Most viewed |

130703 0274350 viewsKaldow, HCN type bogie grain hopper waggon HCN 11, originally an NHB type hopper built by Tulloch Ltd for the Commonwealth Railways North Australia Railway. One of forty rebuilt by Islington Workshops 1978-79 to the HCN type with a 36 ton rating, increased to 40 tonnes in 1984. Seen here loaded with grain with a Moose Metalworks roll-top cover. Geo location. 3rd July 2013.
|
|

130705 0640350 viewsLock, HAN type bogie grain hopper waggon HAN 13, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
|
|

100731 3239350 viewsBinduli, AQHY 30077 with sulphuric acid tank CSA 0061, originally built by the WAGR Midland Workshops in 1964/66 at WF type flat waggons, then following several codes and modifications in 1997 seventy five were converted to WQH to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana.
|
|

226-20350 viewsShaw North, 216.5 km, all the departure signals in a row looking across the cutting. SWN 4R, SWN 4, SWN 6 and SWN 6R for north bound movements. GeoData.
|
|

235-07350 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 arrives with the afternoon 240 waggon empty train, the hydraulic lines and dust extraction equipment frame the loco.
|
|

236-30350 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's General Electric built AC6000 unit 6071 'Chichester' serial 51063 sits out the front with new windscreen protectors or 'blinkers' fitted next to sister unit 6077.
|
|

160525 4400350 viewsKalgoorlie, Malcolm freighter, train 3029, AZKY type anhydrous ammonia tank waggon AZKY 32242, the final unit of twelve units built by Goninan WA in 1998 as type WQK for Murrin Murrin traffic, fitted with Bis Industries anhydrous ammonia tank.
|
|

050625 3661350 viewsMooka North, BHP's new Tamper 3 track machine a Plasser Australia 09-3X model serial M480 in out on the passing track, view of the tamping heads and mechanism. 25th June 2005.
|
|

051001 5676350 viewsFlash Butt yard, Jackson model 6700 tamper serial 153246 lettered for Railway Equipment Leasing And Maintenance RELAM Inc undergoing delivery checks. 1st October 2005.
|
|

060710 6233350 viewsAt the Broome Rd grade crossing Port Hedland, track machine BR 33 a Plasser Australia ballast regulator model SSP 302 serial M486. 10th July 2006.
|
|

249-03350 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

251-14350 viewsNelson Point, BHP's retired Goninan WA's ALCo C636 to GE C36-7M rebuilds, these were the first time in the world that an ALCo C636 had been rebuilt into an GE C36-7, are lined up near the service shop awaiting their fate. The line is 5510, 5506, 5508, 5512, 5513, 5507, 5509, 5511, and, 5513. They had recently been displaced due to the arrival of the AC6000 units which also took their name plates. Only two units would go on to survive 5507 and 5508. 22nd April 2000.
|
|

252-19350 viewsBetween Pelican and Possum sidings, bridge at the 220.6 km. Location is roughly here.
|
|

252-30350 viewsPort Hedland at 12 Mile Creek a loaded Yarrie train crosses over the creek behind Goninan CM40-8M GE rebuild unit 5645 'Sherlock' serial number 8281-11 / 92-134. Early December 2001.
|
|

252-35350 viewsBoodarie, a loaded Yarrie train is crossing the Roebourne Rd at the 9.6 km behind Goninan CM40-8M GE rebuild unit 5645 'Sherlock' serial number 8281-11 / 92-134. Early December 2001.
|
|

210510 1116350 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTW 004 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

210510 1142350 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTW 011 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

210510 1144350 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTW 009 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

210510 1148350 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTW 005 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

255-30350 viewsWestern Creek at the 71 km on the Cape Lambert to Deepdale line an empty Robe River train powers upgrade behind the standard quad CM40-8M lash up led by Goninan CM40-8M unit 9425 and 9410 with serial number 2160-03 / 96-202. The Western Creek interconnecting line can be seen branching off to the right. Geodata location here. May 2002.
|
|
| 19096 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
741 |  |
 |
 |
 |
 |
 |
 |
|