Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
060429_3734.jpg
060429 3734304 viewsFlash Butt yard, Pony re-laying waggon, originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966.
060429_3766.jpg
060429 3766304 viewsFlash Butt yard, view of Harsco 'Pony' track resleeping and relaying machine. Originally owned by Barclay Mowlem.
050410_0510.jpg
050410 0510304 viewsNelson Point yard hard stand area sees brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
050414_0951.jpg
050414 0951304 viewsFlash Butt yard, Speno Australia's 24 stone rail grinder before they had id stickers fitted, this front unit was later stickered as RG 2, rear view of the driving cab and generator module with the first grinding module. 14th April 2005.
050625_3811.jpg
050625 3811304 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, some Barclay Mowlem track machines are off clear of the running lines, a sleeper crane is at the front with three sleeper inserters behind. 25th June 2005.
050625_3815.jpg
050625 3815304 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, two Barclay Mowlem sleeper inserter track machines off clear of the running lines. 25th June 2005.
050801_4729.jpg
050801 4729304 viewsFlash Butt yard, a Knox Kershaw KBR 850 ballast regulator. 1st August 2005.
051001_5670.jpg
051001 5670304 viewsFlash Butt yard, Jackson model 6700 tamper serial 153246 lettered for Railway Equipment Leasing And Maintenance RELAM Inc undergoing delivery checks. 1st October 2005.
150314_7739.jpg
150314 7739304 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0013 from 1974-5, one of six such tank waggons.
150619_9086.jpg
150619 9086304 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0706 loaded with fines for sheeting.
160128_00334.jpg
160128 00334304 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0025, one of a batch of ten built in 2014.
170728_09689.jpg
170728 09689304 viewsRio Tinto compressor waggon set CB 12, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 28th July 2017.
241-33.jpg
241-33304 viewsNelson Point, Car Dumper 2 holding roads, a pair of CM40-8M units 5660 'Kure' serial 8412-05 / 94-151 and 5657 'Fukuyama' drag their loaded train towards the dumper to discharge passing a similar consist with the Ore Car Repair Shop in the background. June 2002.
190109_1566.jpg
190109 1566304 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00112 built by CSR Yangtze Co China serial 2014/382-112 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1630.jpg
190109 1630304 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00019 built by CSR Yangtze Co China serial 2014/382-19 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
243-17.jpg
243-17304 viewsNelson Point departure yard, BHP Billiton's CM40-8M unit 5634 'Boodarie' a Goninan WA GE rebuild unit serial 8151-07 / 91-120 in the new 'earth' or 'bubble' livery as it heads up an empty train waiting departure time. August 2003.
080124_1630.jpg
080124 1630304 viewsChapman Siding, new FMG ore waggon pair 1311 slave and 2312 control, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 24th January 2008.
080304_2171.jpg
080304 2171304 viewsThomas Yard, down the rail welding end, side view of slave waggon 1241, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
080304_2183.jpg
080304 2183304 viewsThomas Yard, down the rail welding end, side view of control waggon 2338, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
249-06.jpg
249-06304 viewsYule River bridge looking east upstream the third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
19085 files on 955 page(s) 600

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional