Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
240701_2388.jpg
240701 238868 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31552 is a master and is bar coupled to slave waggon 36552 built by China Northen as a Q type in 12/2022. Captured on July 1, 2024.
240701_2416.jpg
240701 241668 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31606 is a master and is bar coupled to slave waggon 36606 built by China Northen as a Q type in 11/2022. Captured on July 1, 2024.
240701_2417.jpg
240701 241768 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31593 is a master and is bar coupled to slave waggon 36593 built by China Northen as a Q type in 11/2022. Captured on July 1, 2024.
240701_2474.jpg
240701 247468 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31527 is a master and is bar coupled to slave waggon 36527 built by China Northen as a Q type in 12/2022. Captured on July 1, 2024.
240701_2498.jpg
240701 249868 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31618 is a master and is bar coupled to slave waggon 36618 built by China Northen as a Q type in 11/2022. Captured on July 1, 2024.
100601_8385.jpg
100601 838567 viewsWest Kalgoorlie, crew accommodation coach RZEY 3, handbrake end detail and number board view, built by South Australian Railways Islington Workshops in 1956 as Tolkini for The Overland, renamed to Malkari in 1957 then coded JTA 3 in 1987, converted to crew coach in 2007 by Bluebird Rail Operations.
100602_8722.jpg
100602 872267 viewsParkeston, Pacific National RZAY type crew accommodation car RZAY 940 was built by Comeng NSW as an ARJ type stainless steel air conditioned first class roomette sleeping car ARJ 240 in 1968, allocated to the Indian Pacific Joint Stock in 1970, renumbered to ARJ 940 in 1974 and sold to National Rail and converted to crew car in 1997.
100603_8865.jpg
100603 886567 viewsParkeston, Pacific National RZDY type crew accommodation car RZDY 103 'Ibis' originally built by SAR Islington Workshops as a Bluebird railcar driving trailer in 1956 named 'Ibis', in 1986 numbered 103, in 1990 converted to locomotive hauled and coded as BR type BR 103, written off in 1995 and sold off. It was owned by a number of owners and finally in 2006 converted to a Pacific National crew car.
100611_0526.jpg
100611 052667 viewsMidland, Pacific National RZBY type crew accommodation car RZBY 208 on train 4PM6, built by Comeng NSW as ER type stainless steel air conditioned crew dormitory car ER 208 in 1969, sold to National Rail and converted to crew car in 1997.
100611_0527.jpg
100611 052767 viewsMidland, Pacific National RZBY type crew accommodation car RZBY 208 on train 4PM6, built by Comeng NSW as ER type stainless steel air conditioned crew dormitory car ER 208 in 1969, sold to National Rail and converted to crew car in 1997.
0091_160306_1554.jpg
0091 160306 155467 viewsRobe River ore waggon 091, built by Nippon Sharyo Nihon, fixed coupler non-handbrake side loaded view at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
0580_170729_0195.jpg
0580 170729 019567 viewsRobe River ore waggon 580, built by Tomlinson Steel WA, fixed coupler handbrake side loaded view at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
0745_160306_1629.jpg
0745 160306 162967 viewsRobe River ore waggon 745, built by Tomlinson Steel WA, fixed coupler non-handbrake side loaded view, stencil says TEST 4, at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
0898_110602_1611.jpg
0898 110602 161167 viewsRobe River ore waggon 898, built by Centurion Industries WA, rotary coupler end handbrake side loaded view at the 71 km, Western Creek on the Deepdale line. June 2, 2011.
0965_081209_0139.jpg
0965 081209 013967 viewsRobe River ore waggon 965, built by Centurion Industries WA, non-handbrake side loaded view at the 7 km location just south of Cape Lambert yard. December 9, 2008.
1000_160727_0981.jpg
1000 160727 098167 viewsRobe River ore waggon 1000, class leader built by Bradken Rail Qld in December 2005, rotary coupler end handbrake side empty view at Harding Siding on the Cape Lambert line, July 27, 2016.
1155_160306_1283.jpg
1155 160306 128367 viewsRobe River ore waggon 1155, built by Bradken Rail Qld in April 2012, fixed coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.
1165_170513_8776.jpg
1165 170513 877667 viewsRobe River ore waggon 1165, built by Bradken Rail Qld in March 2012, handbrake side empty view, Cape Lambert yard, May 13, 2017.
0273_180616_1721.jpg
0273 180616 172167 viewsRobe River ore waggon 273, built by Nippon Sharyo Nihon, rotary coupler end non-handbrake side empty view at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
0281_210322_9790.jpg
0281 210322 979067 viewsRobe River ore waggon 281, built by Nippon Sharyo Nihon, rotary coupler end non-handbrake side loaded view at the 17 km on the Cape Lambert line, March 22, 2021.
19085 files on 955 page(s) 940

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional