Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
225-00.jpg
225-00424 viewsWalla siding area, the East Turner River is in flood, flowing with the bridge at the 55.5 km in the background.
225-11.jpg
225-11424 viewsBing siding, looking south, signal post BGN 3 arrival signal for south bound movements, empty train heading south, 5669 'Beilun' serial 8412-02 / 95-160 was the final Dash 8 rebuilt for BHP Iron Ore by Goninan as a CM40-8MEFI GE rebuilt from an ALCo, light engine on approach. GeoData.
228-20.jpg
228-20424 viewsYandi Two branch, the afternoon empty train crosses the bridge at the YT307 km behind a standard pair of Goninan rebuilt GE CM40-8M model units 5649 'Pohang' serial 8412-07/93-140 and 5644 'Kangan' serial 8281-09/92-133. Geodata -22.706976, 119.097651 .
230-00.jpg
230-00424 viewsYandi Two switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. Geodata -22.713725, 119.055762 .
230-02.jpg
230-02424 viewsYandi Two switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. Geodata -22.713725, 119.055762 .
231-19.jpg
231-19424 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
232-24.jpg
232-24424 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, waggons are standard Comeng WA builds. 18th of February 1997. GeoData.
236-04.jpg
236-04424 viewsNelson Point, Loco Overhaul Shop, BHP Dash 8 class locomotive 5653 'Chiba', a Goninan 1994 rebuild to GE CM40-8M model, serial 8412-10 / 93-144, view of drivers side of cab.
239-14.jpg
239-14424 viewsOverview of the Yandi One Jaques J-Cone secondary crusher and scalping screen as viewed from above the middling crushers, looking down CV6. The conveyor from the right is CV3 from the primary crusher and reclaim tunnel. The bus in the background is parked at the offices and was usually driven by 'Tangles' the sampler. GeoData.
040806_091154.jpg
040806 091154424 viewsGoldsworthy Junction, trailing view of the weighbridge test train with the four orange weighbridge test waggons and two Comeng built ore waggons to provide braking, 5666 is the power.
040806_092434.jpg
0507 Mt Newman Mining Workshops 040806 092434424 viewsGoldsworthy Junction, weighbridge test waggon 507, originally built by Magor USA and ex Oroville Dam, converted by Mt Newman Mining into a 20 ton axle load test waggon coupled to 510.
040806_092738.jpg
0510 Mt Newman Mining Workshops 040806 092738424 viewsGoldsworthy Junction, weighbridge test waggon 510 originally built by Magor USA and ex Oroville Dam, converted by Mt Newman Mining into a weighbridge test waggon. The others in the fleet are 40, 60 and 100 tons.
040810_145007.jpg
8705 Difco USA 040810 145007424 viewsShaw Siding backtrack, Difco Ohio USA 1967 build short side dump waggon 5, originally built for Goldsworthy Mining, but not yet renumbered by BHP Iron Ore, it should be 8705, one five waggons built for Goldsworthy Mining.
050412_0772.jpg
0502 Magor USA 050412 0772424 viewsQuarry 8, Shaw Siding area. Side view of 1963 built Magor USA ballast waggon 502.
050518_2117.jpg
CHRY 746 050518 2117424 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 746, rear view of hydraulics and pneumatics.
050518_2166.jpg
0523 Magor USA 050518 2166424 viewsBing Siding. Side view of 1963 built Magor USA waggon 523, originally in ore service before conversion to a ballast waggon.
050518_2204.jpg
0532 Magor USA 050518 2204424 viewsBing Siding, view of hand brake detail and original markings on ballast waggon 532.
051001_5686.jpg
6209 Comeng WA 051001 5686424 viewsBoodarie, the Steel Train or rail recovery and transport train, hand brake end of waggon #12, 6209, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
051001_5737.jpg
6201 Comeng WA 051001 5737424 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #28, 2nd lead off waggon 6201, built by Comeng WA in January 1977 under order no. 07-M-282 RY, with the Gemco built straddle crane.
060429_3758.jpg
060429 3758424 viewsFlash Butt yard, Pony re-laying waggon, builders plate originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966.
6220 files on 311 page(s) 106

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional