Most viewed |

209-09413 viewsGuildford station, narrow gauge Midland to Perth service departs with an Goninan NSW built ADL class railcar ADL 809 leading an ADC class.
|
|

150505 7951413 viewsFMG Solomon Line, looking back east from the same spot as 7950. Repeater tower in distance. Geodata: -22.0398833 118.6280733 .
|
|

150523 8238413 viewsNelson Point Yard, BHP Billiton SD70ACe unit leads a rake towards the dumpers. Lead unit 4327 'Hamersley' is from an order originally being built by Electro-Motive, London Ontario for BNSF, an US class 1 railroad, but BHP secured 10 of them during construction, this unit 4327 serial no. 20066862-056 was destined to be BNSF 9185 before coming to BHP.
|
|

240-37413 viewsSeven Mile, a pair of loaded Nippon Sharyo ore waggons, control waggon 021 on the right with slave waggon 068 and with hungry boards fitted to the top. 31st August 2002.
|
|

190911 4757413 viewsPort Hedland, Broome Rd crossing, BHP's MM 800 track recording vehicle powers south on a recording run, still wearing it's Movember 'mo' as part of a men's health campaign, the MM 800 was built by Mermec in Italy and is a ROGER 800 model, ROGER is an acronym for Rilievo Ottico Geometria Rotaia, Italian for optical rail geometry control.
|
|

200914 7797413 viewsPilbara Railways Historical Society, Comeng WA ALCo rebuild C636R locomotive 3017 serial WA-135-C-6043-04. The improved Pilbara cab was fitted as part of the rebuild in April 1985. Donated to Society in 1996. 14th September 2020.
|
|

041014 122536413 viewsPilbara Railways Historical Society museum, Australian built by Comeng NSW an MLW ALCo M636 unit formerly owned by Mt Newman Mining and BHP Iron Ore 5502 serial number C6096-7 built in July 1976, retired in 1994, donated to the Society in November 1995. 14th October 2004.
|
|

250-05413 viewsPelican Siding on the Hamersley Iron Tom Price line about the 208 km with an empty train behind the standard pairing of two General Electric built 9-44CW units 7068 serial 47747 and 7067 serial 47746 stand on the loop or passing track for a meet with a loaded train. 21st October 2000.
|
|

179-10412 viewsGheringhap, V/Line broad gauge G class locomotive G 515 Clyde Engineering EMD model JT26C-2SS serial 85-1243 leads a another G class with up loaded grain train 9122 as the fireman or 2nd person leans out the cab window to swap electric staves with the signaller to continue non-stop to North Geelong gain loop, while Gheringhap is equipped with automatic staff exchange apparatus, they are not used and the G class has no exchanger.
|
|

148-10412 viewsWangaratta, V/Line rail tractor RT 5 and VLBY type louvre van VLBY 148 on No.5 Rd, goods shed behind and point rodding in foreground, cover for automatic electric staff exchanger visible. RT 5 built new by Newport Workshops September 1957. The VLBY which is the Wangaratta parcels waggon started out being built by Newport Workshops October 1956 as a VP type VP 148, in May 1979 re-coded to VLPY, re-coded again in 1982 to VLBY.
|
|

114-20412 viewsGoorambat, broad gauge V/Line Grain VHHF type bogie grain waggon VHHF 822 in front of a Williamstown style silo. VHHF was built by Victorian Railways Ballarat North Workshops in 1982 as a VHHY type; recoded to VHHF in 1987.
|
|

140517-4328412 viewsEginbah Siding area, of the Marble Bar railway, looking back towards Eginbah along the alignment. Location here.
|
|

193-06412 viewsWamuran, looking north west in the Down direction towards Wamuran. Catch point to protect runaway waggons out of Wamuran.
|
|

198-15412 viewsPort Hedland Port, view of the Cargill Salt berth and loader, or PHPA Berth No. 3, in this 2001 view, the then new bulker loader is under construction and manganese is stockpiled on the ground. The BHP Finucane Island berth is visible along with the overland conveyor for the HBI plant.
|
|

200-10412 viewsMoorine Rock, Australian National AN class AN 6 a Clyde Engineering built EMD model JT46C serial 93-1302, sits on the mainline with a Perth bound freight, 1500 hrs 22nd June 1997.
|
|

203-03412 viewsBing Siding, an empty train behind a pair of BHP General Electric AC6000 units 6076 'Mt Goldsworthy' serial 51068 and class leader 6070 'Port Hedland' serial 51062 run around the passing track up to the departure signal.
|
|

208-1-08412 viewsBassendean, Rail Heritage WA Museum, exhibit #21, C class Mikado 2-8-2 steam engine V 1220, one of twenty four locomotives built for Beyer Peacock by Robert Stephenson & Hawthorn Ltd under contract. V 1220 enter service in 1956 and was withdrawn in 1971 and donated to the Museum in 1972.
|
|

211-10412 viewsWeipa, view from bottom of the kaolin silos looking towards the mouth of the Embley River with the bauxite wharf and kaolin feed conveyor associated infrastructure.
|
|

051102 6615412 viewsThevenard Maintenance Centre overview, with NJ class Clyde Engineering EMD JL22C model unit NJ 3 serial 71-730, built in 1971 at Clyde's Granville NSW workshops, started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. Still in AN green but lettered for Australian Southern Railroad and a lone ENH type hopper standing around 'on-shed'. Behind the sanding plant and shed are the no longer rail serviced grain silos.
|
|

150505 7979412 viewsFMG Solomon Line, waggon 4006, tare weight of 22 tonnes, built in 2009 by CSR Yangtze Rolling Stock Co. Ltd, loaded with fines ore. Geodata: -22.0187350 118.5850917 .
|
|
16913 files on 846 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
63 |  |
 |
 |
 |
 |
 |
 |
|