Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
210-04.jpg
210-04280 viewsWeipa, Lorim Point, Comalco rail dump station, view looking towards the workshops, shows inspection walkway and opening for unloading hopper, control cabin, the waggons are discharged on the left track behind the OPEN PIT sign.
211-01.jpg
211-01280 viewsWeipa, Lorim Point, view from the top of the kaolin storage silos looking west at No.1 bauxite ship loader and the two tug boats. The unloading barge can be seen in the background in the Embley River.
211-07.jpg
211-07280 viewsWeipa, Lorim Point, view from kaolin storage silos looking at Even's Landing in the background and the shiploading stockpile area of bauxite on the right while a storm threatens in the distance.
211-10.jpg
211-10280 viewsWeipa, view from bottom of the kaolin silos looking towards the mouth of the Embley River with the bauxite wharf and kaolin feed conveyor associated infrastructure.
217-11.jpg
217-11280 viewsPeterborough, an SP Perth bound service awaiting line clear behind the AN liveried quad combination of CL class Bulldog CL 11 Clyde Engineering EMD model AT26C serial 71-739, 600 class 605 AE Goodwin ALCo model DL541 serial G6015-4, and GM class Bulldogs GM 43 Clyde Engineering EMD model A16C serial 67-529 and GM 46 serial 67-532.
030414_154644.jpg
030414 154644280 viewsPenong , view looking west at yard across grade crossing, shelter on the left. Last train was in March 1997.
051102_6631.jpg
051102 6631280 viewsThevenard, left hand side view of NJ class Clyde Engineering EMD JL22C model unit NJ 6 serial 71-733, built in 1971 at Clyde's Granville NSW workshops, started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. Still in AN green but lettered for Australian Southern Railroad.
WTT_Nor_East_1986-09-03.pdf
WTT Nor East 1986-09-03280 viewsWorking Time-Table North-Eastern Region 3rd August 1986, complete 77 page PDF download, 13.9 MB.
119-04.jpg
119-04279 viewsNth Geelong C Box, V/Line broad gauge light locos X class X 47 Clyde Engineering EMD model G26C serial 75-794 and N class N 461 'City of Ararat' Clyde Engineering EMD model JT22HC-2 serial 86-1190 collect the electric staff for the Nth Geelong B Box section, bound for Geelong loco depot after finishing grain loop unloading duties.
108-18.jpg
108-18279 viewsToolamba station overview, station building, looking north, platform cut back and track removed.
135-09.jpg
135-09279 viewsIpswich yard, narrow gauge track machines.
Front unit is a Canron Mk I switch tamper, second unit is a Tamper Crib & Shoulder Compactor and the third unit is a Harsco ballast regulator.
186-10.jpg
186-10279 viewsMidland, empty narrow gauge grain train 283 rumbles past Midland Workshops behind a pair of Westrail P class locomotives P 2011 'Shire of Narembeen' Goninan GE model CM25-8 serial 6320-09/90-096 and P 2006 'Shire of Quairading' serial 6320-05/90-091.
192-14.jpg
192-14279 viewsJunee, NSWSRA standard gauge locomotive depot, a view looking through the fuelling point with the sanding facility behind that, stored 45 class units on the right.
195-19.jpg
195-19279 viewsWittenoom Gorge, view of the former market garden area and house remains, viewed from the cat walk on the western wall of the gorge.
196-19.jpg
196-19279 viewsWittenoom Gorge, Gorge Mine area, asbestos mining remains, ore waggon turntable track segment.
198-12.jpg
198-12279 viewsWittenoom Gorge, Crossing Pool.
217-07.jpg
217-07279 viewsKeswick Passenger Terminal, Australian National DL class locomotive DL 37 Clyde Engineering EMD model AT42C serial 88-1245 on the pointy end of 'The Ghan' as departure time approaches.
030414_154029.jpg
030414 154029279 viewsPenong, yard view looking along the goods loop, mainline can be seen in the grass on the right and the grain loop in the clear on the far right. Car is parked at Ascom silo block 1 loadout gantry, Pope is looking for more triangle track.
150505_7976.jpg
150505 7976279 viewsFMG Solomon Line, waggon pair 3005 and 4006, built in 2009 by CSR Yangtze Rolling Stock Co. Ltd, loaded with fines ore. Geodata: -22.0187350 118.5850917 .
040419_102034.jpg
040419 102034279 viewsAbydos back track, riveted flat waggon 202 with three water tanks fitted, 3/4 view from handbrake end, originally part of the 'camp train', modified by Mt Newman Mining railway workshops.
16610 files on 831 page(s) 63

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional