Most viewed |

1001 160727 097987 viewsRobe River ore waggon 1001, built by Bradken Rail Qld in December 2005, rotary coupler end handbrake side empty view at Harding Siding on the Cape Lambert line, July 27, 2016.
|
|

1014 170513 873887 viewsRobe River ore waggon 1014, built by Bradken Rail Qld in December 2005, handbrake side loaded view, Cape Lambert yard, May 13, 2017.
|
|

1034 160306 129587 viewsRobe River ore waggon 1034, built by Bradken Rail Qld in September 2008, fixed coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.
|
|

1078 160727 095587 viewsRobe River ore waggon 1078, built by Bradken Rail Qld in March 2012, rotary coupler end handbrake side empty view at Harding Siding on the Cape Lambert line, July 27, 2016.
|
|

1109 160306 133687 viewsRobe River ore waggon 1109, built by Bradken Rail Qld in April 2012, fixed coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.
|
|

IC22 060722 763787 viewsRobe River compressor waggon set IC 22 with air receiver and IC 23 with two Ingersoll Rand air compressors. These waggons are ballasted to 100 tonnes each and are modified ore waggons and used on the pooled fleet rakes that come from HIY [Yandicoogina] and West Angelas mines. Cape Lambert, July 22, 2006.
|
|

0040 210322 938887 viewsRobe River ore waggon 040, built by Nippon Sharyo Nihon, fixed coupler non-handbrake side loaded view at Cape Lambert yard, waggon has been completely resheeted, March 22, 2021.
|
|

1053 180616 185487 viewsRobe River ore waggon 1053, built by Bradken Rail Qld, fixed coupler handbrake side loaded view at Maitland Siding on the Deepdale line, June 16, 2018.
|
|

1114 180616 164087 viewsRobe River ore waggon 1114, built by Bradken Rail Qld in April 2012, fixed coupler non-handbrake side loaded view at the 38.5 km, Harding on the Cape Lambert line, June 16, 2018.
|
|

1177 210322 976187 viewsRobe River ore waggon 1177, built by Bradken Rail Qld in May 2012, rotary coupler end non-handbrake side loaded view, at the 17 km on the Cape Lambert line, March 22, 2021
|
|

1191 180616 170287 viewsRobe River ore waggon 1191, built by Bradken Rail Qld in April 2012, rotary coupler end non-handbrake side empty view, at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
|
|

1208 180616 164187 viewsRobe River ore waggon 1208, built by Bradken Rail Qld in May 2012, fixed coupler non-handbrake side loaded view at the 38.5 km, Harding on the Cape Lambert line, June 16, 2018.
|
|

IC20-CB07 240619 032087 viewsRobe River compressor waggon CB07 was originally IC 20 with air receiver. These waggons were ballasted to 100 tonnes each and are modified ore waggons and used for CD2 DUMPING ONLY. Cape Lambert yard June 19, 2024.
|
|

240619 036687 viewsCape Lambert yard, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31548 is a master and is bar coupled to slave waggon 36548 built by China Northen as a Q type in 12/2022. Captured on June 19, 2024.
|
|

240701 246187 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31658 is a master and is bar coupled to slave waggon 36658 built by China Northen as a Q type in 11/2022. Captured on July 1, 2024.
|
|

240701 250187 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31590 is a master and is bar coupled to slave waggon 36590 built by China Northen as a Q type in 11/2022. Captured on July 1, 2024.
|
|

0009 160727 098786 viewsRobe River ore waggon 009, built by Nippon Sharyo Nihon, rotary coupler end handbrake side empty view at Harding Siding on the Cape Lambert line, July 27, 2016.
|
|

0064 160306 154886 viewsRobe River ore waggon 064, built by Nippon Sharyo Nihon, fixed coupler non-handbrake side loaded view at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
|
|

0102 160306 153586 viewsRobe River ore waggon 102, shows rear drop rib which is a feature of the Centurion Industries WA builds, fixed coupler non-handbrake side loaded view at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
|
|

0154 170513 875786 viewsRobe River ore waggon 154, built by Centurion Industries WA as a replacement, plate marking is visible, handbrake side loaded view, Cape Lambert yard, May 13, 2017.
|
|
| 19085 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
878 |  |
 |
 |
 |
 |
 |
 |
|