Most viewed |

0937 210322 9771263 viewsRobe River ore waggon 937, built by Centurion Industries WA, rotary coupler end non-handbrake side loaded view at the 17 km on the Cape Lambert line, March 22, 2021.
|
|

1177 210322 9761263 viewsRobe River ore waggon 1177, built by Bradken Rail Qld in May 2012, rotary coupler end non-handbrake side loaded view, at the 17 km on the Cape Lambert line, March 22, 2021
|
|

240619 0346263 viewsCape Lambert yard, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31454 is a master and is bar coupled to slave waggon 36454 built by China Northen as a Q type in 12/2022. Captured on June 19, 2024.
|
|

240619 0371263 viewsCape Lambert yard, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31563 is a master and is bar coupled to slave waggon 36563 built by China Northen as a Q type in 12/2022. Captured on June 19, 2024.
|
|

240619 0380263 viewsCape Lambert yard, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31508 is a master and is bar coupled to slave waggon 36508 built by China Northen as a Q type in 12/2022. Captured on June 19, 2024.
|
|

240619 0383263 viewsCape Lambert yard, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31495 is a master and is bar coupled to slave waggon 36495 built by China Northen as a Q type in 12/2022. Captured on June 19, 2024.
|
|

240619 0402263 viewsCape Lambert yard, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31588 is a master and is bar coupled to slave waggon 36588 built by China Northen as a Q type in 11/2022. Captured on June 19, 2024.
|
|

240619 0417263 viewsCape Lambert yard, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31504 is a master and is bar coupled to slave waggon 36504 built by China Northen as a Q type in 12/2022. Captured on June 19, 2024.
|
|

240701 2493263 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31538 is a master and is bar coupled to slave waggon 36538 built by China Northen as a Q type in 12/2022. Captured on July 1, 2024.
|
|

240701 2498263 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31618 is a master and is bar coupled to slave waggon 36618 built by China Northen as a Q type in 11/2022. Captured on July 1, 2024.
|
|

w r251114 4405263 viewsBHP's Battery Electric Locomotive 9001 class leader, a brand new Wabtec built FLXdrive™ battery electric locomotive, or BEL, sits in the Gobi hard stand area of Pilbara Ports Authority as it awaits delivery to site.
The BEL's, 9001 and 9002 were built by Wabtec at their Erie, Pennsylvania, USA plant and are designated as model FXH70C. Both locos were shipped on the BBC St Petersburg and road transport is provided by Tutt Bryant.
9001 has serial number 66453 and a built date of Dec 2023.
November 14, 2025.
|
|

100611 0526262 viewsMidland, Pacific National RZBY type crew accommodation car RZBY 208 on train 4PM6, built by Comeng NSW as ER type stainless steel air conditioned crew dormitory car ER 208 in 1969, sold to National Rail and converted to crew car in 1997.
|
|

0027 160306 1297262 viewsRobe River ore waggon 027, built by Nippon Sharyo Nihon, fixed coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.
|
|

0027 160727 0985262 viewsRobe River ore waggon 027, built by Nippon Sharyo Nihon, rotary coupler end handbrake side empty view at Harding Siding on the Cape Lambert line, July 27, 2016.
|
|

0063 060722 7586262 viewsRobe River ore waggon 063, built by Nippon Sharyo Nihon, rotary coupler end handbrake side empty view at the 11.7 km, Cape Lambert. July 22, 2006.
|
|

0091 160306 1554262 viewsRobe River ore waggon 091, built by Nippon Sharyo Nihon, fixed coupler non-handbrake side loaded view at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
|
|

0102 160306 1535262 viewsRobe River ore waggon 102, shows rear drop rib which is a feature of the Centurion Industries WA builds, fixed coupler non-handbrake side loaded view at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
|
|

0141 060722 7617262 viewsRobe River ore waggon 141, built by Nippon Sharyo Nihon, rotary coupler end handbrake side empty view, at the 11.7 km, Cape Lambert. July 22, 2006.
|
|

0167 170729 0214262 viewsRobe River ore waggon 167, built by Nippon Sharyo Nihon, fixed coupler handbrake side loaded view at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
|
|

0190 160306 1347262 viewsRobe River ore waggon 190, built by Nippon Sharyo Nihon, fixed coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.
|
|
| 19447 files on 973 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
928 |  |
 |
 |
 |
 |
 |
 |
|