Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
231020_8142.jpg
231020 8142117 viewsParkeston, ACD class locomotive ACD 6048 built by Goninan NSW as a GE C44ACi model in April 2022, trails on 4UP1 along the mainline at Parkeston enroute to Kwinana, 20th of October 2023.
231020_8147.jpg
231020 8147117 viewsParkeston, QQYY type 40' container waggon QQYY 57687 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000709 with Cristal decal and CRM 000893 with Cristal decal, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
231020_8158.jpg
231020 8158117 viewsParkeston, QQYY type 40' container waggon QQYY 57954 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 001569 with Cristal decal and CRM 001681 with Cristal decal, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
231020_8171.jpg
231020 8171117 viewsParkeston, QQYY type 40' container waggon QQYY 57943 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 001449 with Tronox decal and yellow corner posts and CRM 001243 with Tronox decal and yellow corner posts, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
231020_8174.jpg
231020 8174117 viewsParkeston, QQYY type 40' container waggon QQYY 57816 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000265 with Cristal decal and yellow corner posts and CRM 001183 with Cristal decal and yellow corner posts, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
231020_8233.jpg
231020 8233117 viewsParkeston, QQYY type 40' container waggon QQYY 57962 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 001455 with Cristal decal and yellow corner posts and CRM 001518 with Cristal decal and yellow corner posts, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
231020_8234.jpg
231020 8234117 viewsParkeston, QQYY type 40' container waggon QQYY 57881 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000448 with Cristal decal and yellow corner posts and CRM 000398 with Tronox decal and yellow corner posts, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
240701_2739.jpg
240701 2739117 viewsPilbara Railways Historical Society, Comeng WA ALCo rebuild C636R locomotive 3017 serial WA-135-C-6043-04. The improved Pilbara cab was fitted as part of the rebuild in April 1985. Donated to Society in 1996. July 1, 2024.
240701_2760.jpg
240701 2760117 viewsPilbara Railways Historical Society, PWT 1 the water gin waggon used with the steam locomotive Pendennis Castle, this waggon had a proportional valve fitted to control the Westinghouse brake system on the train via the vacuum brake on the Pendennis Castle. July 1, 2024.
240701_2765.jpg
240701 2765117 viewsPilbara Railways Historical Society, Australian built by Comeng NSW an MLW ALCo M636 unit formerly operated by Mt Newman Mining and BHP Iron Ore 5502 serial number C6096-7 built July 1976, retired in 1994 and donated to the Society in 1995. July 1, 2024.
240701_2768.jpg
240701 2768117 viewsPilbara Railways Historical Society museum, 5450 a USA built EMD model F7A serial 8970 and frame 3006-A9, built Jan-1950 for Western Pacific Railroad as 917-A, imported for the Mt Newman Mining Co. to construct their Port Hedland to Newman railway in December 1967. Donated to the Society in 1978. July 1, 2024.
240328_3125.jpg
240328 3125117 viewsHampton Ballast Siding, Watco's 5WS4 loaded acid transfer train with 57' DQHY type flat waggon built by CRRC, China in 2022 as a batch of sixty for Watco to carry the CSA acid tanks, DQHY 13012 with CSA-0130 acid tank. March 28, 2024.
233-32.jpg
233-32116 viewsYandi Two, BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5634 'Boodarie' serial 8151-07 / 91-120 shows the ALCo heritage from the frame down and is wearing the teal and marigold logo. 5634 was the first CM40-8M rebuild for BHP. GeoData.
246-07.jpg
246-07116 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
247-25.jpg
247-25116 viewsCape Lambert overview of the fuel point, with a brace of four Goninan WA CM40-8M GE rebuilds finishing up refuelling before departing with another empty train as a loaded rake is dragged to the dumper behind them. The workshops are to the left of the picture. Where I'm standing to take the picture is now all stockpile. Approximate location of photo is here. 22nd May 2002.
252-31.jpg
252-31116 viewsPort Hedland at 12 Mile Creek a loaded Yarrie train crosses over the creek behind Goninan CM40-8M GE rebuild unit 5645 'Sherlock' serial number 8281-11 / 92-134. Early December 2001.
210510_1144.jpg
210510 1144116 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTB 009 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
253-18.jpg
253-18116 viewsView of Nelson Point B Berth with the vessel China Steel Developer being loaded, China Steel Developer carries the IMO #9171424 and was completed in November 1998 by CSBC Corporation at Kaohsiung in Taiwan with yard number 688, reported as scrapped at Gadani Beach 27th May 2016.
253-35.jpg
253-35116 viewsNelson Point hard stand area, riveted flat waggon 202 with three water tanks fitted, side profile view, originally part of the 'camp train', modified by Mt Newman Mining railway workshops.
255-15.jpg
255-15116 viewsAt the 162.2 km looking north are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. The Deepdale lone is on the left while the spur runs behind the photographer and curves away from the Deepdale line. Geodata location here. May 2002.
16911 files on 846 page(s) 765

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional