Most viewed |

250501 0343343 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2923 - GA 2924, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0354343 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3153 - GA 3154, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0481343 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3359 - GA 3360, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
|
|

250501 0492343 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2095 - GA 2096, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

210510 1139342 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTW 014 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

150326 IMG 4338342 viewsWest Kalgoorlie, AZAY type waste oil waggon AZAY 23439, detail image, this waggon usually operates between Merredin Loco and Forrestfield, not normally seen here in the Goldfields. Peter Donaghy image.
|
|

190109 1700342 viewsBinduli, empty fuel train 4445, ATPF type fuel tank waggon ATPF 578, originally built by WAGR Midland Workshops in 1974 for Shell as type WJP 80.66 kL one compartment one dome, it also spent time in SA in 1985. Capacity now 80,350 litres, fitted with type F InterLock couplers. Under Viva Energy ownership.
|
|

160409 IMG 7051342 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

160409 IMG 7081342 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

160412 IMG 7333342 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

160412 IMG 7414342 viewsParkeston, Aurizon rail grinder MMY type MMY 034, built in the USA by Loram as RG331 ~2004, imported into Australia by Queensland Rail, now Aurizon, in April 2009, detail picture. Peter Donaghy image.
|
|

240328 2856342 viewsWOE type iron ore waggon WOE 33792 is from a batch of two hundred and twenty seven built by UGL Rail WA between from 08-2011 and 02-2012 of the current style of 82.5 tonne load capacity WOE class waggons and fleet number 7203, in Mineral Resources traffic 5040 empty Mount Walton iron ore train. March 28, 2024.
|
|

240328 2863342 viewsWOE type iron ore waggon WOE 33747 is from a batch of two hundred and twenty seven built by UGL Rail WA between from 08-2011 and 02-2012 of the current style of 82.5 tonne load capacity WOE class waggons and had fleet number 7158 before the Aurizon yellow sides and logos, in Mineral Resources traffic 5040 empty Mount Walton iron ore train. March 28, 2024.
|
|

240328 3023342 viewsLoaded Koolyanobbing iron ore train 5041 with Mineral Resources Ltd MHPY type iron ore waggons MHPY 00285 and MHPY 00286 built by CSR Yangtze Co China with serial numbers 2014 / 382-285 and 2014 / 382-286 in 2014 as a batch of 382 pairs, these bottom discharge hopper waggons are operated in 'married' pairs. March 28, 2024.
|
|

258-03342 viewsNelson Point, Goninan GE rebuild C36-7M unit 5512 serial 4839-01 / 88-077 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. May 2002.
|
|

258-33342 viewsNelson Point, Wheel Lathe shop with Ore Car Repair Shop and Yard Control behind it. General Electric built AC6000 locomotive 6074 'Kalgan' is out the front. Early May 2002.
|
|

250501 0336342 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3275 - GA 3276, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
|
|

250501 0458342 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2769 - GA 2770, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0487342 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3147 - GA 3148, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

250501 0505342 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3547 - GA 3548, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025
|
|
| 19260 files on 963 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
831 |  |
 |
 |
 |
 |
 |
 |
|