Most viewed |

252-3351 viewsPort Hedland at 12 Mile Creek a loaded Yarrie train crosses over the creek behind Goninan CM40-8M GE rebuild unit 5645 'Sherlock' serial number 8281-11 / 92-134. Early December 2001.
|
|

252-3751 viewsBoodarie, a loaded Yarrie train is approaching the yard behind Goninan CM40-8M GE rebuild unit 5645 'Sherlock' serial number 8281-11 / 92-134. Early December 2001.
|
|

210510 113751 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTB 016 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

253-0451 viewsDugite near the 64 km on the Dampier - Tom Price railway, as an empty Hamersley Iron ore train sits in the passing track behind General Electric 9-44CW unit 7066 with serial number 47745 as a loaded rolls by on the mainline behind sister 9-44CW unit 7078 serial number 47757. Both of these units are from the original order and built in October 1994.
|
|

253-0651 viewsDugite near the 64 km on the Dampier - Tom Price railway, second unit on a loaded Hamersley Iron train General Electric 9-44CW unit 7096 from the second order of locomotives with serial number 52843.
|
|

254-0551 viewsWalla Siding, 55 km area, spinifex fire beside the access road.
|
|

254-2251 viewsBing Siding, an empty train awaits departure time behind 6071 an General Electric built AC6000 model with serial number 51063. The locomotive has not yet been named. Second unit is Goninan rebuilt CM40-8MEFI locomotive 5668. September 2001.
|
|

254-2451 viewsBing Siding, an empty train departs behind 6071 an General Electric built AC6000 model with serial number 51063. The locomotive has not yet been named. Second unit is Goninan rebuilt CM40-8MEFI locomotive 5668. September 2001.
|
|

254-2751 viewsBing Siding at the 20 km, an empty train departs south with Goninan rebuild unit 5668 'Dunkirk' an CM40-8MEFI model with serial number 8412-01 / 95-159, one of the last four rebuilds with an EFI 7FDL engine. It is trailing AC6000 unit 6071. September 2001.
|
|

255-1451 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur curving away to the left while the Deepdale line is on the right. Geodata location here. May 2002.
|
|

255-2851 viewsWestern Creek at the 71 km on the Cape Lambert to Deepdale line an empty Robe River train powers upgrade as it heads to Mesa J for loading behind the standard quad CM40-8M lash up led by Goninan CM40-8M unit 9425 with serial number 6266-08 / 89-85 and sisters 9410, 9420 and 9414. Geodata location here. May 2002.
|
|

255-3751 viewsEmu Siding on the Hamersley Iron Dampier to Tom Price line with the Western Creek Robe River interconnecting line joining the East Mainline, the mileage is 76.3 km on the Robe and 78.4 on the HI. The interconnecting line branches off the Robe River Cape Lambert to Deepdale line at the 71.1 km. Geodata location here. May 2002.
|
|

256-1051 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|

256-1651 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.
|
|

256-2951 viewsAt the 89.6 km grade crossing and with the meet at Maitland completed the loaded train continues onto Cape Lambert behind the quad CM40-8M working. May 2002.
|
|

257-1851 viewsFlash Butt yard Mount Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW awaits its fate. Late 2021.
|
|

190129 423851 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00050 built by CSR Yangtze Co China serial 2014/382-50 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190129 425351 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00362 built by CSR Yangtze Co China serial 2014/382-362 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190129 430351 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00263 built by CSR Yangtze Co China serial 2014/382-263 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190129 431951 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00251 built by CSR Yangtze Co China serial 2014/382-251 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
16610 files on 831 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
749 |  |
 |
 |
 |
 |
 |
 |
|