Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
250501_0535.jpg
250501 05353 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 3363 - GA 3364, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025
250501_0549.jpg
250501 05493 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2497 - GA 2498, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0554.jpg
250501 05543 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2931 - GA 2932, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
150314_7767.jpg
150314 77673 viewsWedgefield, following the delivery of Roy Hill's 1196 new GA type CCK138 model waggons, they were stored in several site whilst awaiting for enough track to be laid to allow delivery onto rail. GA2077 end view showing fixed end, only the even numbered waggons, or control waggon, has an uncoupling lever, the odd numbered, or slave waggons do not. March 14. 2015.
081225_0576.jpg
081225 05763 viewsBarker Siding, view of two of FMG's ballast waggons F type couplings, electric and air connections with the separate air connection for unloading installed. 100 tonne capacity, built in China by CSR at the Yangtze Rolling Stock Company in 2008. December 25, 2008.
250501_0306.jpg
250501 03062 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2985 - GA 2986, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0310.jpg
250501 03102 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2395 - GA 2396, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0311.jpg
250501 03112 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2025 - GA 2026, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0312.jpg
250501 03122 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2141 - GA 2142, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0314.jpg
250501 03142 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3181 - GA 3182, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0320.jpg
250501 03202 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3129 - GA 3130, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0326.jpg
250501 03262 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3281 - GA 3282, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0327.jpg
250501 03272 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2971 - GA 2972, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0328.jpg
250501 03282 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3309 - GA 3310, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0329.jpg
250501 03292 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2207 - GA 2208, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0337.jpg
250501 03372 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3051 - GA 3052, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0338.jpg
250501 03382 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2165 - GA 2166, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0343.jpg
250501 03432 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2923 - GA 2924, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0345.jpg
250501 03452 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3407 - GA 3408, built in China by CSR Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0348.jpg
250501 03482 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2995 - GA 2996, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
16850 files on 843 page(s) 835

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional