Most viewed |

223-20437 viewsPossum Siding, Hamersley Iron loco 7082 a General Electric built Dash 9-44CW serial 47761 leads sister unit 7080 with an empty train just inside the loop waiting to effect a crew change. 21st October 2000.
|
|

151111 9495437 viewsNear the 38 km post, an empty train lead by General Electric ES44DCi units 8160 and 8193 serials 60224 and 61852 and General Electric Dash 9-44CW 7074 serial 47743 power under the water supply pipeline on the Cape Lambert line.
|
|

150522 8156437 viewsWedgefield, Sims Metal yard, the first batch of BHP Billiton Dash 8 locos to be scrapped, 5646 serial 8244-11/92-135 one of a pair of new Goninan WA built CM40-8 units has already had most of the hood removed and the V16 7FDL prime mover is visible, sister unit 5647 sit along side with the same fate coming up next.
|
|

160524 3824437 viewsWest Kalgoorlie, 2PM6 intermodal train, RRZY type five unit bar coupled well container waggon set RRZY 7028 platform 1, originally built by Goninan in a batch of twenty six as RQZY type for National Rail, recoded when repaired. Loaded with an SCF 40' half height side door container SCFU 607079[5] double stacked with Toll 53' car container AB 031.
|
|

210321 9304437 viewsBoodarie on the 5 km curve loaded FMG master ore waggon 6746 was built by CSR Yangtze with a prototype pressed lower panels and is joined to 5745. This pair is the same as 3005 - 4006. 21st March 2021.
|
|

120-13436 viewsSeymour loco depot, V/Line broad gauge loco B class B 64 Clyde Engineering EMD model ML2 serial ML2-5, No.2 end.
|
|

108-17436 viewsToolamba station building and sign, platform edge cut back, platform track removed, Ford XE Falcon.
|
|

123-2-06436 viewsMaffra, track view looking towards Tinamba, sidings for former Nestles complex, Murray Goulburn Co-op.
|
|

134-08436 viewsKagaru, up arrival signal, north end of loop, looking south.
|
|

186-18436 viewsWoodbridge, National Rail intermodal train 4MP5 on approach to Woodbridge Rd grade crossing as it enters the Forrestfield end of the Woodbridge Triangle.
|
|

194-37436 viewsYandi campsite for Henry Walker operated iron ore mine owned and managed by BHP, view of camp are from man cage on Kato 50 tonne hydraulic crane.
|
|

196-16436 viewsYandi Two loaded car side of the loadout balloon loop, loaded train departing behind BHP Iron Ore triple CM40-8M units, 5662 'Port Kembla' serial 8412-07 / 94-153 rebuilt by Goninan in 1994 from Comeng NSW built ALCo M636C #5490 serial C6084-6 from 1974, leading two similar sister units. May 1998.
|
|

206-14436 viewsWhere Carawine Creek joins the Oakover River.
|
|

208-1-12436 viewsToodyay, emus at the Free Range Emu Farm.
|
|

208-2-08436 viewsToodyay, emus at the Free Range Emu Farm.
|
|

212-09436 viewsWeipa, a loaded train from Andoom Mine rounds the curve on approach to Lorim Point behind Comalco R 1004 Clyde Engineering EMD JT26C serial 90-1277 which is former Goldsworthy Mining loco GML 10.
|
|

216-19436 viewsDry Creek Motive Power Centre, fuel point shed, standard gauge road on the left with 600 class 606 AE Goodwin ALCo model DL541 serial G6015-5 and dual gauge road on the left with BL class BL 32 Clyde Engineering EMD model JT26C-2SS serial 83-1016.
|
|

030406 084715436 viewsTooligie, station yard overview looking north from the south end points, point lever and indicator, silo complex and outflow spouts on the left, old ballast pile on the right, former siding to the right of the mainline can still be made out for ballast loading site, 6th April 2003.
|
|

030411 085258436 viewsBuckleboo, the end of the line looking north, a once planned extension onto the Pinkawillinie lands never proceeded. Geodata here.
|
|

030411 105925436 viewsKimba, rail recovery winch waggon EZWL 2, built using underframe of broad gauge horse box BH 4331. To Eyre Peninsula 1992, recoded then from AZWL. Scrapped in 2005.
|
|
19085 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
96 |  |
 |
 |
 |
 |
 |
 |
|