Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
080124_1631.jpg
080124 1631393 viewsChapman Siding, side view of control waggon 2314, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 24th January 2008.
249-09.jpg
249-09393 viewsYule River bridge looking east upstream the third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
252-08.jpg
252-08393 viewsCockatoo Siding 273 km on the Hamersley Iron line to Yandi, General Electric built 9-44CW unit 7088 with serial number 47767 from the original 1994 build idles away on the eastern end of the ballast train as it is loaded and slowly progresses into the back track siding Ballast plough BP 02 is behind the locomotive. View of the long hood, fuel tank and lettering. Location is roughly here. 24th November 2001.
283-23.jpg
283-23393 viewsHarding Siding, Robe River's Goninan GE rebuild CM40-8M unit 9414 serial number 8206-11 / 91-124 leads the typical quad power with 9420, 9410 and 9425 as they run along the loop road as part of the bedding down process. 9414 was rebuilt from AE Goodwin built M636 ALCo model with original serial number G-6060-5 from 1971. Wednesday 22nd May 2002.
221-27.jpg
221-27392 viewsYandi One mine loadout balloon loop, a pair of General Electric AC6000 units lead a train being loaded around the balloon, overview of the stockpile with stacker fill the hole from loading.
225-00.jpg
225-00392 viewsWalla siding area, the East Turner River is in flood, flowing with the bridge at the 55.5 km in the background.
236-06.jpg
236-06392 viewsNelson Point, Loco Overhaul Shop, BHP Dash 8 class locomotive 5653 'Chiba', a Goninan 1994 rebuild to GE CM40-8M model, serial 8412-10 / 93-144.
238-17.jpg
238-17392 viewsNelson Point, ex Southern Pacific tunnel motor locomotive 8335 an EMD SD40T-2 unit, serial 786175-9 built in April 1979 and retired by Union Pacific 23rd May 2001, purchased as a spare parts source for the other SD40 style units BHP Billiton purchased in 2003/04. 19th November 2003. Geodata .
239-22.jpg
239-22392 viewsOverview of Yandi One OHP plant as viewed from the head end of CV2 conveyor which runs from the primary crusher to the reclaim pile. Visible from the left is the screen house, radial stacker on the stockpile, power station, new and old side tertiary crushing structures, sub-station 4, the control room and on the extreme right the secondary crusher structure. GeoData.
050518_2091.jpg
050518 2091392 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 747.
050518_2187.jpg
050518 2187392 viewsBing Siding. Side view of 1963 built Magor USA waggon 519, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
050704_3980.jpg
050704 3980392 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0018 from 1974-5, one of six such tank waggons, detail of the B end and bogie, wearing the BHP Billiton Earth livery.
050801_4766.jpg
050801 4766392 viewsFlash Butt yard, rail recovery and transport train, 1st lead off waggon 6011, built by Scotts of Ipswich Qld on 04-09-1970, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible.
051001_5626.jpg
051001 5626392 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, view of handbrake end, pushed into earth bund.
051001_5641.jpg
051001 5641392 viewsFlash Butt yard, side view of ballast plough converted from Magor USA built Oroville ore waggon 538, shows bogie and hand brake detail.
051001_5719.jpg
051001 5719392 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #26, 6015, builders plate, a Comeng WA built flat waggon from 1971.
050409_0404.jpg
050409 0404392 viewsShell Swagman Roadhouse, rear view of Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480. 9th April 2005.
050414_0948.jpg
050414 0948392 viewsFlash Butt yard, Speno Australia's RR24 model 24 stone rail grinder serial M20 before it had id stickers fitted, this unit was later stickered as RG 1, rear view of the generator and driving module. 14th April 2005.
050625_3811.jpg
050625 3811392 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, some Barclay Mowlem track machines are off clear of the running lines, a sleeper crane is at the front with three sleeper inserters behind. 25th June 2005.
050917_5515.jpg
050917 5515392 viewsCoon Siding, view of the tamper operators cabin location on Switch Tamper SW 02 is a Plasser Australia model Unimat S4 switch tamper. 17th September 2005.
6096 files on 305 page(s) 101

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional