Most viewed |

030405 140050444 viewsKyancutta, yard view looking south along the narrow gauge mainline with the Eyre Highway grade crossing in the distance and one of only two electrically lit signals on the Eyre Peninsula Division. 5th April 2003.
|
|

030406 082337444 viewsMurdinga, yard overview looking south down the mainline from the north end, points and point lever and indicator with Pope Searle, grain siding and silo complex with out-loading spout on gantry over both tracks. 6th April 2003.
|
|

030409 083158444 viewsKyancutta, station located at the 203.1 km and originally opened in March 1916, yard overview looking north, grain loop, mainline and goods / grain loop, Ascom silo complex on the left and SACBH concrete silo complex on the right.
|
|

151111 9478444 viewsCape Lambert Yard, Hamersley Iron 7074, a General Electric built Dash Dash 9-44CW serial 47753 from the original order in November 1994.
|
|

160128 00882444 viewsWedgefield, Sims Metal Yard, view looking at the inside of the cab front wall and the ALCo Hi-Ad bogie shows the external coil secondary suspension.
|
|

190911 4754444 viewsPort Hedland, Broome Rd crossing, BHP's MM 800 track recording vehicle powers south on a recording run, the MM 800 was built by Mermec in Italy and is a ROGER 800 model, ROGER is an acronym for Rilievo Ottico Geometria Rotaia, Italian for optical rail geometry control.
|
|

118-23443 viewsCobram, V/Line broad gauge BRS class bogie passenger carriage BRS 226 with combined sitting accommodation and a mini refreshment service or snack bar, part of Z set Z 56. Originally built in November 1937 as #6 Second Class sitting carriage for the Spirit of Progress, in August 1939 is was coded BS type BS 1, in July 1977 was one of two converted to MRS type mini refreshment service MRS 2, then in April 1984 converted to BRS.
|
|

129-1-15443 viewsLyndhurst, station overview, V/Line VPCX type bogie cement waggons in rakes, platform on RHS, looking towards Melbourne, Blue Circle Cement plant in the background. Location is Geo Data.
|
|

196-10443 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C number 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
|
|

198-16443 viewsPort Hedland Port, view of the Cargill Salt berth and loader, or PHPA Berth No. 3, in this 2001 view, the then new bulker loader is under construction and manganese is stockpiled on the ground. The BHP Finucane Island berth is visible along with the overland conveyor for the HBI plant.
|
|

207-04443 viewsBHP General Electric built AC6000 unit 6074 serial 51066, brand new and unnamed at Yandi One load-out loop as a remote mid-train unit.
|
|

207-08443 viewsBHP General Electric built AC6000 unit 6074 serial 51066, brand new and unnamed at Yandi One load-out loop as a remote mid-train unit.
|
|

218-15443 viewsDe Grey River Bridge, a loaded GML train with the original AE Goodwin designed and Tomlinson Steel Perth and Scotts of Ipswich built waggons.
|
|

219-02443 viewsYandicoogina or HIY as Hamersley Iron identify it, located 445 km from Parker Point yard in Dampier. Bank engine units General Electric Dash 9-44CW models 7089 serial 47768 and 7090 wait their next loaded train to push out, the tail of which is visible on the left with the mine stockpile in the background.
|
|

060108 2053443 viewsLock, builders plate of ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, final of fourteen originally built between 1960-65 for WAGR as their A class A 1514, fitted with dynamic brakes and financed by Western Mining Corporation, started on the Eyre Peninsula in August 2004.
|
|

150505 7953443 viewsFMG Solomon Line, looking west with cutting to the right, 227.5 km grade crossing in the distance, track is curving away to the left in the background. Geodata: -22.0200283 118.5880600 .
|
|

160522 2024443 viewsParkeston, 5MP2 steel train, RKAF type 2-pack rail transport waggon RKAF 4 with a length of 29.8 metres loaded with new rail, these 'pairs' are rebuilt from a pair of RKJX type waggons. The RKJX were rebuilds from V/Line VOBX type waggons.
|
|

160522 2191443 viewsParkeston, SCT train 6MP9 operating from Melbourne to Perth arrives on the mainline behind EDI Downer built EMD model GT46C-ACe unit SCT 010 serial 97-1734 with 76 waggons for 5382 tonnes and 1800 metres length.
|
|

244-02443 viewsPort Augusta yard, a pair of ALF class units on the Darwin line construction shunt a rail transport waggon as an SP service wait for departure time with a pair of NR class units. ALF 20 and ALF 18 are both Morrison Knudsen rebuilds, model JT26C-2M serials 94-AN-020 and 94-AN-018.
|
|

162-3-11442 viewsMelbourne Yard, No.10 Goods Shed, PTC Open Day, V/Line broad gauge VHDX type bogie dolomite waggon VHDX 203 built new as a JDX type bogie dolomite hopper at Newport Workshops in 05-1974.
|
|
19085 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
90 |  |
 |
 |
 |
 |
 |
 |
|