Most viewed |

100822 5944333 viewsWO type iron ore waggon WO 31296 is one of a batch of fifteen built by WAGR Midland Workshops between July and October 1968 with fleet number 175 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, Binduli Triangle 22nd August 2010. This unit was converted to WOC for coal in 1986 till 1994 when it was re-classed back to WO.
|
|

130703 0154333 viewsMurdinga, rear view of the three locomotives, 859 'City of Port Lincoln', 906 and 1203 on the lead. Geo location. 3rd July 2013.
|
|

100609 09965333 viewsMidland, APNY 31151 one of twelve built by WAGR Midland Workshops in 1974 as WNA type pneumatic discharge nickel concentrate waggon, WAGR built and owned copies of the AE Goodwin built WN waggons for WMC.
|
|

100731 3236333 viewsBinduli, AQHY 30053 with sulphuric acid tank CSA 0039, originally built by the WAGR Midland Workshops in 1964/66 at WF type flat waggons, then following several codes and modifications in 1997 seventy five were converted to WQH to carry CSA sulphuric acid tanks between Hampton/Kalgoorlie and Perth/Kwinana.
|
|

234-35333 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View looking across the YT315.8 km grade crossing and 5658 back to the ore stockpile at the loadout. Circa 1998.
|
|

070607 10040333 viewsMidland, Pacific National RZBY type crew accommodation car RZBY 911 on train 2SP5, built by Comeng NSW as ER type stainless steel air conditioned crew dormitory car ER 211 in 1969, renumbered to ER 911 in 1974, sold to National Rail and converted to crew car in 1997.
|
|

050518 2116333 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 746, rear view.
|
|

060501 3872333 viewsTabba Siding, built by Difco USA in 1971 for Mt Newman Mining in a group of four, the last 'long' side dump waggon 704.
|
|

130720 1448333 viewsFlash Butt yard, CNR-QRRS of China built 99 tonne ballast waggon 0214 loaded awaiting their next duty.
|
|

150523 8207333 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0031, class leader of a second batch delivered in 2015 with safety slogan 'Safety - It's your life'.
|
|

100329 8041333 viewsRio Tinto compressor waggon set CB 05, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers closet to camera. Note the waggons are cut down ore waggons and the wheels are marked 70 kph max. Seen here just outside of 7 Mile. 29th March 2010.
|
|

249-14333 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

252-14333 viewsCockatoo Siding 273 km on the Hamersley Iron line to Yandi, General Electric built 9-44CW unit 7087 with serial number 47766 from the original 1994 build idles away on the western end of the ballast train as it is loaded and slowly progresses into the back track siding Ballast plough BP 01 is behind the locomotive. Location is roughly here. 24th November 2001.
|
|

210322 9585333 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is CRRC Yangtze Rolling Stock Co of China built ballast plough waggon BP 04 on a loaded ballast rake, view of A end. Location is roughly here. 22nd March 2021.
|
|

253-30333 viewsNelson Point hard stand, CFCLA CHRY type ballast hopper waggon CHRY 746.
|
|

256-13333 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|

257-12333 viewsFlash Butt yard, Locotrol I remote waggon 2065 which is modified from a Comeng ore waggon in the 1980s. Late 2001.
|
|

140601 4476333 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHCH type waggon CHCH 7635 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. 1st June 2014.
|
|

140601 4629333 viewsMidland, loaded iron ore train #1030 heading to Kwinana, CFCLA leased CHEY type waggon CHEY 8022 one pair of 120 bar coupled pairs built by Bluebird Rail Operations SA in 2011-12. 1st June 2014.
|
|

269-02333 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
|
|
| 19096 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
784 |  |
 |
 |
 |
 |
 |
 |
|