Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images. **Note - Due to recent changes to make the gallery mobile friendly, please click the image for full size picture.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
250501_0306.jpg
250501 0306365 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2985 - GA 2986, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0361.jpg
250501 0361365 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3101 - GA 3102, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0455.jpg
250501 0455365 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2675 - GA 2676, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
100731_02911.jpg
100731 02911364 viewsWOE type iron ore waggon WOE 31080 is one of a batch of one hundred and thirty built by Goninan WA between March and August 2001 with serial number 950092-070 and fleet number 665 for Koolyanobbing iron ore operations, on loaded train 7415 at Binduli Triangle, 31st July 2010.
100822_5867.jpg
100822 5867364 viewsWOE type iron ore waggon WOE 33404 is one of a batch of one hundred and forty one built by United Group Rail WA between November 2005 and April 2006 with serial number 950142-109 and fleet number 8903 for Koolyanobbing iron ore operations, Binduli Triangle 22nd August 2010.
130705_0571.jpg
130705 0571364 viewsLock, HAN type bogie grain hopper waggon HAN 28, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system. 5th July 2013.
233-17.jpg
233-17364 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
243-33.jpg
243-33364 viewsNelson Point departure yard, no. 2 end view of BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan WA in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
253-09.jpg
253-09364 viewsPort Hedland harbour sees the suction / cutter dredge Vlaanderen XI with IMO #7712080. The Vlaanderen XI was originally built in 1978 by IHC Dredgers with yard number 1108 and originally named New Amsterdam, named the Vlaanderen XI in 1986, renamed again in 2007 to Kaveri and again to Huta 15 in 2014.
255-18.jpg
255-18364 viewsAt the 162.2 km a Robe River Pettibone 445-E Speed Swing high rail crane. CRD 238.
256-18.jpg
256-18364 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.
257-22.jpg
257-22364 viewsFlash Butt yard, the Barclay Mowlem ballast cleaning train known as the Circus Train, waggons BW-02 and DW-01 closest to camera. Late 2001.
190107_0676.jpg
190107 0676364 viewsKalgoorlie, WN type pneumatic discharge nickel concentrate waggon WN 509, one of thirty built by AE Goodwin NSW as WN type in 1970 for WMC.
160409_IMG_7104.jpg
160409 IMG 7104364 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
160409_IMG_7260.jpg
160409 IMG 7260364 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
160412_IMG_7332.jpg
160412 IMG 7332364 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
160412_IMG_7457.jpg
160412 IMG 7457364 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
231020_8281.jpg
231020 8281364 viewsBinduli, 5029 Malcolm Freighter, AQNY type container waggon AQNY 32154 one of sixty two waggons built by Goninan WA in 1998 as WQN type for Murrin Murrin container traffic with a two Bis Industries hard-top 25U0 type sulphur container BISU 100108 and undecorated BISU 100037.
231020_8217.jpg
231020 8217364 viewsParkeston, QQYY type 40' container waggon QQYY 57911 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000830 with Tronox decal and yellow corner posts and CRM 000039 with Tronox decal and yellow corner posts, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
240328_2824.jpg
240328 2824364 viewsWOE type iron ore waggon WOE 33681 is from a batch of two hundred and twenty seven built by UGL Rail WA between from 08-2011 and 02-2012 of the current style of 82.5 tonne load capacity WOE class waggons with fleet number 7092, in Mineral Resources traffic 5040 empty Mount Walton iron ore train. March 28, 2024.
19260 files on 963 page(s) 806

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional