drag their loaded train towards the dumper to discharge passing a similar consist. June 2002.
|
|

190107 0554389 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00201 built by CSR Yangtze Co China serial 2014/382-201 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190107 0626389 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00052 built by CSR Yangtze Co China serial 2014/382-52 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1619389 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00210 built by CSR Yangtze Co China serial 2014/382-210 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1650389 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00015 built by CSR Yangtze Co China serial 2014/382-15 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190109 1671389 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00056 built by CSR Yangtze Co China serial 2014/382-56 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

110620 2281389 viewsChapman, FMG TK type fuel tank waggon TK 01 built by China Southern CSR at their Zhuzhou Rolling Stock Works plant in China in 2008 as the first of an order for twelve tanks, is on the loaded fuel train to Cloud Break. 20th June 2011.
|
|

090121 1200389 viewsBoodarie, an FMG empty train with mismatched waggon pair slave 1367 22.6 tonnes tare and control 2170 22.9 tonne tare from the original CSR Zhuzhou Rolling Stock Works in China build from 2007.
|
|
| 19096 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
574 |  |
 |
 |
 |
 |
 |
 |
|