Most viewed |

110411 09984131 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0002 from 1970, one of two water tank waggons, later converted to a weed spray tanker in 1977, then converted to fuel.
|
|

110411 09996131 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0012 from 1972, one of three such tank waggons.
|
|

110411 10016131 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0013 from 1974-5, one of six such tank waggons.
|
|

110411 10017131 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0013 from 1974-5, one of six such tank waggons.
|
|

110411 10025131 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0004 one of six such tank waggons built in 1970-71.
|
|

110411 10032131 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0004 one of six such tank waggons built in 1970-71.
|
|

150523 8207131 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0031, class leader of a second batch delivered in 2015 with safety slogan 'Safety - It's your life'.
|
|

150619 9080131 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0710 loaded with fines for sheeting, A end and bogie detail.
|
|

100329 8041131 viewsRio Tinto compressor waggon set CB 05, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers closet to camera. Note the waggons are cut down ore waggons and the wheels are marked 70 kph max. Seen here just outside of 7 Mile. 29th March 2010.
|
|

243-08131 viewsNelson Point departure yard, BHP Billiton's CM40-8M unit 5634 'Boodarie' a Goninan WA GE rebuild unit serial 8151-07 / 91-120 in the new 'earth' or 'bubble' livery as it heads up an empty train waiting departure time. August 2003.
|
|

243-19131 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
|
|

080116 1377131 viewsChapman Siding, FMG slave waggon 1187, built by CSR at their Zhuzhou Rolling Stock Works in China during August 2007, view of the builders plate and bracket for RFID tag. 16th January 2008.
|
|

080124 1624131 viewsChapman Siding, side view of control waggon 2256, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 24th January 2008.
|
|

080124 1630131 viewsChapman Siding, new FMG ore waggon pair 1311 slave and 2312 control, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 24th January 2008.
|
|

080304 2171131 viewsThomas Yard, down the rail welding end, side view of slave waggon 1241, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

110620 2280131 viewsChapman, FMG TK type fuel tank waggon TK 11 built by China Southern CSR at their Zhuzhou Rolling Stock Works plant in China in 2008 as part of an order for twelve tanks, is on the loaded fuel train to Cloud Break. 20th June 2011.
|
|

247-33131 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train passes under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8 locomotives led by 9425 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 6266-8 / 89-85 from August 1989 and was originally an AE Goodwin built M636 ALCo serial C-6041-4 new for Mt Newman Mining (later BHP Iron Ore) in April 1970 and numbered 5468, sold to Robe and delivered by road 17th August 1982, compare to second unit 9410 with a Comeng style large flat fuel tank. Location is here.22nd May 2002.
|
|

248-01131 viewsDingo Siding on the Hamersley Iron railway at the 39 km with an empty train headed up by a pair of General Electric built Dash 9-44CW units 7077 serial 47756 from the original first order in the Pepsi Can livery and 9408 serial 54158 from the fourth order in the Pilbara Rail livery with Robe ownership markings. Approximate location. 24th April 2004.
|
|

248-23131 viewsSeven Mile yard, stored Robe River ALCo locomotives at the south end of the Hamersley Iron Seven Mile yard on roads N2 and N3. On road N2 is 9427 a Comeng WA C636R rebuild from ALCo Schenectady NY model C636 serial 3499-2 originally built in January 1968 for Pennsylvania Railroad as #6331, Penn Central 6331 and finally Conrail 6781. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in January 1987. This loco also went on to become DR 8403 for construction of FMG's railway in 2007-08. Approximate location. 24th April 2004.
|
|

249-07131 viewsYule River bridge looking north east upstream the third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|
16911 files on 846 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
689 |  |
 |
 |
 |
 |
 |
 |
|