Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
170510_8283.jpg
170510 8283389 viewsRio Tinto compressor waggon set CB 09, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 10th May 2017.
171121_0964.jpg
171121 0964389 viewsBarker Siding, Loram rail grinder MPC 2, control and grinder car. 21st November 2017.
080116_1380.jpg
080116 1380389 viewsChapman Siding 69 km, the Zhuzhou Rolling Stock Works cast bogie underneath FMG master waggon 2372, bogie has a cast date of 08-07 for August 2007 and is riding on Timken AP Glass G 7 x 17 bearings. 16th January 2008.
080304_2171.jpg
080304 2171389 viewsThomas Yard, down the rail welding end, side view of slave waggon 1241, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
246-06.jpg
246-06389 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
247-16.jpg
247-16389 viewsCape Lambert, Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here dragging a loaded 101 waggon rake down to the car dumper. 22nd May 2002.
248-09.jpg
248-09389 viewsDingo Siding on the Hamersley Iron railway at the 39 km with an empty train headed up by a pair of General Electric built Dash 9-44CW units 7077 serial 47756 from the original first order in the Pepsi Can livery and 9408 serial 54158 from the fourth order in the Pilbara Rail livery with Robe ownership markings. The signal marker boards are in the distance. Approximate location. 24th April 2004.
251-05.jpg
251-05389 viewsNelson Point, BHP's recently retired Goninan WA ALCo C636 to GE C36-7M rebuild unit 5513 awaits its fate. Rebuilt in 1988 at Goninan's Welshpool factory from 1970 AE Goodwin built ALCo C636 with serial number G6012-2 and road number 5453 and assigned new serial number 4839-02 / 88-078. It was delivered in Mt Newman Mining orange and was named Kalgan. 22nd April 2000.
256-16.jpg
256-16389 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.
267-18.jpg
267-18389 viewsGoldsworthy Junction, the Sundowner Special is on the Newman mainline leg of the Goldsworthy Junction and triangle, with the Sundowner coach in between CM40-8M GE unit 5634 'Boodarie' serial number 8151-07 / 91-120 and sister CM40-8M 5653. This train, and the empty before it, were delayed due to a jamming switch for the transfer road where Tamper 2 and Ballast Regulator 31 can be seen holding track. The road curving around to the left is the Goldsworthy mainline to Boodarie and Finucane Island. Friday 12th of April 2002.
268-31.jpg
268-31389 viewsAt the 39 km detection site with the Alstom 25-year special, the Sundowner coach, originally built by E. G. Budd in 1939 numbered 301 as the Silver Star, a diner-parlour-observation coach on the Chicago, Burlington and Quincy Railroad's General Pershing Zephyr train from the 1930s and 1940s. Donated to Mt Newman Mining Co. by AMAX an original joint venture partner to commemorate the projects first 100 million tonnes of iron ore railed between Mount Whaleback mine and the Port Hedland port. 12th of April 2002.
040718_151441.jpg
040718 151441389 viewsNelson Point, Car Dumper 3, BHP ore waggon 1918, originally built by Comeng WA in 1975 as part of a batch of one hundred and seventy-five waggons. Seen here with replacement sides out of 3CR12Ti type steel to the then current Goninan style. 18th of July 2004.
110620_2356r.jpg
110620 2356r389 viewsWalla, loaded BHP ore waggon 9065, renumbered from original Comeng WA build waggon 2701 which was originally built in 1971 as part of a batch of four hundred waggons. The renumbering would be due to a new waggon replacing a potential scrap waggon, which then has been returned to service. 20th of June 2011.
221-24.jpg
221-24388 viewsYandi One mine loadout balloon loop, overview of the stockpile, the train can be seen in the middle distance on the right.
221-25.jpg
221-25388 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible.
227-33.jpg
227-33388 views25 km signal location on the BHP Newman mainline. 25 S for south bound trains, the other signal is 25 N. GeoData.
229-27.jpg
229-27388 viewsYandi Two loadout exit side, Goninan rebuild CM40-8M GE units 5650 'Yawata' serial 8412-07 / 93-141 and sister unit 5642 drag a loading train at 1.2 km/h, both units carry the BHP Iron Ore teal and marigold livery for the logo. GeoData.
230-02.jpg
230-02388 viewsYandi Two switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. Geodata -22.713725, 119.055762 .
231-01.jpg
231-01388 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
233-14.jpg
233-14388 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
6096 files on 305 page(s) 107

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional