Most viewed |

240328 2830371 viewsWOE type iron ore waggon WOE 33705 is from a batch of two hundred and twenty seven built by UGL Rail WA between from 08-2011 and 02-2012 of the current style of 82.5 tonne load capacity WOE class waggons with fleet number 7116, in Mineral Resources traffic 5040 empty Mount Walton iron ore train. March 28, 2024.
|
|

240328 3123371 viewsHampton Ballast Siding, Watco's 5WS4 loaded acid transfer train with 57' DQHY type flat waggon built by CRRC, China in 2022 as a batch of sixty for Watco to carry the CSA acid tanks, DQHY 13001 with CSA 0087 acid tank. March 28, 2024.
|
|

240328 3125371 viewsHampton Ballast Siding, Watco's 5WS4 loaded acid transfer train with 57' DQHY type flat waggon built by CRRC, China in 2022 as a batch of sixty for Watco to carry the CSA acid tanks, DQHY 13012 with CSA-0130 acid tank. March 28, 2024.
|
|

100731 03077370 viewsWO type iron ore waggon WO 31219 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 114 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, empty train arriving at Binduli Triangle, 31st July 2010. This unit was converted to WOS superphosphate in the late 1980s till 1994 when it was re-classed back to WO.
|
|

100731 03159370 viewsWOE type iron ore waggon WOE 33556 is one of a batch of one hundred and twenty eight built by United Group Rail WA between August 2008 and March 2009 with serial number 950211-096 and fleet number 9049 for Koolyanobbing iron ore operations, empty train arriving at Binduli Triangle, 31st July 2010.
|
|

130703 0207370 viewsNowhere Else,
|
|

130704 0408370 viewsKyancutta, south bound loaded grain train has stopped here to collect a loaded rack of grain waggons, the second driver has just restored the points for the mainline as the train waits across the Eyre Highway grade crossing and one of only three electric signals on the network, behind EMD 1204 and twin ALCo 830 units 873 and 851. 4th July 2013.
|
|

233-20370 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

243-26370 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
|
|

243-28370 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
|
|

249-10370 viewsYule River bridge south abutment showing the chainage of the railway line. Approximate location.
|
|

249-14370 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

210510 1097370 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km the Rio Tinto's Gemco Rail built rail train consist rounds the curve as it heads to the 84 km. 10th May 2021. Location.
|
|

253-22370 viewsNelson Point hard stand, CFCLA CHRY type ballast hopper waggon CHRY 753.
|
|

254-21370 viewsBing Siding, an empty train awaits departure time behind 6071 an General Electric built AC6000 model with serial number 51063. The locomotive has not yet been named. Second unit is Goninan rebuilt CM40-8MEFI locomotive 5668. September 2001.
|
|

256-15370 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.
|
|

190129 4235370 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00100 built by CSR Yangtze Co China serial 2014/382-100 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190129 4285370 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00158 built by CSR Yangtze Co China serial 2014/382-158 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190129 4303370 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00263 built by CSR Yangtze Co China serial 2014/382-263 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

190129 4325370 viewsBinduli, on Mineral Resources Ltd loaded iron ore train service from Koolyanobbing to Esperance #3033 with MRL's MHPY type iron ore waggon MHPY 00327 built by CSR Yangtze Co China serial 2014/382-327 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
| 19260 files on 963 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
796 |  |
 |
 |
 |
 |
 |
 |
|