Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
060713_6546.jpg
060713 6546222 viewsBoodarie Yard, modified original Magor USA built Oroville waggon 576, cut down and covered and in use as indexing waggons on the front of each rake for Finucane Island car dumpers, note the original ODCX marking visible.
060714_6895.jpg
060714 6895222 viewsGarden Siding, flat waggon 8500, originally built by Tomlinson Steel WA for Goldsworthy Mining as one of six 55 ton flat waggons built in 1966, and later modified by BHP to increase its capacity, bogie and handbrake detail.
050411_0599.jpg
050411 0599222 viewsGoldsworthy Junction, BHP track machine ballast regulator BR 31 a Plasser Australia SSP 110SW model with serial 401 comes off the former Goldsworthy line at signal GJ 9 with the Newman mainline in the foreground. 11th April 2005.
050421_1620.jpg
050421 1620222 viewsHesta Siding backtrack, Speno Australia's two 24 stone rail grinders coupled together before they had id stickers fitted, the left unit was later stickered as RG 2, the right unit was stickered as RG 1 and is serial M20. 21st April 2005.
050625_3811.jpg
050625 3811222 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, some Barclay Mowlem track machines are off clear of the running lines, a sleeper crane is at the front with three sleeper inserters behind. 25th June 2005.
050801_4743.jpg
050801 4743222 viewsFlash Butt yard, BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 1st August 2005.
051001_5669.jpg
051001 5669222 viewsFlash Butt yard, a newly delivered Knox Kershaw KBR 875 ballast regulator serial 015-875-05. 1st October 2005.
060501_3924.jpg
060501 3924222 viewsAbydos Siding backtrack, Speno rail grinder RG 1, a RR24 model grinder with 24 grinding wheels, serial M20, generating set and second driving cab module. 1st May 2006.
080621_2725.jpg
080621 2725222 viewsGillman Siding, new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, the chutes can be seen standing up with the squeeze rollers behind the mesh.
100717_0671.jpg
100717 0671222 viewsFlash Butt yard, new rail stock carrier waggon 6025, built by Gemco Rail in late 2009-10 with Barber bogies.
110208_9446.jpg
110208 9446222 viewsFlash Butt yard, new rail stock carrier waggons 6038 and 6031 loaded with strings of rail, built by Gemco Rail in late 2009-10.
110411_10013.jpg
110411 10013222 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0011 from 1972, one of three such tank waggons.
150729_9455.jpg
150729 9455222 viewsBing Siding, empty 82 kL Comeng NSW built tank waggon 0003 one of six such tank waggons built in 1970-71.
171121_0965.jpg
171121 0965222 viewsBarker Siding which is the ballast loading point, one of two FMG ballast plough waggons BP 02, built in China by CSR at the Yangtze Rolling Stock Company in 2010 on the south end of a ballast rake. 21st November 2017.
190107_0454.jpg
190107 0454222 viewsParkeston, Mineral Resources Ltd MHPY type iron ore waggon MHPY 00364 built by CSR Yangtze Co China in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0571.jpg
190107 0571222 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00091 built by CSR Yangtze Co China serial 2014/382-91 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190107_0574.jpg
190107 0574222 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00124 built by CSR Yangtze Co China serial 2014/382-124 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1585.jpg
190109 1585222 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00271 built by CSR Yangtze Co China serial 2014/382-271 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1666.jpg
190109 1666222 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00279 built by CSR Yangtze Co China serial 2014/382-279 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
080124_1633.jpg
080124 1633222 viewsChapman Siding, detail of the bar coupling arrangement showing bar, the large hose is the through brake pipe and the small hose the control pipe for the slave waggon. 24th January 2008.
16913 files on 846 page(s) 581

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional