Most viewed |

060110 2227294 viewsKarkoo, empty grain train behind ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 and sent to the Eyre Peninsula in July 2004 and two 830 class AE Goodwin built ALCo model DL531 units 842 serial 84140 ex SAR broad gauge and to Eyre Peninsula in October 1987, and 851 serial 84137 new to Eyre Peninsula in 1962. Approx. location of image.
|
|

160525 4815294 viewsWest Kalgoorlie, AQHY 30105 with sulphuric acid tank CSA 0101, originally built by WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH type to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana, part of empty acid train 4405 departing in the yard. CSA 0101 was built by Vcare Engineering, India for Access Petrotec & Mining Solutions in 2015.
|
|

160525 4820294 viewsWest Kalgoorlie, AQHY 30089 with sulphuric acid tank CSA 0085, originally built by WAGR Midland Workshops in 1964/66 as a WF type flat waggon, then in 1997, following several recodes and modifications, was one of seventy five waggons converted to the WQH type to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana, part of empty acid train 4405 departing in the yard. CSA 0085 is one of twelve units built by Acid Plant Management Services, WA in 2015.
|
|

160527 5479294 viewsParkeston, loaded lime and cement shunt train 2C71 from West Kalgoorlie to Parkeston for Cockburn Lime. APNY 31156, one of twelve built by WAGR Midland Workshops in 1974 as WNA type pneumatic discharge nickel concentrate waggon, WAGR built and owned copies of the AE Goodwin built WN waggons for WMC.
|
|

070531 9617294 viewsParkeston, Pacific National RZBY type crew accommodation car RZBY 208 on train 3MP4, built by Comeng NSW as ER type stainless steel air conditioned crew dormitory car ER 208 in 1969, sold to National Rail and converted to crew car in 1997.
|
|

161111 2508294 viewsBinduli, Kalgoorlie Freighter train 5025, waggon ATBY 14590 fuel tank waggon built by Westrail Midland Workshops in a batch of nine in 1981-82 for Bain Leasing Pty Ltd as type JPB, 82,000 litres for narrow gauge, recoded to JPBA in 1986, converted to standard gauge as WJPB.
|
|

040806 092046294 viewsGoldsworthy Junction, 5666 runs the weighbridge test train with the four orange weighbridge test waggons and two ore waggons to provide braking.
|
|

050319 0143294 viewsNelson Point, rail recovery and transport train, 2nd lead off waggon 6201, built by Comeng WA, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible.
|
|

050412 0767294 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA waggon 533, originally in ore service before conversion to a ballast waggon.
|
|

050518 2135294 viewsFlash Butt yard, CFCLA hire ballast waggon CHQY type CHQY 740, shows hand brake and shunters step detail.
|
|

050518 2171294 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 503, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

050518 2203294 viewsBing Siding, view of number plate and original markings on ballast waggon 519.
|
|

050704 3993294 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0014 from 1974-5, one of six such tank waggons.
|
|

051001 5644294 viewsFlash Butt yard, side view of ballast plough converted from Magor USA built Oroville ore waggon 538, still visible is the ODCX 82160 number from original service building the Oroville Dam, through brake pipe is visible over the top of waggon.
|
|

051001 5690294 viewsBoodarie, the Steel Train or rail recovery and transport train, builders plate detail of flat waggon #14, 6207, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
|
|

051001 5692294 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #16, 6009, a Scotts of Ipswich Qld built flat waggon from September 1970.
|
|

051001 5702294 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #20, 6010, a Scotts of Ipswich Qld built flat waggon from September 1970.
|
|

051001 5724294 viewsBoodarie, the Steel Train or rail recovery and transport train, 1st lead off waggon 6011, built by Scotts of Ipswich 04-09-1970, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible.
|
|

060429 3736294 viewsFlash Butt yard, Pony re-laying waggon, 6001 originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966 of which three were sold to Mt Newman Mining in 1967 and numbered 6001-6003.
|
|

060429 3744294 viewsFlash Butt yard, Pony re-laying flat waggon, in service as a transport waggon for a gantry car and sleepers. Originally in service with Goldsworthy Mining as a BC or BCV box van, built by Comeng WA in 1966.
|
|
| 19085 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
678 |  |
 |
 |
 |
 |
 |
 |
|