Most viewed |

231020 8254114 viewsParkeston, QQYY type 40' container waggon QQYY 57907 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000623 with Cristal decal and CRM 000349 with Cristal decal, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
|
|

240328 2954114 viewsWOE type iron ore waggon WOE 33414 is one of a batch of one hundred and forty one built by United Group Rail WA between November 2005 and April 2006 with serial number 950142-119 and a build date of 04/2006 with a revised load of 82.5 tonnes and was fleet number 8913. It has had the sides repainted Aurizon yellow and logo just visible. Mineral Resources traffic 5040 empty Mount Walton iron ore train. March 28, 2024.
|
|

258-05114 viewsNelson Point, Goninan GE rebuild C36-7M unit 5512 serial 4839-08 / 87-076 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. May 2002.
|
|

258-16114 viewsNelson Point, old Loc Prep. Goninan GE rebuild C36-7M unit 5506 serial 4839-01 / 87-071 is waiting to be removed from site bound for Asset Kinetics in Maddington, Perth. Drivers cab side view. 5506 was rebuilt from NSW AE Goodwin built C636 ALCo number 5455 serial G6012-04 and was delivered in Mt Newman orange livery and originally named 'Mt Whaleback', after repainting into BHP blue was named 'Ethel Creek', then finally 'Mt Goldsworthy'. May 2002.
|
|

240701 2742114 viewsPilbara Railways Historical Society, passenger carriage 'Bellary' was originally built by Clyde Engineering at Granville NSW in 1936 for the NSWGR as a second class railway carriage FS type FS 2143. In 1987 it was purchased by the Society and is named after a local river. July 1, 2024.
|
|

240701 2748114 viewsPilbara Railways Historical Society, brake van 'Portland' was originally a NSWGR MHO type guards van MHO 2321, then recoded to KB type mail van, then to KBY 2513 guards van. It was built by Clyde Engineering at Granville and purchased in 1987 by the Society, it is named after a local river. July 1, 2024.
|
|

284-01114 viewsPort Hedland, Nelson Point hard stand area, BHP Billiton EMD SD40R unit 3097 serial 31569 and originally Southern Pacific SD40 SP 8409 is the final member of the SD40 units and has just been unloaded, August 7, 2004.
|
|

240328 3127114 viewsHampton Ballast Siding, Watco's 5WS4 loaded acid transfer train with 57' DQHY type flat waggon built by CRRC, China in 2022 as a batch of sixty for Watco to carry the CSA acid tanks, DQHY 13042 with CSA 0082 acid tank. March 28, 2024.
|
|

240328 3129114 viewsHampton Ballast Siding, Watco's 5WS4 loaded acid transfer train with 57' DQHY type flat waggon built by CRRC, China in 2022 as a batch of sixty for Watco to carry the CSA acid tanks, DQHY 13006 with CSA 0112 acid tank. March 28, 2024.
|
|

252-26113 viewsAbydos area, known as the China Wall or London Wall.
|
|

253-08113 viewsPort Hedland harbour sees the suction / cutter dredge Vlaanderen XI with IMO #7712080. The Vlaanderen XI was originally built in 1978 by IHC Dredgers with yard number 1108 and originally named New Amsterdam, named the Vlaanderen XI in 1986, renamed again in 2007 to Kaveri and again to Huta 15 in 2014.
|
|

253-26113 viewsNelson Point hard stand, CFCLA CHRY type ballast hopper waggon CHRY 755.
|
|

256-28113 viewsAt the 89.6 km grade crossing and with the meet at Maitland completed the loaded train continues onto Cape Lambert behind the quad CM40-8M working. May 2002.
|
|

256-37113 viewsAt the 89.6 km grade crossing the loaded Robe River waggons across the crossing. May 2002.
|
|

257-11113 viewsFlash Butt yard, Locotrol II remote waggon 661 which is modified from a Magor USA ore waggon in the late 1980s. Late 2001.
|
|

257-29113 viewsGoldsworthy Junction looking north as an empty train approaches, the line curving in from the right in the Goldsworthy or Yarrie line. The dual searchlight signal is GJ 9 and is so positioned to allow approaching trains to see the junction signal, like a repeater. Late 2001.
|
|

190129 4241113 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00005 built by CSR Yangtze Co China serial 2014/382-5 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190129 4247113 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00029 built by CSR Yangtze Co China serial 2014/382-29 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190129 4255113 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00360 built by CSR Yangtze Co China serial 2014/382-360 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190129 4290113 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00137 built by CSR Yangtze Co China serial 2014/382-137 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
16911 files on 846 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
773 |  |
 |
 |
 |
 |
 |
 |
|