Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images. **Note - Due to recent changes to make the gallery mobile friendly, please click the image for full size picture.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
0745_141124_6801.jpg
0745 141124 6801246 viewsRobe River ore waggon 745, built by Tomlinson Steel WA, fixed coupler handbrake side empty view, stencil says TEST 4, at the 25 km at Arches Siding on the Cape Lambert line. November 24, 2014.
0826_170513_8675.jpg
0826 170513 8675246 viewsRobe River ore waggon 826, built by Centurion Industries WA, rotary coupler end handbrake side loaded view, Cape Lambert yard, May 13, 2017.
0828_110602_1673.jpg
0828 110602 1673246 viewsRobe River ore waggon 828, built by Centurion Industries WA, rotary coupler end handbrake side loaded view at the 71 km, Western Creek on the Deepdale line. June 2, 2011.
0170_180616_1734.jpg
0170 180616 1734246 viewsRobe River ore waggon 170, built by Nippon Sharyo Nihon, rotary coupler end non-handbrake side empty view at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
100605_9067.jpg
100605 9067245 viewsParkeston, Pacific National BRS type crew accommodation coach BRS 225, originally built by Victorian Railways Newport Workshops in November 1937 as a rivetted second class sitting car for the Spirit of Progress, in August 1939 coded to BS type BS 4, in July 1977 converted to a mini buffet and coded MRS 1 and then in October 1983 recoded to BRS 225. Painted in V/Line livery in 1992. Ended up with West Coast Railway in the late 1990s, painted in WCR livery Sept 2001, prior to Pacific National ownership and conversion to a crew car.
100606_9594.jpg
100606 9594245 viewsGolden Ridge, CFCLA leased crew accommodation coach CDBY type CDBY 255 'Curlew', originally built by SAR Islington Workshops in 1956 as a Bluebird railcar 'Curlew', later numbered 802 in National Rail service, then to CDBY 255 when converted to crew coach in 2007.
0169_170513_8644.jpg
0169 170513 8644245 viewsRobe River ore waggon 169, built by Nippon Sharyo Nihon, handbrake side loaded view, Cape Lambert yard, May 13, 2017.
0520_060722_7587.jpg
0520 060722 7587245 viewsRobe River ore waggon 520, built by Tomlinson Steel WA, rotary coupler end handbrake side empty view, at the 11.7 km, Cape Lambert. July 22, 2006.
0577_170729_0245.jpg
0577 170729 0245245 viewsRobe River ore waggon 577, built by Tomlinson Steel WA, fixed coupler handbrake side loaded view at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
0594_141124_6821.jpg
0594 141124 6821245 viewsRobe River ore waggon 594, built by Tomlinson Steel WA, fixed coupler handbrake side empty view at the 25 km at Arches Siding on the Cape Lambert line. November 24, 2014.
0674_170513_8626.jpg
0674 170513 8626245 viewsRobe River ore waggon 674, built by Tomlinson Steel WA, rotary coupler end handbrake side loaded view, Cape Lambert yard, May 13, 2017.
0727_160727_0965.jpg
0727 160727 0965245 viewsRobe River ore waggon 727, built by Tomlinson Steel WA, rotary coupler end handbrake side empty view at Harding Siding on the Cape Lambert line, July 27, 2016.
0782_160306_1324.jpg
0782 160306 1324245 viewsRobe River ore waggon 782, built by Centurion Industries WA, fixed coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.
0794_170729_0211.jpg
0794 170729 0211245 viewsRobe River ore waggon 794, built by Centurion Industries WA, fixed coupler handbrake side loaded view at the 103 km, between Maitland Siding and the Fortescue River on the Deepdale line. July 29, 2017.
0511_210322_9741.jpg
0511 210322 9741245 viewsRobe River ore waggon 511, built by Tomlinson Steel WA, rotary coupler end non-handbrake side loaded view at the 17 km on the Cape Lambert line, March 22, 2021.
0703_210322_9769.jpg
0703 210322 9769245 viewsRobe River ore waggon 703, built by Tomlinson Steel WA, rotary coupler end non-handbrake side loaded view at the 17 km on the Cape Lambert line, March 22, 2021.
240619_0365.jpg
240619 0365245 viewsCape Lambert yard, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31551 is a master and is bar coupled to slave waggon 36551 built by China Northen as a Q type in 12/2022. Captured on June 19, 2024.
240619_0372.jpg
240619 0372245 viewsCape Lambert yard, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31642 is a master and is bar coupled to slave waggon 36642 built by China Northen as a Q type in 11/2022. Captured on June 19, 2024.
100601_8386.jpg
100601 8386244 viewsWest Kalgoorlie, crew accommodation coach RZEY 3, handbrake end detail and number board view, built by South Australian Railways Islington Workshops in 1956 as Tolkini for The Overland, renamed to Malkari in 1957 then coded JTA 3 in 1987, converted to crew coach in 2007 by Bluebird Rail Operations.
100601_8391.jpg
100601 8391244 viewsWest Kalgoorlie, crew accommodation coach RZEY 3, built by South Australian Railways Islington Workshops in 1956 as Tolkini for The Overland, renamed to Malkari in 1957 then coded JTA 3 in 1987, converted to crew coach in 2007 by Bluebird Rail Operations.
19447 files on 973 page(s) 949

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Australian flag  Valid XHTML 1.0 Transitional