Most viewed |

IC20-CB07 240619 03205 viewsRobe River compressor waggon CB07 was originally IC 20 with air receiver. These waggons were ballasted to 100 tonnes each and are modified ore waggons and used for CD2 DUMPING ONLY. Cape Lambert yard June 19, 2024.
|
|

IC20-CB07 240619 03235 viewsRobe River compressor waggon CB07 was originally IC 20 with air receiver and IC 21 with two Kaeser air compressors. These waggons were ballasted to 100 tonnes each and are modified ore waggons and used for CD2 DUMPING ONLY. Cape Lambert yard June 19, 2024.
|
|

IC21-CB07 240619 03185 viewsRobe River compressor waggon CB07 was originally IC 21 with two Kaeser air compressors. These waggons were ballasted to 100 tonnes each and are modified ore waggons and used for CD2 DUMPING ONLY. Cape Lambert yard June 19, 2024.
|
|

IC22-CB08 210510 09205 viewsRobe River compressor waggon set CB08, was originally IC 22 with air receiver and IC 23 with two Kaesir air compressors. These waggons were ballasted to 100 tonnes each and are modified ore waggons. Cape Lambert yard May 10, 2021.
|
|

0266 210322 97804 viewsRobe River ore waggon 266, built by Nippon Sharyo Nihon, rotary coupler end non-handbrake side loaded view at the 17 km on the Cape Lambert line, March 22, 2021.
|
|

0546 180616 16434 viewsRobe River ore waggon 546, built by Tomlinson Steel WA, fixed coupler non-handbrake side loaded view at the 38.5 km, Harding on the Cape Lambert line, June 16, 2018.
|
|

0895 180616 17204 viewsRobe River ore waggon 895, built by Centurion Industries WA, rotary coupler end non-handbrake side empty view at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
|
|

0947 180616 16804 viewsRobe River ore waggon 947, built by Centurion Industries WA, fixed coupler non-handbrake side loaded view at the 33.7 km, Arches on the Cape Lambert line, June 16, 2018.
|
|

1010 180616 17324 viewsRobe River ore waggon 1010, built by Bradken Rail Qld in December 2005, rotary coupler end non-handbrake side empty view at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
|
|

1045 180616 17154 viewsRobe River ore waggon 1044, built by Bradken Rail Qld in March 2012, rotary coupler end non-handbrake side empty view, at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
|
|

IC20-CB07 240619 03194 viewsRobe River compressor waggon CB07 was originally IC 20 with air receiver and IC 21 with two Kaeser air compressors. These waggons were ballasted to 100 tonnes each and are modified ore waggons and used for CD2 DUMPING ONLY. Cape Lambert yard June 19, 2024.
|
|

0106 210322 97733 viewsRobe River ore waggon 106, built by Nippon Sharyo Nihon, rotary coupler end non-handbrake side loaded view at the 17 km on the Cape Lambert line, March 22, 2021.
|
|

1040 180616 18643 viewsRobe River ore waggon 1040, built by Bradken Rail Qld, fixed coupler handbrake side loaded view at Maitland Siding on the Deepdale line, June 16, 2018.
|
|

0005 210322 97652 viewsRobe River ore waggon 005, built by Nippon Sharyo Nihon, rotary coupler end non-handbrake side loaded view at the 17 km on the Cape Lambert line, March 22, 2021.
|
|

0008 210322 97502 viewsRobe River ore waggon 008, built by Nippon Sharyo Nihon, rotary coupler end non-handbrake side loaded view at the 17 km on the Cape Lambert line, March 22, 2021.
|
|

0011 210322 97822 viewsRobe River ore waggon 011, built by Nippon Sharyo Nihon, rotary coupler end non-handbrake side loaded view at the 17 km on the Cape Lambert line, March 22, 2021.
|
|

0031 210322 96942 viewsRobe River ore waggon 031, built by Nippon Sharyo Nihon, rotary coupler end non-handbrake side loaded view at the 17 km on the Cape Lambert line, March 22, 2021.
|
|

0034 210322 97442 viewsRobe River ore waggon 034, built by Nippon Sharyo Nihon, rotary coupler end non-handbrake side loaded view at the 17 km on the Cape Lambert line, March 22, 2021.
|
|

0037 210322 97042 viewsRobe River ore waggon 037, built by Nippon Sharyo Nihon, rotary coupler end non-handbrake side loaded view at the 17 km on the Cape Lambert line, March 22, 2021.
|
|

0086 180616 17112 viewsRobe River ore waggon 086, built by Nippon Sharyo Nihon, rotary coupler end non-handbrake side empty view at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
|
|
18739 files on 937 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
934 |  |
 |
|