Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
081217_0456.jpg
081217 0456216 viewsWoodstock Siding, rail recovery and transport train flat waggon #1, rear lead off waggon 6203, built by Comeng WA in January 1977 under order number 07-M-282 RY. The straddle crane is a newish unit built by Vaia Car model no. TCR-V and the four wheels are chain driven, replacing the original Gemco hydraulic unit.
100717_0658.jpg
100717 0658216 viewsFlash Butt yard, new rail stock carrier waggon 6042, built by Gemco Rail in late 2009-10 with Barber bogies.
100717_0693.jpg
100717 0693216 viewsFlash Butt yard, new rail stock carrier waggon 6027, built by Gemco Rail in late 2009-10 with Barber bogies.
110411_09982.jpg
110411 09982216 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0002 from 1970, one of two water tank waggons, later converted to a weed spray tanker in 1977, then converted to fuel.
110411_09986.jpg
110411 09986216 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0008 one of six such tank waggons built in 1970-71.
150314_7739.jpg
150314 7739216 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0013 from 1974-5, one of six such tank waggons.
150523_8210.jpg
150523 8210216 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0044, one of a second batch delivered in 2015 with safety slogan 'Don't drive distracted'.
160128_00338.jpg
160128 00338216 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0040, one of a second batch delivered in 2015 with safety slogan 'Think Safe - Act Safe'.
241-28.jpg
241-28216 viewsNelson Point, Car Dumper 2 holding roads with Yard Control tower and Ore Car Repair Shop in the background as three loaded ore rakes behind a pair of CM40-8M units on each wait their turn through the dumper to discharge. June 2002.
241-33.jpg
241-33216 viewsNelson Point, Car Dumper 2 holding roads, a pair of CM40-8M units 5660 'Kure' serial 8412-05 / 94-151 and 5657 'Fukuyama' drag their loaded train towards the dumper to discharge passing a similar consist with the Ore Car Repair Shop in the background. June 2002.
190107_0625.jpg
190107 0625216 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00043 built by CSR Yangtze Co China serial 2014/382-43 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1655.jpg
190109 1655216 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00089 built by CSR Yangtze Co China serial 2014/382-89 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1661.jpg
190109 1661216 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00116 built by CSR Yangtze Co China serial 2014/382-116 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
190109_1665.jpg
190109 1665216 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00280 built by CSR Yangtze Co China serial 2014/382-280 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
243-05.jpg
243-05216 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan trails CM40-8M unit 5634 both in the new 'earth' or 'bubble' livery as they head up an empty train waiting departure time. August 2003.
243-11.jpg
243-11216 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
243-12.jpg
243-12216 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
243-14.jpg
243-14216 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
249-05.jpg
249-05216 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
253-01.jpg
253-01216 viewsDugite near the 64 km on the Dampier - Tom Price railway, a loaded Hamersley Iron train headed up by General Electric 9-44CW units 7078, from the original order, serial number 47757 and 7096, from the second order, serial number 52843 arrive taking the mainline to cross an empty which is in the passing track.
16913 files on 846 page(s) 604

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional