Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
110606_1752.jpg
110606 1752388 viewsFlash Butt yard, CNR-QRRS of China built ballast waggons, 0209 is a 99 tonne bottom discharge and 0711 is an 80 tonne side dump waggon, both built and delivered in early 2011.
150314_7754.jpg
150314 7754388 viewsBing Siding, empty 116 kL CNR-QRRS of China built tank waggon 0022, one of a batch of ten built in 2014.
150619_9083.jpg
150619 9083388 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0710 loaded with fines for sheeting, B end and bogie detail.
150619_9101.jpg
150619 9101388 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0713 loaded with fines for sheeting, A end and bogie detail.
030403_162252.jpg
030403 162252388 viewsCrystal Brook, view from the A end of former Australian National 600 class AE Goodwin built ALCo DL541 model 603 serial G6015-2.
241-19.jpg
241-19388 viewsNelson Point, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation. Three quarter rear view. June 2002.
190109_1570.jpg
190109 1570388 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00086 built by CSR Yangtze Co China serial 2014/382-86 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1658.jpg
190109 1658388 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00301 built by CSR Yangtze Co China serial 2014/382-301 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1660.jpg
190109 1660388 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00382 built by CSR Yangtze Co China serial 2014/382-382 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
080304_2204.jpg
080304 2204388 viewsThomas Yard, down the rail welding end, side view of control waggon 2516, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
246-06.jpg
246-06388 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
248-17.jpg
248-17388 viewsSeven Mile yard, stored Robe River ALCo locomotives at the south end of the Hamersley Iron Seven Mile yard on roads N2 and N3. On road N2 is 9427 a Comeng WA C636R rebuild from ALCo Schenectady NY model C636 serial 3499-2 originally built in January 1968 for Pennsylvania Railroad as #6331, Penn Central 6331 and finally Conrail 6781. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in January 1987. This loco also went on to become DR 8403 for construction of FMG's railway in 2007-08. Approximate location. 24th April 2004.
249-23.jpg
249-23388 viewsFortescue River Bridge on the Robe River line at the 115.8 km in flood looking downstream to the west following Cyclone John on 18th December 1999. Approximate location.
251-15.jpg
251-15388 viewsNelson Point, the South Yard 'prep shed' located on the dumper exit roads 102, 103 and, 104. This facility was used to service and fuel locomotives while their respective waggon rakes were being tipped through the car dumpers. 22nd April 2000.
245-15.jpg
245-15388 viewsWudinna, empty grain train shunts over Gooch Terrace as it takes a rake of waggons into the grain siding, former Australian National locomotive AE Goodwin ALCo model DL531 830 class units 851 serial 84137 has been on the Eyre Peninsula since delivered in 1962. 7th April 2003.
140601_4498.jpg
140601 4498388 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHCH type waggon CHCH 7665 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. 1st June 2014.
160710_iPh5S_2789.jpg
160710 iPh5S 2789388 viewsWittenoom Gorge, old exposed mine adit of the Gorge Mine which was right up the very top of Wittenoom Gorge. Geodata.
160710_iPh5S_2800.jpg
160710 iPh5S 2800388 viewsWittenoom Gorge, Colonial Mine, pile of unused timber sleepers for the underground railway.
210407_9865.jpg
210407 9865388 viewsParkeston, 2MP5 intermodal train, RRRY 7017, platform with RAND Refrigerated Logistics 46' 6" MFR3 type reefer container RAND 399. The RRRY type five pack bar coupled waggon set is one of nineteen built in China at Zhuzhou Rolling Stock Works for Goninan in 2005.
210407_9890.jpg
210407 9890388 viewsParkeston, 2MP5 intermodal train, RRZY 7049 platform 1 of 5-pack well waggon set. Originally was an RQZY type, a five unit bar coupled well container waggon built as one of a batch of thirty two by Goninan NSW for National Rail in 1995/96. Recoded to RRZY when repaired. Loaded with a Toll 48' MEG1 type container TCML 48459. National Rail logo still visible.
19096 files on 955 page(s) 580

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional