Most viewed |

040806 091154296 viewsGoldsworthy Junction, trailing view of the weighbridge test train with the four orange weighbridge test waggons and two Comeng built ore waggons to provide braking, 5666 is the power.
|
|

050518 2078296 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 751.
|
|

050518 2119296 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, view of number board and 50 t load stencil.
|
|

050518 2180296 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 517, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

051001 5696296 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #17, 6016 a Comeng WA built flat waggon from 1971 which carries no. 6506-016.
|
|

051001 5700296 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #18, 6012, detail of builders plate, a Scotts of Ipswich Qld built flat waggon with build date 11-09-1970.
|
|

050724 4213296 viewsNelson Point yard, Comeng NSW built 82 kilolitre water tank waggon 0001, one of two such tank waggons built in November 1970, attached to the Pony as they relay a road in the yard.
|
|

060501 3869296 viewsTabba Siding, originally built by Difco USA for Goldsworthy Mining Ltd in 1967 as a batch of five, prefixed with 870 in BHP service, 8701 side dump waggon loaded with ballast.
|
|

050625 3813296 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, three Barclay Mowlem sleeper inserter track machines off clear of the running lines. 25th June 2005.
|
|

050801 4761296 viewsBuilders plate for Tamper HSTR 130 model Barclay Mowlem tamping machine TM 8644 serial 3581011. 1st August 2005.
|
|

080621 2719296 viewsTabba South, one of a batch of six flat waggons converted by Mt Newman Mining workshops by cutting down a pair of ore waggons to make one flat waggon, 6103 in service with the rail recovery and transport train as waggon #3.
|
|

110411 09991296 viewsNelson Point, fuel tank waggon 0019 82 kL capacity, built by Comeng for BP as RTC 1, first of two such tanks, used on Mt Newman line, unsure when converted to 0019.
|
|

110411 10015296 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0015 from 1974-5, one of six such tank waggons, wearing the BHP Billiton Earth livery.
|
|

110619 1880296 viewsSouth of Mooka Siding, the Steel Train or rail recovery and transport train, flat waggon #10, 6204, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
|
|

241-02296 viewsNelson Point, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation with two C36-7M units 5506 and 5510 also awaiting removal from site. June 2002.
|
|

241-24296 viewsNelson Point, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation with two C36-7M units 5506 and 5510 also awaiting removal from site. June 2002.
|
|

243-08296 viewsNelson Point departure yard, BHP Billiton's CM40-8M unit 5634 'Boodarie' a Goninan WA GE rebuild unit serial 8151-07 / 91-120 in the new 'earth' or 'bubble' livery as it heads up an empty train waiting departure time. August 2003.
|
|

246-29296 viewsCape Lambert, a Robe River loaded Deepdale train rolls along the mainline with the normal 202 waggons which are a mix of builds from Nippon Sharyo Japan and Tomlinson Steel and Centurion Industries both WA companies. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. 22nd May 2002.
|
|

247-32296 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train is about to pass under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8 locomotives led by 9425 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 6266-8 / 89-85 from August 1989 riding on Hi-Ad bogies and was originally an AE Goodwin built M636 ALCo serial C-6041-4 and built new for Mt Newman Mining (later BHP Iron Ore) in April 1970 and numbered 5468, sold to Robe and delivered by road 17th August 1982. Location is here.22nd May 2002.
|
|

249-12296 viewsYule River bridge looking north from the bridge deck on the BHP mainline of the sunk track section. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|
| 19085 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
662 |  |
 |
 |
 |
 |
 |
 |
|