Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
050801_4728.jpg
050801 4728227 viewsFlash Butt yard, Barclay Mowlem tamping machine TM 8644 a Tamper HSTR 130 model serial 3581011. 1st August 2005.
060501_3930.jpg
060501 3930227 viewsAbydos Siding backtrack, Speno rail grinder RG 2 coupled to RG 1. 1st May 2006.
110208_9427.jpg
110208 9427227 viewsFlash Butt yard, rail recovery and transport train flat waggon rear lead off waggon 6203, built by Comeng WA in January 1977. The straddle crane is a newish unit built by Vaia Car model no. TCR-V and the four wheels are chain driven, replacing the original Gemco hydraulic unit.
110208_9435.jpg
110208 9435227 viewsFlash Butt yard, new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, squeeze roller location.
110411_10021.jpg
110411 10021227 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0016 from 1974-5, one of six such tank waggons.
150523_8224.jpg
150523 8224227 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0033, one of a second batch delivered in 2015 with safety slogan 'Don't drive tired'.
240-20.jpg
240-20227 viewsWickham, left hand side number one end view of former Robe River and NSWGR MLW built ALCo RSC3 serial 77737 of October 1951. Shows modified bogie to convert the A1A to a BO bogie type. 31st August 2002.
243-15.jpg
243-15227 viewsNelson Point departure yard, BHP Billiton's CM40-8M unit 5634 'Boodarie' a Goninan WA GE rebuild unit serial 8151-07 / 91-120 in the new 'earth' or 'bubble' livery as it heads up an empty train waiting departure time. August 2003.
080124_1631.jpg
080124 1631227 viewsChapman Siding, side view of control waggon 2314, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 24th January 2008.
247-12.jpg
247-12227 viewsCape Lambert, Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here in the South Yard dragging a loaded rake down to the car dumper. Approximate location of train is here. 22nd May 2002.
247-13.jpg
247-13227 viewsCape Lambert overview of the fuel point, with a brace of four CM40-8M rebuilds finishing up refuelling before departing with another empty train. The workshops are to the left of the picture. Where I'm standing to take the picture is now all stockpile. Approximate location of photo is here. 22nd May 2002.
249-07.jpg
249-07227 viewsYule River bridge looking north east upstream the third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
249-17.jpg
249-17227 viewsTable Hill on the Robe River railway line, looking in a northerly direction as the railway line snakes north and heads through Lockyer Gap towards Cape Lambert. Following a very wet 1999 cyclone season Lake Poongkaliyarra is very full. Approximate location.
252-10.jpg
252-10227 viewsCockatoo Siding 273 km on the Hamersley Iron line to Yandi, National Steel Car Company of Canada built ballast hopper waggon BH 058 built in January 1971. A batch of twenty were built for Hamersley Iron. Location is roughly here. 24th November 2001.
267-07.jpg
267-07227 viewsGoldsworthy Junction, BHP's 1230 empty departure behind General Electric AC6000 unit 6076 'Mt Goldsworthy' serial number 51068 leads CM40-8MEFI 5669 on the point with mid-train units CM40-8M units 5651 and 5645 104 waggons back with 104 waggons trailing. 1247 hrs 12th of April 2002.
267-26.jpg
267-26227 viewsOn approach to the 39 km Detector Site the Sundowner Special runs along the Newman Mainline behind BHP Iron Ore's Goninan rebuild CM40-8M unit 5634 'Boodarie' serial number 8151-07 / 91-120 with sister 5653 on the rear. Friday 12th of April 2002.
040804_155856.jpg
040804 155856227 viewsNelson Point, empty BHP ore waggon 1354 is a Comeng WA build from a batch of two hundred and twenty-six in 1973/74. Waggon has been resheeted with new side walls. 4th of August 2004.
110620_2296r.jpg
110620 2296r227 viewsWalla, loaded BHP ore waggon 1418 is a Goninan WA build to the Golynx design as a replacement body from February 2011. This replaces the original Comeng WA waggon of the same number. 20th of June 2011.
040912_152402r.jpg
040912 152402r227 viewsNelson Point, condemned Comeng WA built BHP ore waggon 1560, used here as a ground anchor on Stacker 4. Waggon 1560 was built in an order of two hundred and eighty-eight waggons in 1974. 12th of September 2004.
226-22.jpg
226-22226 viewsShaw siding back track at the 219 km, Speno RR 24 M-1 rail grinder stabled in back track, side view. GeoData.
4058 files on 203 page(s) 100

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional