Most viewed - Pilbara negative and digital Albums - Iron Ore |

241-14164 viewsNelson Point, Goninan GE rebuild C36-7M unit 5510 serial 4839-07 / 87-075 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. Drivers side view with hood doors open, the Dash 8 radiator frame fitted to it following collision repairs is also evident. June 2002.
|
|

150619 9091164 viewsFlash Butt yard, Speno owned and operated rail grinder RG2 for BHP, rail grinding module, from the left, water tank, electrical cabinet, blower fans and filter housing, water tank, water tank, electrical cabinet, blower fans and filter housing, fuel tank.
|
|

080116 1376164 viewsChapman Siding, FMG slave waggon 1187, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China during 2007, view of the number decal builders plate and bracket for RFID tag with the last painted date placard. 16th January 2008.
|
|

249-07164 viewsYule River bridge looking north east upstream the third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

225-12163 viewsBing siding, looking south, signal post BGN 3 arrival signal for south bound movements, empty train heading south, 5669 'Beilun' serial 8412-02 / 95-160 was the final Dash 8 rebuilt for BHP Iron Ore by Goninan as a CM40-8MEFI GE rebuilt from an ALCo, light engine on approach. GeoData.
|
|

226-14163 viewsShaw North, 216.5 km, expanded view with arrival signal SWN 3 Shaw North 3 which is at the top of the steep 1.5 percent climb that south bound empties face. Dragging equipment detection bars visible, they are painted yellow and the interlocking room with the north end points and the departure signals and repeater posts due to the large curve loaded trains face. GeoData.
|
|

226-28163 viewsShaw siding at the 219 km a loaded train with power from two Goninan CM40-8M GE rebuild units 5642 'Wallareenya' serial 8281-07 / 92-131 and sister unit 5636, the mid-train remotes can be seen in the distance topping the grade. GeoData.
|
|

227-20163 views30 km area on the Newman mainline, east of the original Quarry 1, an empty train powers along the gentle .17% rising grade behind a pair of Goninan CM40-8M GE rebuild units and an General Electric AC6000. GeoData.
|
|

227-30163 views25 km signal location on the BHP Newman mainline. 25 S for south bound trains, the other signal is 25 N. GeoData.
|
|

227-32163 views25 km signal location on the BHP Newman mainline. 25 S for south bound trains, the other signal is 25 N. GeoData.
|
|

229-30163 viewsYandi Two loadout exit side, as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 and sister unit drag a loading train at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan, on the left the mid-train remotes can just be made out. GeoData.
|
|

231-23163 viewsYandi Two balloon loop, BHP Iron Ore 5650 'Yawata' serial 8412-09 / 93-141 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h as second unit, note the logos are the original teal and marigold and the round style fuel tanks tells us this units was rebuilt from an AE Goodwin built M636 ALCo. GeoData.
|
|

231-28163 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h, note the missing logo from the hood and the round style fuel tanks tells us this units was rebuilt from an AE Goodwin built M636 ALCo. GeoData.
|
|

232-28163 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 shows the cab front with the sheet metal windscreen protectors. 18th of February 1997. GeoData.
|
|

233-14163 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

040806 101952163 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, view of number board and 50 t load stencil.
|
|

040810 144906163 viewsShaw Siding backtrack, Difco Ohio USA 1967 build short side dump waggon 8701, originally built for Goldsworthy Mining as no. 1, renumbered by Mt Newman as 8701, one five waggons built for Goldsworthy Mining.
|
|

050412 0750163 viewsQuarry 8, Shaw Siding area. Side view of 1963 built Magor USA waggon 527, originally in ore service before conversion to a ballast waggon.
|
|

050412 0778163 viewsQuarry 8 loading area, view from rear of train with Magor USA built ballast rake.
|
|

050518 2076163 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 753.
|
|
4019 files on 201 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
100 |  |
 |
 |
 |
 |
 |
 |
|