Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
267-03.jpg
267-0319 viewsGoldsworthy Junction, BHP's 1230 empty departure behind General Electric AC6000 unit 6076 'Mt Goldsworthy' serial number 51068 leads CM40-8MEFI 5669 on the point with mid-train units CM40-8M units 5651 and 5645 104 waggons back with 104 waggons trailing. 1247 hrs 12th of April 2002.
267-15.jpg
267-1519 viewsGoldsworthy Junction, the Sundowner Special is on the Newman mainline leg of the Goldsworthy Junction and triangle, with the Sundowner coach in between CM40-8M GE unit 5634 'Boodarie' serial number 8151-07 / 91-120 and sister CM40-8M 5653. This train, and the empty before it, were delayed due to a jamming switch for the transfer road where Tamper 2 and Ballast Regulator 31 can be seen holding track. The road curving around to the left is the Goldsworthy mainline to Boodarie and Finucane Island. Friday 12th of April 2002.
268-24.jpg
268-2419 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
269-10.jpg
269-1019 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
269-11.jpg
269-1119 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
269-20.jpg
269-2019 viewsGoldsworthy Junction, and the Alstom 25-year service agreement special led by BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
120415_IMG_P10022.jpg
120415 IMG P1002219 viewsWest Kalgoorlie, PTLY type gas tank waggon PTLY 3, built by Industrial Engineering Qld in 1975 as a Tg type tank waggon for South Australian Railways as Tg 3, to the VR as TWF type TWF 12 in 1978, then to VTGY type in 1979 and VTGY type in 1981. Off VR register 1988 and to AN as ATLX type ATLX 3, then to ATLY. Peter Donaghy image.
110620_2014r.jpg
110620 2014r19 viewsWalla Siding, comparison between two empty BHP ore waggons with the tapered floor design. 4507 was built by Transfield WA in in 1976 in an order for eighteen waggons, while 4260 is a Goninan WA build from an order of one hundred and twenty-six waggons using 3CR12 stainless steel in an effort to eliminate internal painting and reducing wear on the waggon body, these were designated HC7081. 20th of June 2011.
030712_142543.jpg
030712 14254319 viewsNelson Point, empty BHP ore waggon 553, one of the original Magor USA build waggons bought out at construction of the Mt Newman project. Visible is the ODCX code and number 82190 from the Oroville Dam Construction company days in the USA. Unsure of the MS6-82 code, the DZ 11-95 code was the late time it was internally painted to reduce wear and the SL 76 with 92 below it was the last time the Miner SL-76 draft gear was replaced. 12th of July 2003.
030712_142557.jpg
030712 14255719 viewsNelson Point, empty BHP ore waggon 553, one of the original Magor USA build waggons bought out at construction of the Mt Newman project. Visible is the ODCX code and number 82190 from the Oroville Dam Construction company days in the USA. The DZ 11-95 code was the late time it was internally painted to reduce wear and the SL 76 with 90 below it was the last time the Miner SL-76 draft gear was replaced. 12th of July 2003.
247-24.jpg
247-2418 viewsCape Lambert overview of the fuel point, with a brace of four Goninan WA CM40-8M GE rebuilds finishing up refuelling before departing with another empty train as a loaded rake is dragged to the dumper behind them. The workshops are to the left of the picture. Where I'm standing to take the picture is now all stockpile. Approximate location of photo is here. 22nd May 2002.
247-30.jpg
247-3018 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train is about to pass under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8. Location is here.22nd May 2002.
248-02.jpg
248-0218 viewsDingo Siding on the Hamersley Iron railway at the 39 km with an empty train headed up by a pair of General Electric built Dash 9-44CW units 7077 serial 47756 from the original first order in the Pepsi Can livery from 1994 still looking good some ten years later. Approximate location. 24th April 2004.
248-12.jpg
248-1218 viewsDingo Siding on the Hamersley Iron railway at the 39 km with an empty train headed up by a pair of General Electric built Dash 9-44CW units 7077 serial 47756 from the original first order in the Pepsi Can livery and 9408 serial 54158 from the fourth order in the Pilbara Rail livery with Robe ownership markings powers away to the south with the signal marker boards are in the distance. Approximate location. 24th April 2004.
251-12.jpg
251-1218 viewsNelson Point, BHP's recently retired Goninan WA ALCo C636 to GE C36-7M rebuild unit 5511 builders plate. 22nd April 2000.
251-24.jpg
251-2418 viewsNelson Point hard stand area, BHP's 5631 'Apollo' built new in October 1988 by Goninan as a GE CM39-8 model with serial number 5831-10 / 88-080. One of four such units built in 1988 and delivered in the Mt Newman orange livery. 22nd April 2000.
252-03.jpg
252-0318 viewsCockatoo Siding 273 km on the Hamersley Iron line to Yandi, General Electric built 9-44CW unit 7088 with serial number 47767 from the original 1994 build idles away on the eastern end of the ballast train as it is loaded and slowly progresses into the back track siding Ballast plough BP 02 is behind the locomotive. Location is roughly here. 24th November 2001.
210322_9575.jpg
210322 957518 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is Chinese built ballast waggon BAH 091 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
210322_9576.jpg
210322 957618 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is Chinese built ballast waggon BAH 100 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
210510_1137.jpg
210510 113718 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTB 016 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
16103 files on 806 page(s) 731

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional