Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
051102_6621.jpg
051102 6621439 viewsThevenard, front view of Clyde Engineering EMD JL22C model unit and class leader 1601, originally NJ 1 'Ben Chifley' serial 71-728, built in 1971 at Clyde's Granville NSW workshops, started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981, repainted and renumbered to 1601 in November 2004.
051102_6622.jpg
051102 6622439 viewsThevenard, front view of Clyde Engineering EMD JL22C model unit and class leader 1601, originally NJ 1 'Ben Chifley' serial 71-728, built in 1971 at Clyde's Granville NSW workshops, started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981, repainted and renumbered to 1601 in November 2004.
223-05.jpg
223-05439 viewsRosella Siding, old Hamersley Iron machine transporter, prime mover is a KW Dart, possibly a model DE 2551. 21st October 2000.
150522_8165.jpg
150522 8165439 viewsWedgefield, Sims Metal yard, the first batch of BHP Billiton Dash 8 locos to be scrapped, 5646 serial 8244-11/92-135 and 5647 serial 8244-12/92-136 were a pair of new Goninan WA CM40-8 model built in 1992.
237-06.jpg
237-06439 viewsSign at the turn off to Western Shaw Mining Area at Tambourah on the Hillside - Woodstock Road. 12th Feb, 2003. Geo Data
237-14.jpg
237-14439 viewsJust south of Pilga and the old Cooglegong Mine is this rusting hulk of a Ruston Bucyrus shovel, possibly an RB10, serial RB21269. Geodata .
WTT_East_1981-10-04.pdf
WTT East 1981-10-04439 viewsWorking Time-Table Eastern District, 4th October 1981, complete 75 page PDF download, 6.4 MB.
244-06.jpg
244-06439 viewsPort Augusta yard, a pair of ALF class units on the Darwin line construction are picking up a rail transport consist. ALF 20 and ALF 18 are both Morrison Knudsen rebuilds, model JT26C-2M serials 94-AN-020 and 94-AN-018.
143-14.jpg
143-14438 viewsSpringhurst yard view, broad gauge VR liveried Y class Y 133 Clyde Engineering EMD model G6B serial 65-399 leads the down Wahgunyah mixed 'Stringybark Express' Special as it departs No. 2 Rd for the Wahgunyah line, the track closest to the camera is Siding A, the Wahgunyah line and then No. 2 and No. 1 Rd.
161-17.jpg
161-17438 viewsYarroweyah, V/Line up broad gauge Cobram passenger train hauled by N class locomotive N 465 'City of Ballaarat' Clyde Engineering EMD model JT22HC-2 serial 86-1194 and N set past overgrown former station site, yard behind.
189-10.jpg
189-10438 viewsThe Rock, located at the 550.29 km on NSW Main South line, view looking north with the along the Mainline with the Down Loop at right and the branch line to Oaklands coming in on the left with the ground frame E and signal, the No. 54 points from the Mainline to Up Loop are visible in front of the signal bridge.
195-33.jpg
195-33438 viewsWittenoom Gorge, Australian Blue Asbestos or ABA Colonial Mill, view of the drier.
196-11.jpg
196-11438 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C number 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
193-17.jpg
193-17438 viewsGympie station yard entrance looking north towards Gympie North in the Down direction from the Stewart Terrace overbridge. GeoData.
199-13.jpg
199-13438 viewsMeckering, National Rail NR class unit NR 20 Goninan built GE Cv40-9i model, bogie view of no. 2 end on train 7PM5 as it waits for a cross with the Prospector in the loop 1400 hrs 21st June 1997.
207-20.jpg
207-20438 viewsBHP General Electric built AC6000 unit 6071 serial 51063 brand new and unnamed on the loaded side of Yandi One load-out loop as a remote mid-train unit, showing roof view and the original style windscreen protectors.
218-03.jpg
218-03438 viewsDe Grey River Bridge, former road and rail, now only rail bridge for the Goldsworthy line, looking east, river is in flood.
218-12.jpg
218-12438 viewsDe Grey River Bridge, a loaded Yarrie train crosses the river behind an original Mt Newman Mining ALCo to GE rebuild carried out by Goninan, originally ALCo C636 5458 to GE model C36-7M unit 5510 'Newman' serial 4839-07 / 87-075.
051101_6420.jpg
051101 6420438 viewsParkeston, AHBY 0059 one of sixty five AHBY type ballast hoppers built by EDI Rail at their Port Augusta Workshops for ARG in 2001-02 for the Darwin line, also the FMG construction in 2008, here in limestone quarry products service.
223-11.jpg
223-11438 viewsPossum Siding sign on the Hamersley Iron Dampier to Paraburdoo line, located 228 km from Dampier. 21st October 2000.
19085 files on 955 page(s) 94

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional