Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
1050_180616_1855.jpg
1050 180616 18552 viewsRobe River ore waggon 1050, built by Bradken Rail Qld, fixed coupler handbrake side loaded view at Maitland Siding on the Deepdale line, June 16, 2018.
1066_210322_9793.jpg
1066 210322 97932 viewsRobe River ore waggon 1066, built by Bradken Rail Qld in March 2012, rotary coupler end non-handbrake side loaded view, at the 17 km on the Cape Lambert line, March 22, 2021.
1071_210322_9774.jpg
1071 210322 97742 viewsRobe River ore waggon 1071, built by Bradken Rail Qld in April 2012, rotary coupler end non-handbrake side loaded view, at the 17 km on the Cape Lambert line, March 22, 2021.
1072_180616_1708.jpg
1072 180616 17082 viewsRobe River ore waggon 1072, built by Bradken Rail Qld in April 2012, rotary coupler end non-handbrake side empty view, at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
1079_180616_1706.jpg
1079 180616 17062 viewsRobe River ore waggon 1079, built by Bradken Rail Qld in May 2012, rotary coupler end non-handbrake side empty view, at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
1105_180616_1735.jpg
1105 180616 17352 viewsRobe River ore waggon 1105, built by Bradken Rail Qld in May 2012, rotary coupler end non-handbrake side empty view, at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
1105_210322_9723.jpg
1105 210322 97232 viewsRobe River ore waggon 1105, built by Bradken Rail Qld in May 2012, rotary coupler end non-handbrake side loaded view, at the 17 km on the Cape Lambert line, March 22, 2021.
1116_180616_1732.jpg
1116 180616 17322 viewsRobe River ore waggon 1116, built by Bradken Rail Qld in March 2012, rotary coupler end non-handbrake side empty view, at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
1132_180616_1692.jpg
1132 180616 16922 viewsRobe River ore waggon 1132, built by Bradken Rail Qld in March 2012, rotary coupler end non-handbrake side empty view, at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
1147_210322_9739.jpg
1147 210322 97392 viewsRobe River ore waggon 1147, built by Bradken Rail Qld in May 2012, rotary coupler end non-handbrake side loaded view, at the 17 km on the Cape Lambert line, March 22, 2021
1153_180616_1695.jpg
1153 180616 16952 viewsRobe River ore waggon 1153, built by Bradken Rail Qld in May 2012, rotary coupler end non-handbrake side empty view, at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
1153_210322_9710.jpg
1153 210322 97102 viewsRobe River ore waggon 1153, built by Bradken Rail Qld in May 2012, rotary coupler end non-handbrake side loaded view, at the 17 km on the Cape Lambert line, March 22, 2021
1158_210322_9731.jpg
1158 210322 97312 viewsRobe River ore waggon 1158, built by Bradken Rail Qld in May 2012, rotary coupler end non-handbrake side loaded view, at the 17 km on the Cape Lambert line, March 22, 2021
1166_180616_1729.jpg
1166 180616 17292 viewsRobe River ore waggon 1166, built by Bradken Rail Qld in April 2012, rotary coupler end non-handbrake side empty view, at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
1177_210322_9761.jpg
1177 210322 97612 viewsRobe River ore waggon 1177, built by Bradken Rail Qld in May 2012, rotary coupler end non-handbrake side loaded view, at the 17 km on the Cape Lambert line, March 22, 2021
1179_210322_9698.jpg
1179 210322 96982 viewsRobe River ore waggon 1179, built by Bradken Rail Qld in March 2012, rotary coupler end non-handbrake side loaded view, at the 17 km on the Cape Lambert line, March 22, 2021
1206_180616_1692.jpg
1206 180616 16922 viewsRobe River ore waggon 1206, built by Bradken Rail Qld in May 2012, rotary coupler end non-handbrake side empty view, at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
1211_210322_9737.jpg
1211 210322 97372 viewsRobe River ore waggon 1211, built by Bradken Rail Qld in May 2012, rotary coupler end non-handbrake side loaded view, at the 17 km on the Cape Lambert line, March 22, 2021.
IC22-CB08_210510_0921.jpg
IC22-CB08 210510 09212 viewsRobe River compressor waggon set CB08, was originally IC 22 with air receiver, these waggons were ballasted to 100 tonnes each and are modified ore waggons. Cape Lambert yard May 10, 2021.
IC23-CB08_210510_0922.jpg
IC23-CB08 210510 09222 viewsRobe River compressor waggon set CB08, was originally IC 23 with two Kaesir air compressors. These waggons were ballasted to 100 tonnes each and are modified ore waggons. Cape Lambert yard May 10, 2021.
18585 files on 930 page(s) 928

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional