Most viewed |

240328 296275 viewsWOE type iron ore waggon WOE 33336 is one of a batch of one hundred and forty one built by United Goninan WA between November 2005 and April 2006 with serial number 950142-041 and fleet number 835, in Mineral Resources traffic 5040 empty Mount Walton iron ore train. March 28, 2024.
|
|

100731 0294574 viewsWOE type iron ore waggon WOE 30258 is one of a batch of one hundred and thirty built by Goninan WA between March and August 2001 with serial number 950092-008 and fleet number 608 for Koolyanobbing iron ore operations, on loaded train 7415 at Binduli Triangle, 31st July 2010.
|
|

130703 025374 viewsKaldow, running south with the sun behind it is 1200 class 1204 a Clyde Engineering built EMD G12C model with serial 65-428 leading two ALCo units and was originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513. It came to the Eyre Peninsula in October 2004. Geo location. 3rd July 2013.
|
|

130703 025674 viewsKaldow, running south with the sun behind it is 1200 class 1204 a Clyde Engineering built EMD G12C model with serial 65-428 leading two ALCo units and was originally built in 1965 for Western Mining Corporation and operated by the WAGR as their A class A 1513. It came to the Eyre Peninsula in October 2004. Geo location. 3rd July 2013.
|
|

130703 027574 viewsKaldow, HCN type bogie grain hopper waggon HCN 4, originally an NHB type hopper built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Seen here loaded with grain with a Moose Metalworks roll-top cover.
|
|

130703 029974 viewsKaldow, HAN type bogie grain hopper waggon HAN 2, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
|
|

130705 053974 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.
|
|

225-2274 viewsAt the 24.1 km grade crossing on the BHP Newman line, the afternoon departure for Yandi mine heads south behind the standard double General Electric AC6000 units with GE Erie built 6075 serial 51067 second unit to lead sister unit 6074 with another AC6000 unit mid-train. This was before the units were named. GeoData.
|
|

160530 910674 viewsParkeston, SCT train 1PM9 operates mostly empty from Perth to Melbourne, PBHY type covered van PBHY 0061 Greater Freighter, one of a second batch of thirty units built by Gemco WA without the Greater Freighter signage.
|
|

246-0874 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
|
|

246-2974 viewsCape Lambert, a Robe River loaded Deepdale train rolls along the mainline with the normal 202 waggons which are a mix of builds from Nippon Sharyo Japan and Tomlinson Steel and Centurion Industries both WA companies. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. 22nd May 2002.
|
|

246-3674 viewsCape Lambert, a Robe River loaded Deepdale train rolls along the mainline behind the standard quad Dash 8 power with 202 waggons which are a mix of builds from Nippon Sharyo Japan and Tomlinson Steel and Centurion Industries both WA companies. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. The newly extended roads can be seen either side of the train and in the distance can be seen are the railway workshops. 22nd May 2002.
|
|

249-2474 viewsFortescue River Bridge on the Robe River line at the 115.8 km in flood looking downstream to the west from the middle of the bridge following Cyclone John on 18th December 1999. Approximate location.
|
|

249-2574 viewsFortescue River Bridge on the Robe River line at the 115.8 km in flood looking upstream to the east from the middle of the bridge following Cyclone John on 18th December 1999. Approximate location.
|
|

267-0274 viewsGoldsworthy Junction, BHP's 1230 empty departure behind General Electric AC6000 unit 6076 'Mt Goldsworthy' serial number 51068 leads CM40-8MEFI 5669 on the point with mid-train units CM40-8M units 5651 and 5645 104 waggons back with 104 waggons trailing. 1247 hrs 12th of April 2002.
|
|

268-1474 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
|
|

160711 iPh5S 282874 viewsWittenoom cemetery located in the grounds of the old airport alongside the old north-west/south-east running runway. Sign placed in 2015. Location is here.
More details can be found on these two websites, Oz Burials, and WA4WD.
|
|

283-2274 viewsHarding Siding, quad Robe River CM40-8M units all rebuilt by Goninan from various ALCo models show their tank and bogie differences here. 9414, 9420, 9410 and 9425 lead 202 loaded ore waggons at Siding 1 (Harding). The siding has recently been renamed Harding and extended at the north end to accommodate the new West Angelas trains of up to 240 waggons. Wednesday 22nd May 2002.
|
|

210407 985174 viewsParkeston, 2MP5 intermodal train, RRXY 2, platform 2 empty. The RRXY type 5-pack well waggon set is one of eleven built by Bradken Qld in 2002 for Toll from a Williams-Worley design.
|
|

210407 985474 viewsParkeston, 2MP5 intermodal train, RRXY 2, platform 5 with a CEVA 51' container IYV 538. The RRXY type 5-pack well waggon set is one of eleven built by Bradken Qld in 2002 for Toll from a Williams-Worley design.
|
|
16867 files on 844 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
724 |  |
 |
 |
 |
 |
 |
 |
|