Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
284-26.jpg
284-26183 viewsNarngulu, Geraldton, former Westrail P class loco P 2014 'Shire of Wongan-Ballidu' built by Goninan WA as a GE CM25-8 model with serial number 6320-12 / 90-099 sits in the yard in-between shunt movements. November 10, 2004.
240328_3120.jpg
240328 3120183 viewsHampton Ballast Siding, Watco's 5WS4 loaded acid transfer train with 57' DQHY type flat waggon built by CRRC, China in 2022 as a batch of sixty for Watco to carry the CSA acid tanks, DQHY 13023 with CSA-0127 acid tank. March 28, 2024.
100731_02366.jpg
100731 02366182 viewsWOE type iron ore waggon WOE 33454 is leader of a batch of five built by United Group Rail WA between August and September 2008 with serial number 950210-001 and fleet number 8958 for Koolyanobbing iron ore operations, on loaded train 6413 at Binduli Triangle, 31st July 2010.
100731_02425.jpg
100731 02425182 viewsWO type iron ore waggon WO 31301 is one of a batch of fifteen built by WAGR Midland Workshops between July and October 1968 with fleet number 179 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, on empty train 6418 at Binduli Triangle, 31st July 2010. This unit was converted to WOC for coal in 1986 till 1994 when it was re-classed back to WO.
100731_02463.jpg
100731 02463182 viewsWOE type iron ore waggon WOE 31131 is one of a batch of one hundred and thirty built by Goninan WA between March and August 2001 with serial number 950092-121 and fleet number 713 for Koolyanobbing iron ore operations, on empty train 6418 at Binduli Triangle, 31st July 2010.
100731_02494.jpg
100731 02494182 viewsWOE type iron ore waggon WOE 33576 is one of a batch of one hundred and twenty eight built by United Group Rail WA between August 2008 and March 2009 with serial number 950211-116 and fleet number 9072 for Koolyanobbing iron ore operations, on empty train 6418 at Binduli Triangle, 31st July 2010.
100731_02531.jpg
100731 02531182 viewsWO type iron ore waggon WO 31291 is one of a batch of fifteen built by WAGR Midland Workshops between July and October 1968 with fleet number 170 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, on empty train 6418 at Binduli Triangle, 31st July 2010.
100731_02878.jpg
100731 02878182 viewsWOD type iron ore waggon WOD 31463 is one of a batch of sixty two built by Goninan WA between April and August 2000 with serial number 950086-035 and fleet number 526 for Koolyanobbing iron ore operations with a 75 ton capacity for Portman Mining to cart their Koolyanobbing iron ore to Esperance, now with PORTMAN painted out, on loaded train 7415 at Binduli Triangle, 31st July 2010.
100731_03065.jpg
100731 03065182 viewsWOC type iron ore waggon WOC 31346 is one of a batch of thirty built by Goninan WA between October 1997 to January 1998 with fleet number 406 for Koolyanobbing iron ore operations with a 75 ton capacity and lettered for KIPL, Koolyanobbing Iron Pty Ltd which has had KIPL painted over, empty train arriving at Binduli Triangle, 31st July 2010.
100731_03068.jpg
100731 03068182 viewsWO type iron ore waggon WO 31282 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 162 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, empty train arriving at Binduli Triangle, 31st July 2010. This unit was converted to WOS superphosphate in the late 1980s till 1994 when it was re-classed back to WO.
100731_03086.jpg
100731 03086182 viewsWOE type iron ore waggon WOE 33430 is one of a batch of one hundred and forty one built by United Group Rail WA between November 2005 and April 2006 with serial number 950142-135 and fleet number 8929 for Koolyanobbing iron ore operations, empty train arriving at Binduli Triangle, 31st July 2010.
100731_03100.jpg
100731 03100182 viewsWOE type iron ore waggon WOE 30287 is one of a batch of one hundred and thirty built by Goninan WA between March and August 2001 with serial number 950092-037 and fleet number 629 for Koolyanobbing iron ore operations, empty train arriving at Binduli Triangle, 31st July 2010.
100822_5929.jpg
100822 5929182 viewsWO type iron ore waggon WO 31257 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 144 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, Binduli Triangle 22nd August 2010.
100822_5961.jpg
100822 5961182 viewsWOE type iron ore waggon WOE 33431 is one of a batch of one hundred and forty one built by United Group Rail WA between November 2005 and April 2006 with serial number 950142-136 and fleet number 8930 for Koolyanobbing iron ore operations, Binduli Triangle 22nd August 2010.
100822_5972.jpg
100822 5972182 viewsWOB type iron ore waggon WOB 31385 is one of a batch of twenty five built by Comeng WA between 1974 and 1975 and converted from Mt Newman high sided waggons by WAGR Midland Workshops with a capacity of 67 tons with fleet number 310 for Koolyanobbing iron ore operations, Binduli Triangle, 22nd August 2010.
100822_6212.jpg
100822 6212182 viewsWOE type iron ore waggon WOE 33550 is one of a batch of one hundred and twenty eight built by United Group Rail WA between August 2008 and March 2009 with serial number 950211-090 and fleet number 9040 for Koolyanobbing iron ore operations, on empty train 1416 at Hampton, 22nd August 2010.
130703_0152.jpg
130703 0152182 viewsMurdinga, view looking north at the eight cell concrete silo complex built by SACBH with the Ascom silo visible behind and train being loaded in the siding. Geo location. 3rd July 2013.
130705_0532.jpg
130705 0532182 viewsLock, hood view of the Genesee & Wyoming decal on locomotive AE Goodwin ALCo model DL531 unit 859 'City of Port Lincoln' serial 84705, built in 1963, 859 started life at Peterborough, spent some years in Tasmania and even spent time in Perth on standard gauge in 2002 before being repainted and transferred to the Eyre Peninsula system in 2003. 5th of July 2013.
130705_0616.jpg
130705 0616182 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
130705_0626.jpg
130705 0626182 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion out along the mainline out of goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.
16913 files on 846 page(s) 767

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional