Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
231020_8181.jpg
231020 818146 viewsParkeston, QQYY type 40' container waggon QQYY 57786 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000947 with Tronox decal and CRM 001745 with Tronox decal, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
231020_8208.jpg
231020 820846 viewsParkeston, QQYY type 40' container waggon QQYY 57762 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 001306 with Tronox decal and yellow corner posts and CRM 001400 with Cristal decal and yellow corner posts, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
231020_8215.jpg
231020 821546 viewsParkeston, QQYY type 40' container waggon QQYY 57843 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000977 with Tronox decal and yellow corner posts and CRM 001456 with Tronox decal and yellow corner posts, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
231020_8216.jpg
231020 821646 viewsParkeston, QQYY type 40' container waggon QQYY 57973 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 001500 with Tronox decal and yellow corner posts and CRM 001022 with Tronox decal and yellow corner posts, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
231020_8227.jpg
231020 822746 viewsParkeston, QQYY type 40' container waggon QQYY 57891 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000856 with Tronox decal and yellow corner posts and CRM 001659 with Cristal decal and yellow corner posts, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
231020_8230.jpg
231020 823046 viewsParkeston, QQYY type 40' container waggon QQYY 57690 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000966 with Tronox decal and yellow corner posts and CRM 001716 with Tronox decal and yellow corner posts, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
251-20.jpg
251-2045 viewsNelson Point wheel lathe, BHP's General Electric built AC6000 model 6074 serial 51066 and yet to be named idles away outside the shop. 22nd April 2000.
252-13.jpg
252-1345 viewsCockatoo Siding 273 km on the Hamersley Iron line to Yandi, General Electric built 9-44CW unit 7087 with serial number 47766 from the original 1994 build idles away on the western end of the ballast train. Cab side view. Location is roughly here. 24th November 2001.
210510_1102.jpg
210510 110245 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTB 018 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
253-10.jpg
253-1045 viewsPort Hedland harbour sees the suction / cutter dredge Vlaanderen XI with IMO #7712080. The Vlaanderen XI was originally built in 1978 by IHC Dredgers with yard number 1108 and originally named New Amsterdam, named the Vlaanderen XI in 1986, renamed again in 2007 to Kaveri and again to Huta 15 in 2014.
253-19.jpg
253-1945 viewsPort Hedland harbour sees the suction / cutter dredge Vlaanderen XI with IMO #7712080. The Vlaanderen XI was originally built in 1978 by IHC Dredgers with yard number 1108 and originally named New Amsterdam, named the Vlaanderen XI in 1986, renamed again in 2007 to Kaveri and again to Huta 15 in 2014.
253-28.jpg
253-2845 viewsNelson Point hard stand, CFCLA CHRY type ballast hopper waggons, coupling of CHRY 755 and CHRY 757.
254-17.jpg
254-1745 viewsFlash Butt yard, stored Mt Newman Mining 5499 was the last active ALCo on the BHP roster. Built in November 1975 by Comeng NSW as an ALCo M636 model with serial number C6065-4. Unit was donated to Rail Heritage WA in 2001.
255-12.jpg
255-1245 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. Geodata location here. May 2002.
255-22.jpg
255-2245 viewsWestern Creek, looking south alongside the Hamersley Iron Dampier to Tom Price line on the right with the new Robe River interconnecting line on the left as both lines pass under the Robe River Cape Lambert to Deepdale line bridge. Geodata location here. May 2002.
255-29.jpg
255-2945 viewsWestern Creek at the 71 km on the Cape Lambert to Deepdale line an empty Robe River train powers upgrade behind the standard quad CM40-8M lash up led by Goninan CM40-8M unit 9425 with serial number 6266-08 / 89-85. Geodata location here. May 2002.
256-24.jpg
256-2445 viewsMaitland Siding, Robe River CM40-8M unit 9417 (2nd) leading an empty train passes sister units 9420 and 9410 on a loaded train. May 2002.
256-30.jpg
256-3045 viewsAt the 89.6 km grade crossing and with the meet at Maitland completed the loaded train continues onto Cape Lambert behind the quad CM40-8M working. May 2002.
257-14.jpg
257-1445 viewsFlash Butt yard, Locotrol I remote waggon 2065 which is modified from a Comeng ore waggon in the 1980s, Locotrol II remote waggon 661 modified from a Magor USA ore waggon in the late 1980s and Locotrol I remote waggon 2626 modified Comeng ore waggon in the 1980s. Late 2001.
245-30.jpg
245-3045 viewsMinnipa yard, looking in the up direction at the switch stand from goods siding 2 to goods siding 3 located at the down (north) end of the yard. 7th April, 2003.
16608 files on 831 page(s) 768

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional