Most viewed |

1141 160727 095890 viewsRobe River ore waggon 1141, built by Bradken Rail Qld in April 2012, rotary coupler end handbrake side empty partial view at Harding Siding on the Cape Lambert line, July 27, 2016.
|
|

1182 170728 0991790 viewsRobe River ore waggon 1182, built by Bradken Rail Qld in April 2012, non-handbrake side loaded view at the 72 km, Western Creek on the Deepdale line. July 28, 2017.
|
|

1203 160306 162490 viewsRobe River ore waggon 1203, built by Bradken Rail Qld in May 2012, fixed coupler non-handbrake side loaded view, at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
|
|

0425 180616 167490 viewsRobe River ore waggon 425, built by Tomlinson Steel WA, fixed coupler non-handbrake side loaded view at the 33.7 km, Arches on the Cape Lambert line, June 16, 2018.
|
|

1101 210322 974590 viewsRobe River ore waggon 1101, built by Bradken Rail Qld in April 2012, rotary coupler end non-handbrake side loaded view, at the 17 km on the Cape Lambert line, March 22, 2021.
|
|

IC21-CB07 240619 031890 viewsRobe River compressor waggon CB07 was originally IC 21 with two Kaeser air compressors. These waggons were ballasted to 100 tonnes each and are modified ore waggons and used for CD2 DUMPING ONLY. Cape Lambert yard June 19, 2024.
|
|

240619 037990 viewsCape Lambert yard, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31455 is a master and is bar coupled to slave waggon 36455 built by China Northen as a Q type in 12/2022. Captured on June 19, 2024.
|
|

240619 043090 viewsCape Lambert yard, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31461 is a master and is bar coupled to slave waggon 36461 built by China Northen as a Q type in 12/2022. Captured on June 19, 2024.
|
|

240701 238590 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31689 is a master and is bar coupled to slave waggon 36689 built by China Northen as a Q type in 11/2022. Captured on July 1, 2024.
|
|

240701 239990 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31635 is a master and is bar coupled to slave waggon 36635 built by China Northen as a Q type in 11/2022. Captured on July 1, 2024.
|
|

240701 248590 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31558 is a master and is bar coupled to slave waggon 36558 built by China Northen as a Q type in 12/2022. Captured on July 1, 2024.
|
|

0003 081209 011089 viewsRobe River ore waggon 003, built by Nippon Sharyo Nihon, non-handbrake side loaded view at the 7 km location just south of Cape Lambert yard. December 9, 2008.
|
|

0003 110602 162989 viewsRobe River ore waggon 003, built by Nippon Sharyo Nihon, rotary coupler end handbrake side loaded view at the 71 km, Western Creek on the Deepdale line. June 2, 2011.
|
|

0004 170513 872489 viewsRobe River ore waggon 004, built by Nippon Sharyo Nihon, handbrake side loaded view, Cape Lambert yard, May 13, 2017.
|
|

0021 160306 166489 viewsRobe River ore waggon 021, built by Nippon Sharyo Nihon, fixed coupler non-handbrake side loaded view at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
|
|

0021 170729 024189 viewsRobe River ore waggon 021, built by Nippon Sharyo Nihon, fixed coupler handbrake side loaded view at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
|
|

0030 141124 686489 viewsRobe River ore waggon 030, built by Nippon Sharyo Nihon, fixed coupler handbrake side empty view at the 25 km at Arches Siding on the Cape Lambert line. November 24, 2014.
|
|

0031 110602 172189 viewsRobe River ore waggon 031, built by Nippon Sharyo Nihon, rotary coupler end handbrake side loaded view at the 71 km, Western Creek on the Deepdale line. June 2, 2011.
|
|

0037 160306 127789 viewsRobe River ore waggon 037, built by Centurion Industries WA, fixed coupler non-handbrake side empty view with 'drop rib' and Centurion Industries waybill holder, suspected replacement built body, at Greenpool on the Cape Lambert line. March 6, 2016.
|
|

0083 170729 026889 viewsRobe River ore waggon 083, built by Nippon Sharyo Nihon, fixed coupler handbrake side loaded view shows Centurion Industries style end with drop rib, at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
|
|
| 19085 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
871 |  |
 |
 |
 |
 |
 |
 |
|